Loading...
HomeMy WebLinkAbout~Master - Approving Change Order No. 5 for 2020/21 CDBG (Infrastructure) Improvements [Baker Subdivision] RESOLUTION NO. 22-413 RESOLUTION APPROVING CHANGE ORDER NO. 5 ON CONTRACT WITH CON-STRUCT, INC., FOR 2020/21 CDBG(INFRASTRUCTURE) IMPROVEMENTS [BAKER SUBDIVISION] FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 5 in the amount of$43,819.23 on contract with Con-Struct, Inc., of Ames, Iowa, for the 2020/21 CDBG (Infrastructure)Improvements [Baker Subdivision] be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 26`h day of July, 2022. Diane R. Voss, City Clerk John A. Haila, Mayor Introduced by: Corrieri Seconded by: Betcher Voting aye: Betcher, Corrieri, Gartin, Junck, Rollins Voting nay: None Absent: Beatty-Hansen Resolution declared adopted and signed by the Mayor this 26'day of July, 2022. CI TY CF ANES PUBLI C VIORKS - ENO NEERI NG p VI SI CN Date 14-Oct-20 A* CITY OF CONTRACT CHANGE ORDER# 5 P.O# 58517 Ames- Balancing ACCT# 087-0690-464.7514 PROJECT: 2020/21 CDBG Improvements (Baker Subdivisionâ–ş CONTRACTOR CHANGE ORDERS APPROVED TO DATE: 1 ($4,750.00) 11 PREVIOUS APPROVED Con-Struct Inc. 2 $44,413.90 12 CHANGE ORDERS ----------------------------(Name)---------------------------- 3 13 $39,663.90 305 S Dayton-Ave- 4 14 ORIGINAL CONTRACT: (Address) 5 15 $1,317,872.65 Ames, IA 50010 _ 6 16 CURRENT ADJUSTMENT ------------------------(City,State,Zip)------------------------ 7 17 $43,819.23 8 18 CUMULATIVE CHANGE ---------------------------------------------------------------- 9 19 ORDER AMOUNT 10 20 $92,983.13 Requires City Council Approval ADJUSTED CONTRACT $1,401,355.78 The contract is hereby modified and amended as follows: ITEM DESCRIPTION UNIT PRICE QUANTITY1 TOTAL 2.04 Sub rade Preparation, 12 In. Depth SY $4.00 (76.00) ($304.00 2.05 Subbase, Granular SY $12.00 (76.00) ($912.00 4.10 Storm Sewer. Trenched, RCP, 18 In. Dia. LF $64.00 1.00 ($64.00 4.11 Storm Sewer. Trenched, RCP, 24 In. Dia. LF $93.50 10.00) ($935.00 4.13 Storm Sewer with Casing Pipe, Trenchless, PVC, LF $609.00 10.00 $6,090.00 7.02 Curb and Gutter, 30 In. Width, 8 In. (Thickness) LF $50.00 15.00 $750.00 7.03 Pavement, HMA, Surface Course, 2 In. (Thickne TON $144.00 8.00 $1,152.00 7.04 Pavement, HMA, Base Course, 5 In. Thickness TON $144.00 20.25 $2,916.00 7.10 Pavement Removal SY $13.75 113.00 $1,553.75 7.11 Sawcut& Remove Ex. Curb and Gutter LF $5.75 13.00 $74.75 7.13 Sidewalk Removal/Replacement SY $150.00 (1.67) ($250.50) 9.01 Convential Seeding, Seeding, Fertilizing, and Mul AC $1,327.00 2.62 $3,476.74 9.02 Convential Seeding, Native Grass and Wildflower AC $2,711.00 0.10 $271.10 9.04 Filter Socks, 12 In. LF $4.60 295.00 $1,357.00 9.05 Filter Socks, Removal LF $1.15 (130.00) ($149.50 9.06 Ri Rap, Class E TON $51.00 (25.53) ($1,302.03 9.08 Silt Fence LF $1.62 509.00 $824.58 9.09 Silt Fence, Removal of Device LF $0.10 (3,317.00) ($331.70 9.10 Stabilized Construction Entrance SY $19.00 (225.00) ($4,275.00 9.11 Erosion Control Mulch, Conventional