HomeMy WebLinkAbout~Master - Secondary Contract Renewal and Bond for Underground Trenching Contract RESOLUTION NO. 23-422
RESOLUTION APPROVING CONTRACT RENEWAL AND BOND FOR
UNDERGROUND TRENCHING CONTRACT FOR ELECTRIC SERVICES
FOR THE CITY OF AMES
WHEREAS,the contract consists of a contractor furnishing all equipment,tools,labor,and
materials not supplied by Electric Services for excavating, trenching, directional boring, and
backfilling for installation of conduits, ground sleeves, box pads, vaults, handholes, and other
appurtenances; and,
WHEREAS, the work consists of emergency service, as well as regularly planned repairs
and services. To ensure availability of contractors, Electric Services contracts with a primary
trenching contractor and a secondary trenching contractor. The secondary contractor is utilized
when the primary contractor is unavailable; and,
WHEREAS, on June 25, 2019, City Council awarded the secondary contract to Zoske
Electrical Services, Inc., Des Moines, Iowa. The contract contained the option to renew for four
additional one-year periods. The period ending June 30, 2024, is the fourth renewal period; and,
WHEREAS, the contract includes a rate provision which increases rates at fixed
percentages above the previous fiscal year contracted rates at time of renewal. For the secondary
contract with Zoske Electrical Services, Inc., the fixed rates for FY 2023/24 include a labor
increase of 3% and no increases for equipment and tools; and,
WHEREAS, the approved FY 2023/24 operating budget for Underground System
Improvements contains $600,000. Trenching and excavation services are included in this amount.
The trenching and excavation services covered by this contract would also be used for the
relocation of Electric Services facilities to clear sites for Public Works roadway improvement
projects.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that the secondary contract renewal with Zoske Electrical Services, Inc., of Des Moines, Iowa, for
the Underground Trenching Contract for Electric Services through June 30, 2024, in an amount
not-to-exceed $100,000 as follows:
Section 1. The Contract between the City of Ames, Iowa, and Zoske Electrical Services,
Inc., of Des Moines, Iowa, in the amount of$100,000 dated the 1 lth day of July, 2023, for
the Underground Trenching Contract as provided for in the detailed plans and
specifications referred to in the preamble hereof, and the performance bond of the said
contractor with Employers Mutual Casualty Company, of Des Moines, Iowa, as surety
thereon, in the amount of $100,000 filed in connection therewith, be and the same are
hereby approved.
Section 2. All resolutions or order or parts thereof in conflict herewith are hereby repealed
to the extent of such conflict.
ADOPTED THIS 181h day of July, 2023.
e4 W- 410e 4��
Renee Nall, City Clerk John A. Haila, Mayor
Introduced by: Corrieri
Seconded by: Gartin
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins
Voting nay: None Absent:
Resolution declared adopted and signed by the Mayor this 181h day of July, 2023.