Loading...
HomeMy WebLinkAbout~Master - Approving Change Order No. 8 for Engineering and Related Services to Comply with EPA Coal Combustion Residuals (CCR Standards) RESOLUTION NO. 21-535 RESOLUTION APPROVING CHANGE ORDER NO. 8 ON CONTRACT WITH SCS ENGINEERS FOR ENGINEERING AND RELATED SERVICES TO COMPLY WITH EPA COAL COMBUSTION RESIDUALS (CCR STANDARDS) FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 8 in the amount of$53,585,on contract with SCS Engineers,of Clive,Iowa, for the engineering and related services to comply with the EPA Coal Combustion Residuals(CCR Standards)be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 12`'' day of October, 2021. Diane R. Voss, City Clerk John A. Haila, Mayor Introduced by: Betcher Seconded by: Corrieri Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 12t'day of October, 2021. CHANGE ORDER NO. 8 Ames CONTRACT / BID NO: 2018-055 PURCHASE ORDER NO: 54905 October 12, 2021 I Project: Engineering Services for Compliance with the U.S. EPA's Coal Combustion Residuals (CCR) Standard Contractor Name: SCS Engineers Change Orders Approved to Date: Address: 8450 Hickman Road Suite 20 1 $4,415 00 2 $122.780.00 City,State,&Zip Code: Clive, IA 50325 3 $10.820 00 4 $39.880 00 5 $196.180 00 6 $57,025,00 7 $41.585.00 8 The contract is modified as follows upon execution of this Change Order. The changes included in this change order are made in order to carry out the original intent of the contract. The changes included in this change order are to be accomplished in accordance with the terms. stipulations. and conditions of the original contract as though included herein. DESCRIPTION AMOUNT SCS Engineers, for the period of October 2021 through August 1, 2022, to provide the necessary consulting services to the City of Ames to comply with the U.S EPA's Coal Combustion Residual (CCR) requirements regarding groundwater monitoring. fugitive dust control. and the annual inspection provisions of the regulation as it pertains to the City of Ames Steam Electric Plants ash site and impoundment. The scope of work for this Change Order (No. 8) is as follows. 1) Semi-annual groundwater sampling ($2,600 per event) (LS) $5.200,00 2) Groundwater laboratory testing fees (T&M, NTE) $7,000 00 3) Groundwater re-test sampling (if needed) (LS) $5.400.00 4) Annual Groundwater Monitoring and Corrective Action Report (LS) $12,360.00 5) Annual statistical software licensing fee (LS) $225.00 6) Annual CCR Fugitive Dust Control Report (LS) $3 450.00 7) Inspection of site (LS) $1.650 00 8) Annual Inspection Report by a Qualified Professional Engineer (LS) $3.300.00 9) Allowance for additional consulting services (T&M as needed, NTE) $15.000.00 TOTAL $53.585 00 The above scope of services is described in a proposal from SCS Engineers dated July 30, 2021. Contract Price: Original contract rice: $30,710.00 Change orders approved to date: $472.685.00 Amount of this change order: $53,585.00 Adjusted contract price including this change order: $556,980.00 Recomme ed by: cc pted by ity of A es: Accepted by Contractor: Don Id E. Kom John A. Haila �� Signature Director of Electric Services Mayor Olri5hne L_ EdIIo- ILd,e-f W,,YSe1' City of Ames City of Ames Printed name &titl) z / 10/1 it d 7. )Z4 Date IDa a bate