HomeMy WebLinkAbout~Master - Change Order No. 2 on Contract with Keller Excavating, Inc., for Prairie View Industrial Center Utilty Extension Project RESOLUTION NO. 22-438 RESOLUTION APPROVING CHANGE ORDER NO. 2 ON CONTRACT WITH KELLER EXCAVATING, INC. FOR PRAIRIE VIEW INDUSTRIAL CENTER UTILITY EXTENSION PROJECT FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 2 in the amount of$2,210,255.72 on contract with Keller Excavating, Inc., of Boone, Iowa, for the Prairie View Industrial Center Utility Extension Project be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 9`' day of August, 2022. R ee Hall, City Clerk John A. Haila, Mayor Introduced by: Rollins Seconded by: Junck Voting aye: Betcher, Corrieri, Gartin, Junck, Rollins Voting nay: None Absent: Beatty-Hansen Resolution declared adopted and signed by the Mayor this 9" day of August, 2022. CITY OF A14ES PUBLIC WORKS - ENGINEERING DIVISION DatL- 9-AU - 2 �; .ITY cF CONTRACT CHANGE ORDER# 2 P.O.# 59817 Am e 5 ACCT#vARlous PROJECT: Prairie View Industrial Center Utility Extension Project CONTRACTOR CHANGE ORDERS APPROVED TO DATE. 1 ($206.40) # PREVIOUS APPROVED Keller Excavating _ _____-____ 2 # CHANGE ORDERS - -- ---------- (Name) 3 # -$206.40 1133 155tr Street '_ ...____»__�_ ------------------------ 4 # ORIGINAL CONTRACT (Address) 5 # $6,168,791 A0 Boone.-IA 50036 �`� 6 # CURRENT ADJUSTMENT -------- ----------------------- --------------------------- (Cy.State,ZIP) 7 # $2,210,255.72 S # C:,'MULA7VE:MANGE 9 # ORDER AMOUNT 10 # $2.210A62.12 Requires City Council Approval ACJUSTED CONTRACT S3.378.340.72 The Contract is hereby modified and amended as follows: ITEM DESCRIPTION UNIT PRICE QUANTITY TOTAL 1 ON-SITE TOPSOIL CY $8 co 2,800.00 $22,400 00 2 REMOVAL:CULVERTS EACH $600.00 2.00 $1,200 00 3 TRENCH FOUNDATION TON $150.00 1 00 $150.00 4 REPLACEMENT OF UNSUITABLE BACKFILL MAT CY $33.00 18.00 $594 00 5 SANITARY SEWER GRAVITY MAIN,TRENCHED, LF $98.00 500 000 $49,000,00 6 SANITARY SEWER GRAVITY MAIN,TRENCHED, LF $168.00 2.000.00 $336,000.00 7 SANITARY SEWER GRAVITY MAIN,TRENCHED. LF $208.00 1,563,00 $325,104.00 8 PIPE CULVERTS.TRENCHED, 18 INCH LF $120.00 38.00 $4,560.00 9 PIPE APRON. 18 INCH EACH $1,350.00 2.00 $2,700.00 10 PIPE APRON FOOTINGS EACH $600.00 2.00 $1.200.00 11 PIPE APRON GUARD EACH $1,650.00 2.00 $3,300.00 12 WATER MAIN,TRENCHED. 16 INCH LF $135.00 5,197.00 $701,595-00 WATER MAIN.TRENCHLESS WITHOUT 13 CASING, 12 INCH LF $320.00 57.00 $18,240.00 WATER MAIN,TRENCHED, 16 INCH-DIP 14 WITH NITRILE GASKETS LF $350.00 48.00 $16,800.00 15 FITTINGS, 16"DIP 22.5 ELBOWS EACH $2,800.00 8.00 $22.400.00 16 FITTINGS 16"DIP 45 ELBOWS EACH $2,800.00 4,00 $11.200.00 17 FITTINGS. 16"X 12"CROSS EACH $4,600.00 1.00 $4,600.00 18 FITTINGS, 16"X 12"TEE EACH $4,000.00 2.00 $8,000.00 19 END CAP, 16 INCH EACH $2,100.00 2.00 $4,200.00 20 END CAP, 12 INCH EACH $2,000.00 2.00 $4,000 00 21 VALVE, BUTTERFLY. 16 INCH EACH $8,600.00 7.00 $60.200 00 22 VALVE, GATE, 12 INCH EACH $4,700 00 3.00 $14,100.00 23 FIRE HYDRANT ASSEMBLY EACH $9,200.00 12.00 $110.400.00 SANITARY SEWER MANHOLE,48",TYPE SW- 24 301 STANDARD DEPTH UP TO 8' EACH $10.500.00 9.00 $94,500 00 25 PAVEMETN REMOVAL PCC SY $30.00 22500 $6,750,00 26 FULL DEPTH STREET, PAVED, PCC SY $198.00 22500 $44,550 OC 27 GRANULAR SURFACING,6-INCH TON $51.00 1.09600 $55,896 00 28 TRAFFIC CONTROL LS $70.000.00 1.00 $70,000.00 CONVENTIONAL SEEDING, FERTILIZING.AND 29 MULCHING,TYPE 2 ACRE $2,600 00 1000 $26.000 00 30 FILTER SOCKS, INSTALLATION LF $2.00 250.00 $500.00 31 FILTER SOCKS, REMOVAL LF $0.25 250.00 $62.50 32 RIPRAP TON $70.00 100.00 $7,000.00 SILT FENCE OR SILT FENCE DITCH CHECK, 33 INSTALLATION LF $2.00 1,660,00 $3,320.00 SILT FENCE OR SILT FENCE [)ITCH CHECK. 34 REMOVAL OF DEVICE LF $1.90 1,660.00 $3,154.00 35 CONSTRUCTION SURVEY LS $10,000.00 1.00 $10,000.00 36 TILE LINE SPOT REPAIR EACH $1,000.00 25.00 $25.000.00 PUMP STATION ELECTRICAL 37 MODIFICATIONS LS $19.136.47 1.00 $19.080.22 38 MOBILIZATION LS $120,000.00 1.00 $120,000 00 39 ELECTRICAL CONDUIT FOR FUTURE PUMP EACH $2,500.00 1 00 $2.500 00 It is mutually agreed that the contract price is increased/decreased by Total: $2,210,266.72 payable/deductible immediately upon completion of the work called for in this order As a result of this change order, the date for completion of the above-mentioned contract is hereby extended to June 15th 2023 June 15th 2023 This change order is incorporated into and govemed by the above mentioned contract. A to r' Recaujrt�e- ova by the City of Am s: Contiarlw2wer ^e;e � Muni d Enpin For the City of Ames blic Nbrk3 Drad Date silk-Menega, M�<,t�: ..a;a Pape 1 of 1