AC $577.00 3.30 $1,904.10 9.12 Inlet Protection Device, Drop-In, Install Only EA $173.00 (6,00) $1,038.00 9.13 Inlet Protection Device. Maintenance and Remov EA $29.00 6.00 $174.00 11.03 Concrete Washout LS $2,000.00 (1.00) ($2,000.00 2 01a Clearing and Grubbing LS $4,800.00 (1.00) $4,800.00 2.04a Sub grade Preparation, 12 In. Depth SY $4.00 (21.34) $85.36 2.05a Subbase, Granular SY $12.00 21.34 $256.08 4 19a Subdrain. Corrugated PVC, 6 In. Dia. LF $15.00 53.00 $795.00 4.20a ISubdrain. Corrugated PVC, 8 In. Dia. LF $17.00 (63.00) $1,071.00 4.21a Subdrain Cleanout, 4 In. Dia. EA $750.00 (2.00) ($1,500.00 4.22a Subdrain Outlets and Connections, RCP/Intake/ EA $800.00 (1.00) $800.00 4.23a Subdrain Outlets and Connections, RCP/Intake/ EA $935.00 1.00) $935.00 7.01a Pavement, PCC, 6 In. Thickness SY $90.00 144.70 $13,023.00 7.02a Curb and Gutter, 30 In. Width, 8 In. (Thickness) LF $27.70 70.00 $1,939.00 7.03a Pavement, HMA, Surface Course, 2 In. (Thickne TON $111.00 13.81 $1,532.91 7.05a Pavement, HMA, Base Course, 6 In. (Thickness) TON $107.00 6.03 $645.21 7.06a Shared Use Path, PCC, 5 In. Thickness SY $90.00 7.74 $696.60 7 07a Sub grade Preparation, 6 In. (For Alley and Share SY $6.00 117.00 $702.00 7.08a Sidewalk, PCC, 4 In. SY $80.00 346.76 $27,740.80 7.09a Detectable Warning SF $50.00 (20.00) ($1,000.00 CC: Project Engineer, PW Mgmt. Asst., Finance, Contractor 7/15/2022 1 11:20 AM 7.11a Sawcut& Remove Ex. Curb and Gutter LF $5.00 46.00 $230.00 7.12a Sidewalk Removal SY $12.75 19.22 $245.06 9 12a Inlet Protection Device, Drop-In, Install Only EA $173 00 (4.00) ($692.00) 9.13a Inlet Protection Device, Maintenance and Remov EA $29.00 (4.00) ($116.00) 2004. Sub grade Prep, 12"de th s $4.00 358.40 $1,433.60) 2005 Special Backfill, 6"depth s $12.00 881.60 $10,579.20 6 001 Manhole Type SW-401 m 48" ea $3,500.00 1.00 $3,500.00 6.003 Remove Manhole/Intake ea S1,500.00 1.00 $1,500.00 7 001 Pavement, PCC, 6" Depth s $90.00 94.27) ($8,484.30) 7.004 Sidewalk, PCC, 6"depth s $90 00 18.62 $1.675.80 7 006 Driveway, Paved. PCC 6" depth s $90.00 69.27 $6,234.30 9.001 lWattles If $3.50 (50.00) ($175.00 11.003 Monument Preservation or Replacement Is $1,500.00 (1.00) ($1,500.00) 1.3 Erosion Stone LS $4,959.00 1.00 $4,959.00 7 01 a Pavement, PCC, 6 In. (Thickness) SY $90.00 144,70) ($13.023.00) It is mutually agreed that the contract price is increased/decreased by. Total: S43.819.23 C payable/deductible immediately upon completion of the work called for in this order. As a result of this change order, the time for completion of the above-mentioned contract is hereby extended by an additional 0 days. This change order is incorporated into and governed by the above mentioned contract. Accepted for Contractor Recomme ed f roval by the City of Ames SteVe+vjTfcwri4- 07/19/2022 -ti z. zy Contractor/Owner Date Munlc' Dath For the City of Ames tNic Works Director Date GormeeeyerDate Page 1 of 1 CC: Project Engineer. PW Mgmt. Asst.. Finance, Contractor 7/15/2022 1 11:20 AM