Loading...
HomeMy WebLinkAbout~Master - Change Order No. 3 for Campustown Public Improvements (Welch Avenue) RESOLUTION NO. 21-551 RESOLUTION APPROVING CHANGE ORDER NO. 3 ON CONTRACT WITH CON-STRUCT, INC., FOR CAMPUSTOWN PUBLIC IMPROVEMENTS (WELCH AVENUE) FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 3 in the amount of($91,687.18),on contract with Con-Struct,Inc.,of Ames, Iowa, for the Campustown Public Improvements (Welch Avenue) be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 26`h day of October, 2021. Diane R. Voss, City Clerk John A. Haila, Mayor Introduced by: Betcher Seconded by: Beatty-Hansen Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 26'day of October, 2021. A ciTv of CI TY CIFANES PUBLI C VIORKS - ENG NEERI NG 13 VI SI CN Date 8-Oct-21 CONTRACT CHANGE ORDER# 3 P.O.# 58038 Ames Balancing ACCT# 380-8191-439J5 17 PROJECT: Cam ustown Public Improvements Welch Avenue from Lincoln Way to Knapp Street CONTRACTOR CHANGE ORDERS APPROVED TO DATE.- 1 $9,231.00 11 PREVIOUSAPPROVED Con-Struct Inc. 2 $6,094.76 12 CHANGE ORDERS ------------------------------------------------------------- (Name) 3 13 $15.325.76 305 South DaytRj!_Ayft.................................. 4 14 ORIGINAL CONTRACT: (Address) 5 15 $2.150.067.00 Ames, IA 50010 6 16 CURRENT ADJUSTMENT ------------------------------------------------------------- (C�ry.State,ZIP) 7 17 -$91,887.18 8 18 CUMULATIVE CHANGE -------------------------------------------------------------- 9 19 ORDER AMOUNT 10 20 $107,012.94 Requires City Council Approval ADJUSTED CONTRACT $2,073,705.58 The contract is hereby modified and amended as follows: ITEM DESCRIPTION UNIT PRICE QUANTITY TOTAL 2.07 Below Grade Excavation. Core Out Cy $10.00 77.90 $779.00) 2.08 Subgrade Preparation Sy $5.00 413 42) ($2 067 10) 2.09 Sub grade Treatment, Geo rid, Triangular Sy $7.00 66.32 $464.24) 2.11 Modified Subbase, 8" Sy $20.00 25.33 $506.60) 3.02 Re lacement of Unsuitable Material Cy $40.00 53.90 ($2.156 00 3.03 Exploratory Excavation HR $700.00 2.00 ($1.400.00 4.01 Sanitary Sewer Gravity Main, Trenched, SDR 26 LF $260.00 13.00 $3,380 00 4.04 Storm Sewer,Trenched, 15" RCP LF $84.00 64.00 ($5.376 00 4.05 Storm Sewer, Trenched, 30"RCP LF $140.00 6.00 $840 00 4.06 Storm Sewer, Trenched, 36"RCP LF $280.00 6.50 $1.820.00) 4.12 Subdrain,Type 1,6" LF $25.00 2.10 $52.50 4 13 Subdrain, 8", HDPE, Solid Walled LF $90.00 11050 $9,945.00 4.15 Subdrain Outlets and Connections, 6" EA $550.00 4.00 ($2.200.00) 4.16 Subdrain Outlets and Connections, 8" EA $1,050.00 1 00 ($1.050.00) 5.01 Water Main,Trenched, 12"DIP LF $130.00 32.30 $4,199.00 5.02 lWater Main,Trenched, 8" DIP LF $220.00 26.70 $5,874 00 5.03 Pipe Fittin s, DIP LB $8.00 928.00 $7,424.00 5.04 Water Service Pipe,6"DIP LF $240.00 111.50 $26,760.00 5.05 Water Service Pipe, 1.5"Copper LF $48.00 (105.50) ($5,064 00 5.06 Water Service Pipe, 1.25"Copper LF $37.00 11,50 $425.50 5.07 Water Service Pipe, 1.0"Copper LF $12.00 103.40 $1,240.80 5.08 lWater Service Corporation, 1-5"Copper EA $2,300.00 3.00 ($6.900 00) 5.09 Water Service Corporation. 