Loading...
HomeMy WebLinkAbout~Master - approving retainage reduction for City Buildings Access Control Project RESOLUTION NO. 22-514 RESOLUTION APPROVING RETAINAGE REDUCTION FOR CITY BUILDINGS ACCESS CONTROL PROJECT FOR THE CITY OF AMES,IOWA WHEREAS, previously City Hall, all three Fire Stations, and the Power Plant had access to the building exterior and interior doors through the use of physical keys. Transitioning to a keyless access control system was determined to improve security. This access control system uses cards and electronic readers instead of physical keys. The electronic system provides automatic locking/unlocking of doors, alarms for unauthorized propping of doors, tracking after-hours access, and the ability to remotely control card access. Public groups using City Hall conference rooms after hours can enter the building at specified times without having to arrange pick up for a physical key; and, WHEREAS, the contract for the bid showed a lump sum in the amount of$253,949 for City Hall and the three Fire Stations. With this being a public bid, the City keeps a 5-percent retainage on the project until final completion. The installation of the new system at City Hall and the Fire Stations has been completed for several months. City staff believes the portion of the retainage on the City Hall and Fire Station installation should be released since that portion of the project has been completed; and, WHEREAS,the contract for the bid showed a lump sum in the amount of$390,327 for the Power Plant. Supply chain issues have impacted the ability of the contractor to complete the Power Plant installation and there is remaining work as well as punch list items left to complete. At this time retainage is not being released for the portion of the Power Plant project due to this remaining work; and, WHEREAS, the City Hall and Fire Station project has completed three change orders on the project totaling $38,598. The first change order in the amount of $18,159, was for power transfer hinges so there is no visible wiring at the double doors in City Hall, the second change order was an enrollment reader, additional cabling, and pathway for $3,997, and the third change order was for lock down buttons, courtyard door hardwiring, additional programming, an additional door lock, and an unlock button for the Court office in the amount of$16,442. With the approval of these three change orders, the total project cost for the City Hall and Fire Station project is $292,547. This equates to $14,627 in retainage being withheld. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that the retainage reduction for City Buildings Access Control Project is hereby approved. ADOPTED THIS 27th day of September, 2022. Renee kall, City Clerk John A. Haila, Mayor Introduced by: Betcher Seconded by: Beatty-Hansen Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Rollins Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 27th day of September, 2022.