Loading...
HomeMy WebLinkAbout~Master - Change Order No. 1 for Homewood Golf Course Clubhouse RESOLUTION NO. 21-519 RESOLUTION APPROVING CHANGE ORDER NO. 1 ON CONTRACT WITH R.H. GRABAU CONSTRUCTION,INC., FOR HOMEWOOD GOLF COURSE CLUBHOUSE FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 1 in the amount of$14,309.01, on contract with R.H. Grabau Construction, Inc., of Boone, Iowa, for the Homewood Golf Course Clubhouse be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 28`h day of September, 2021. Diane R. Voss, City Clerk John A. Haila, Mayor Introduced by: Corrieri Seconded by: Gartin Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 28'day of September, 2021. CHANGE ORDER NO. 1 Ames CONTRACT/ BID NO: 2020-087 PURCHASE ORDER NO: 57795 September 9, 2021 Project:1 Homewood Golf Course Clubhouse Project Contractor Name: R. H.Grabau Construction,Inc. Change Orders Approved to Date: Address: PO Box 99 1 13 City,State,&zip Code: Boone,Iowa 50036 2 14 The contract is modified as follows upon execution of this Change Order. The changes included in this change order are made to carry out the original intent of the contract. The changes included in this change order are to be accomplished in accordance with the terms,stipulations,and conditions of the original contract as though included herein. ACTION DESCRIPTION COST Add See attached list of changes. $14,309.01 Contract Price: Original contract price: $1,374,881.00 Change orders approved to date: $0.00 Amount of this change order: $14,309.01 Adjusted contract price including this change order: $1,389,190.01 Accepted for R. H. Grabau Construction, Inc.: City of Ames Approval: (Keith Abraham, Director, Parks& Recreation) Z t- 2/ Q��ti.,.. 9/j Z/z, Signature Date Signature Date Printed Name &Title: le e L"; J 5 � , /'/— /,,(e E da a t Farnsworth GROUP Iformerly DESIGN ALLIANCE CHANGE ORDER-LOG Homewood Golf Course Clubhouse-Ames, Iowa Date: 09/09/21 Original Contract Price: $1,374,881.00 Change Orders approved to date: $0.00 APPROVED CHANGE ORDER ITEMS 1) CR-03 Relocate Electrical Meter& Disconnect Switches $0.00 d 2) CR-05 RFP-01: ETI PR#1 ADD Switches & Dimmers, and CHANGE to multi- $3,221.57 V circuit light fixtures. ETI ESI#1 DEDUCT for smaller wire, conduit& disconnects. 3) CR-06R RFI-17:Vent Line Changes, per City of Ames Requirements. $1,713.60 d 4) CR-08 Water&Sewer Usage Deduct -$122.53 d 5) CR-09R RFI-22: Revisions to layout of Folding Panel Partition & Door(104B) -$848.00 d 6) CRA 1 RFP-02:Add (4) Emergency Egress Lights and (1) Battery $3,843.82 d 7) CRA 5R Restroom[109]: Remove san. vent lines for urinal. Deduct Urnial & $254.12 V Flush Valve and Revise Restroom Sign. 8) CR-16 Delete Video Monitor Mounts from project. -$1,357.05 d 9) CRA7 Add glazing at rafter location above folding panel partition. Framing $1,275.00 d material change& portion of labor. 10) CR-18 RFP-04: Credit to relocate Fire Department Connection (FDC) -$2,500.00 V 11) CR-19 RFP-08: Revise Openness of Window Shades $214,20 d 12) CR-20 RFP-06: Credit to omit 43'of Sidewalk/ADA Ramp/Detectable Warning -$1,670.00 d 13) CR-21 Add Cell Phone Dialer to Fire Alarm System $1,756.44 d 14) CR-22 RFP-05:Add HDMI cables at west wall $658.67 d 15) CR-23 Furnish and Install two new 2x2 LED Lights in Office[112] $412.34 d 16) CR-24 RFP-09:Add FRP in Storage[105) $1,019.08 V 17) CR-25 Relocate Interior Vestibule Door(101B) $2,442.90 d 18) CR-26 RFP-10: Revise light fixture heights. $1,001.39 V 19) CR-27 Add hand hole and trench to maintenance building and install data condu $1,654.70 v 20) CR-28 Add wiring for keypad for door alarm system&cut into wall area $144.59 V 21) CR-29 Add power&wiring for HVAC control panel and circulation pump, add $1,194.17 d bonding for data rack, change light fixture&add light in stairwell, add raceway for data to HVAC control panel. TOTAL OF APPROVED CHANGES $14,309.01 'Percentage 1.04% Adjusted Contract Price including this change order: $1,389,190.01 14225 University Avenue,Suite 110.1 Waukee,IA 50263 1 p 515.225.3469 1 www.f-w.com ENGINEERS IARCflI'CECT5ZSURVEYORSISCIENTN'r5