1.25"Copper EA $2,300.00 1.00 $2,300.00 5.10 Water Service Corporation, 1.0"Copper EA $1,500.00 1.00 $1,500.00 6.05 Intake, SW-505 EA $3,200.00 1.00 $3,200.00 6.07 Intake,Trench Drain LF $200.00 1.41 ($282 00 6.08 Connection to Existing Intake EA $3,000,00 2.00 $6,000 00) 7.01 IPavement, PCC, Class C, 9" Sy $82.00 177.61 $14.564.02 7.03 lRemoval of Sidewalk Sy $20.00 211.17 $4,223.40 7.04 Removal of Driveway Sy $20.00 0.40 $8.00 7.05 Sidewalk, PCC,6" Sy $60,00 81.00 $4 860 00 7.06 Detectable Warning SF $60.00 5.00 $300.00 7.07 Driveway, Paved, PCC,7" Sy $60.00 9.14 $548.40 7.08 Full Depth Patches, PCC, 12" Sy $200,00 104.28 $20,856.00 7.09 Pavement Removal SY $20.00 1.31 $20.20 7.10 EPDM Liner SF $2.00 279.75 ($559 50 7.12 Base Aggregate-Soil Cells CF $6.00 60.63 $363.78 7.15 Permeable Pavers Includes Setting Bed&Joint Sy $130.00 105.96 $13,774 80) 8.01 Painted Pavement Markings, Solvent/Waterborn STA $200.00 26.09 $5,218 00 9.01 Trees EA $500.00 2.00 $1,000.00 9.03 Perennials-Plus EA $10.00 75.00 S750.00 9.04 Filter Sock, 9" LF $3.00 90.00 $270.00 9.05 Filter Socks, Removal LF $2.00 90.00 $180.00 9.06 Inlet Protection Device. Drop-In Intake Protection EA $200.00 3.00 (S600.00) 9.07 Inlet Protection Device, Maintenance EA $100.00 (7.00) S700 00) 9.08 Removal and Reinstallation of Existing Fence, St LF $50.00 47.00 S2,350.00 11.04 Precast Handhole EA $1,000.00 4.00 S4,000.00) 11.05 Conduit, Schedule 40 PVC,2" LF $9.00 182.50 $1,642.50 11.07 Conduit, Schedule 40 HDPE, 2" LF $9.00 414.00 $3,726 00) 11.11 lFootings-Monument CY $1.000.00 0.31 $310.00 11.18 Footing-Benches CY $1,000.00 0.14 S140 00 11.19 Footing-Bike Rack CY $1,000.00 0.10 S100 00) 11.20 Footing- Litter Receptacle Slab CY $1.000.00 0.02) l$20 00 Add 6 Pavement Markings(Grooves) STA $225.00 4.58 $1,053.00 Add 7 Pavement Markings Removal-Water Blast Only STA $100.00 3.28 S328 00) It is mutually agreed that the contract price is increased/decreased by: Total: ( 91,687.18 payable/deductible immediately upon completion of the work called for in this order.As a result of this change order, the time for completion of the above-mentioned contract is hereby extended by an additional 0 days. This change order is incorporated into and governed by the above mentioned contract. Accepted for Contractor. - Recommended for al by the City of Ames- /0 �1.2W,21 .c sa,.., 1-a - z 1-V. Con er Dote Mun Engineer Date For the City of A s Public rks Director Date 011, Mwege► 1.a� Date Page 1 or 1 I"` CC: Project Engineer, PW Mgmt.Asst, Finance, Contractor 10/8/2021 111:46 AM