HomeMy WebLinkAboutA6 S
RECEIVED
APR 2 8 2W
CITY OF AMES,IOWA
21
05 5 SE 5 th Street, Ames, I A DEPT.OF PLANNING&HOUSING
Storm Water Management Plan
4/22/2014
iox ,
e ngineering
I hereby certify that this engineering document
was prepared by me or under my direct personal
rimunnuuuua
supervision and that I am a duly licensed
Professional Engineer under the laws of the
State of Iowa.
€-00, ��4ENS� /may IT W�
4 t z I r
13310 SCOTT A. WILLIAMS DATE
License number 13310
•1pWP My license renewal dote is December 31, 2014.
S�ONAt_ raa
"" urmruuunwne � Pages or sheets covered by this seal: ALL
1 )FOX
engineering
1. SITE CHARACTERISTICS
A. Pre-Development Conditions
The existing site is approximately 4.51 acres and is located in the SE%of the NE%, Section 12,
T83N, R24W of the 5th PM, in Ames, Iowa. The site is currently used as a warehouse, consisting
of paved areas, gravel parking, buildings, and lawn. The hydrologic soil group for the site is 'B'
See Appendix for NRCS Soils Map and a map of existing conditions.
Storm water from the site is conveyed as overland flow. Storm water runoff flows over land to
ditches along the north and west sides of the property, and ditches along SE 5th Street where it
is piped, by 24" culvert, to the southwest corner of the site. All runoff from the site eventually
reaches the southwest corner of the site,where it crosses SE 5th Street in twin 54-inch culverts.
Runoff flows through a detention pond located on Lot 5 of Pete Cooper's Subdivision (Carney's
Auto Salvage), storm sewer pipe, and unnamed ditches before reaching the Skunk River.
B. Contributing Off-Site Drainage
Currently there is no contributing off site flow. Off site flows from the surrounding areas north
and east are directed around the site (west along the north boundary and south along the west
boundary of the site) in open ditches.
C. Post-Development Conditions
The proposed development includes construction of a building addition and associated
pavement. For events up to the 100-year event, storm water storage and discharge will be
based on releasing at runoff rates less than the existing conditions. However, actual post-
development discharges may be limited by tailwater conditions caused by Skunk River flooding.
D. Floodplains, Floodways, and Wetlands
According the Flood Insurance Rate Map (FIRM) and Flood Insurance Study (FIS) by FEMA(dated
2/20/2008),the project site is located within Zone "AE". From the FIS:
Storm Event Water Surface Elevation
10-year 883.8
50-year 885.0
100-year 885.6
(See Appendix for inundation limits from the Iowa Flood Information System).
There is no evidence of wetlands within the project limits.
l ,r
1 FOX
engineering
2. PRE-DEVELOPMENT RUNOFF
A. Watershed Area
Two sub-areas were identified and labeled as E1 and E2. Runoff from E1 reaches the southwest
corner of the property via overland flow and ditches along the north and west sides of the
property. Runoff from E2 reaches the southwest corner of the property via overland flow,
ditches along SE 5th Street, and a 24" CMP culvert. See Appendix for a map of existing
conditions and Hydraflow modeling output.
B. Time of Concentration
A minimum time of concentration of 5 minutes was used.
C. Precipitation Model
The precipitation model used for this project was rainfall Intensity-Duration-Frequency (IDF)
curves, based on historic rainfall data for central Iowa, Region 5.
D. Rainfall Loss Method
Curve Numbers(CN) were utilized to account for infiltration and rainfall loss. Existing land use is
warehouse consisting of buildings (98), pavement (98), gravel parking (85), and poor quality
grass areas (85).
E. Runoff Model
Peak runoff discharges for a range of storm events were calculated using the SCS Method. See
Appendix for Hydraflow modeling output.
F. Summary of Pre-Development Peak Runoff
(Allowable Site Discharge for Post-Development Conditions)
Duration 2-year 5-year 10-year 25-year 50-year 100-year
Intensity, 1 4.20 5.28 6.12 7.44 8.40 9.48
Location Area (AC) CN TC(min) Q2(cfs) Q5 (cfs) Q10(cfs) Q25(cfs) Q50(cfs) Q100(cfs)
Pre- E1 2.52 90 5 7.9 10.6 12.9 16.0 18.6 21.3
Pre - E2 1.98 89 5 6.0 8.1 9.9 12.4 14.4 16.5
Pre -Total 13.9 18.6 22.7 28.4 33.0 37.8
°00.433.34E;'- 1 515.233.0000 1 www.foxeng.com
Fox
englneerinc
3. POST-DEVELOPMENT RUNOFF
A. Watershed Area
The proposed project will provided a 41,400 SF building addition and paved parking lot. Two
sub-areas were identified and labeled as P1 and P2. Runoff from P1 reaches the southwest
corner of the property via overland flow and ditches along the north and west sides of the
property. Runoff from P2 reaches the southwest corner of the property via overland flow,
ditches along SE 5th Street, and a 24" CMP culvert. See Appendix for a map of proposed
conditions and Hydraflow modeling output.
