HomeMy WebLinkAbout~Master - Change Order No. 4 for Unit 8 Turbine Generator Overhaul Project RESOLUTION NO. 21-584
RESOLUTION APPROVING CHANGE ORDER NO. 4
ON CONTRACT WITH
BLADE RUNNER TURBOMACHINERY SERVICES, LLC
FOR UNIT 8 TURBINE GENERATOR OVERHAUL PROJECT
FOR THE CITY OF AMES,IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper on the
above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Change Order No. 4 in the amount of $123,843.27, on contract with Blade Runner
Turbomachinery Services LLC, of Navasota, Texas, for the Unit 8 Turbine Generator Overhaul
Project be approved and adopted as attached hereto and made a part hereof by this reference.
ADOPTED THIS 23rd day of November, 2021.
Diane R. Voss, City Clerk John A. Haila, Mayor
Introduced by: Beatty-Hansen
Seconded by: Corrieri
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 23' day of November, 2021.
CITY OF CHANGE ORDER NO. 4
CONTRACT I BID NO:Ames PURCHASE ORDER NO: 2 58579 4
November 19, 2021
Project: I Unit 8 Turbine Generator Overhaul Project
Contractor Name: Blade Runner Turbornachinery SV Change Orders Approved to Date:
Address: 3552 County Road 325 1 607,678.37 3 1 181.357.44
City,State,&Zip Code: Navasota, TX 77868 2 26,993.86 4
The contract is modified as follows upon execution of this Change Order. The changes included in this
change order are made in order to carry out the original intent of the contract. The changes included in
this change order are to be accomplished in accordance with the terms, stipulations. and conditions of
the original contract as though included herein.
DESCRIPTION COST
This change order includes three items: additional costs incurred that are outside the
original scope of work due to Unit 8 crane delay, additional work/machining for bucket
installation, and installing a new gear in the turning gear. $123,843.27
City to pay $8,669.03 in applicable sales tax
Contract Price:
Original contract rice: $699.800.00
Change orders approved to date: $816,029.67
Amount of this change order: $123,843.27
Adjusted contract price including this change order: $1,639,672.94
Recom ded by- cce ted for Cit of A es: Accepted by Contractor:
o Id E. Kom John A. Hails // Signature
Director f Electric Services Mayor /(C ,J•✓� 7H S/�/Jw 4'�Ji�'C
City of Ames, Iowa City of Ames, Iowa Printed Name & Title
ZZ Ael 2-1 �31un, z& -Z (-)z�
Date Date Date