RESOLUTION APPROVING AMENDMENT NUMBER 1 TO THE PROFESSIONAL
SERVICES AGREEMENT WITH STRAND ASSOCIATES FOR DESIGN PHASE
SERVICES RELATED TO THE WATER POLLUTION CONTROL FACILITY
NUTRIENT REDUCTION MODIFICATIONS PROJECT IN THE AMOUNT OF
$763,000 FOR THE CITY OF AMES,IOWA
WHEREAS, on June 28, 2022, the City Council approved a professional services
agreement with Strand Associates for the planning, design, and bidding phases of the Water
Pollution Control Facility (WPCF) Nutrient Reduction Modifications Project. The agreement
provided for a fee of $1,655,000, plus $20,000 hourly services for extraordinary permitting
assistance as needed; and,
WHEREAS, the City Council resolution for that award included the following: "...It is
important to note that the Scope of Work is likely to change during the design phase as the details
of the project become better defined...'; and,
WHEREAS, when the City Council approved the original agreement with Strand
Associates in June 2022,changes to the scope of work were anticipated,as the details of the project
were still being developed and refined. Two significant design changes (the relocation of the
Administration Building and the change to constructing the project in two phases instead of three)
have necessitated a revision to the scope and associated fees. Staff has met with the consultant and
reviewed the modified scope of work line by line to ensure that the additional fees are truly
associated with work that was not included in the original agreement; and,
WHEREAS,the additional professional services related to the proposed change order were
anticipated; are in response to design changes approved by staff; are within the adopted project
budget; and were already accounted for in the rate projections shared with the City Council during
the budget process; and,
WHEREAS,additional design phase services may still be needed for elements that are not
captured in this amendment. As an example, the extent of storm water management that will be
required by Story County is still not fully known. The scope presumes that storm water
management will be limited to the area disturbed by the project; but if the County chooses to
require storm water management for the entire property, that would be outside the scope of the
agreement. Also not included at this time are any needed improvements to the City-owned south
access road; and,
WHEREAS, the City Council should also be aware that an additional amendment will be
needed around the time of award of the construction contract. This future change order will add
construction phase engineering services such as shop drawing review,pay request review, change
order preparation, and State Revolving Fund coordination with the Iowa Department of Natural
Resources and the Iowa Finance Authority. It may also include Resident Project Review to provide
continuous construction oversight.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that amendment Number 1 to the professional services agreement with Strand associates for design
phase services related to the Water Pollution Control Facility Nutrient Reduction Modifications
Project in the amount of$ 763,000 is hereby approved.
ADOPTED THIS 9th day of May, 2023.
64w- � e -
Renee kall, City Clerk John A. Haila, Mayor
Introduced by: Gartin
Seconded by: Beatty-Hansen
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 9th day of May, 2023.