HomeMy WebLinkAbout~Master - Change Order No. 4 HDR Engineering, Inc. for New Water Wells RESOLUTION NO. 22-622
RESOLUTION APPROVING CHANGE ORDER NO. 4
ON CONTRACT WITH
HDR ENGINEERING,INC.
FOR ENGINEERING SERVICES FOR NEW WATER WELLS
FOR THE CITY OF AMES,IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper on the
above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Change Order No. 4 in the amount of$73,600 on contract with HDR Engineering, Inc. of
Ames,Iowa,for the Engineering Services for new water wells be approved and adopted as attached
hereto and made a part hereof by this reference.
ADOPTED THIS 131h day of December, 2022.
e4w- / ze i::::�
Renee kall, City Clerk John A. Haila, Mayor
Introduced by: Betcher
Seconded by: Corrieri
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 13th day of December, 2022.