B. Time of Concentration
A minimum time of concentration of 5 minutes was used.
C. Precipitation Model
The precipitation model used for post-development evaluation was rainfall Intensity-Duration-
Frequency (IDF) curves, based on historic rainfall data for central Iowa.
D. Rainfall Loss Method
Curve Numbers (CN) were utilized to account for infiltration and rainfall loss. Proposed land use
is warehouse consisting of buildings (98), pavement (98), and poor quality grass areas (85).
E. Runoff Model
Peak runoff discharges for a range of storm events were calculated using the SCS Method. See
Appendix for Hydraflow modeling output.
F. Summary of Post-Development Peak Runoff
(Without Detention)
Duration 2-year 5-year 10-year 25-year 50-year 100-year
Intensity,) 4.20 5.28 6.12 7.44 8.40 9.48
Location Area (AC) CN Tc(min) Q2 (cfs) QS (cfs) Q10(cfs) Q25(cfs) Q50(cfs) Q100(cfs)
Post- P1 2.16 94 5 7.7 10.0 11.9 14.6 16.8 19.0
Post- P2 2.35 95 5 8.7 11.1 13.2 16.1 18.4 20.8
39.8
Post-Total 16.4 21.1 25.1 30.7 35.2
y ' FOX
engineering
G. Comparison of Peak Runoff Rates
(Post-Development Without Detention)
2-year 5-year 10-year 25-year 50-year 100-year
Q2 (cfs) Q5 (cfs) Q10(cfs) Q25 (cfs) Q50(cfs) Q100 (cfs)
Pre-Development 13.9 18.6 22.7 28.4 33.0 37.8
Post-Development 16.4 21.1 25.1 30.7 35.2 39.8
Increase(+)/Decrease(-) +2.5 +2.5 +3.0 +2.3 +2.2 +2.0
4. STORM WATER CONVEYANCE DESIGN
A. Design Information References
The design for storm water facilities are in accordance with the Iowa Statewide Urban Design
Standards for Public Improvements, 2013 Edition.
B. Storm Sewer and Culverts
A tile will collect storm water from downspouts of the new building addition and carry it to the
detention areas. The 12-inch pipe is designed to accommodate roof run off from a 5-year
storm. For storm events beyond the 5-year storm, excess flows will be conveyed by overland
flow.
When the existing building was built, a 24-inch CMP culvert was placed along the north side of
SE 5th Street to enclose the ditch. This culvert will serve as the outlet for sub-area P2.
A new 24-inch culvert will be installed under the new drive, connecting the west and east
detention areas. The pipe is large enough (little hydraulic loss)that both areas will essentially
act as a single detention area.
C. Storm Drainage Outlets and Downstream Analysis
After project completion, storm water will leave the site at the current location. An orifice plate
will be installed on the existing 24-inch CMP (15-inch diameter orifice or equivalent) to restrict
outflows from the detention area. The combined peak discharge rates of the undetained areas
(overland flow) and the detention area (piped flow)will be less than pre-development rates for
the site, up to the 100-year event.
5. STORM WATER MANAGEMENT DESIGN
A. Design Standards
The design for storm water facilities are in accordance with the Iowa Statewide Urban Design
Standards for Public Improvements, 2013 Edition.
engineering
B. Detention Basin Location
Two new detention areas will be constructed along SE 5th Street, and discharge through the
existing 24" culvert to reach the southwest corner of the property. A 15 orifice plate will be
installed on the existing culvert to control peak discharges. The two detention areas will be
connected by a 24" culvert and will function as one larger detention area. For modeling
purposes they were combined. The area is located within the Skunk River floodplain. See
Appendix for map of proposed conditions.
C. Detention Basin Performance
2-year 5-year 10-year 25-year 50-year 100-year
Peak Release Rate Q2 (cfs) Q5 (cfs) Q10(cfs) Q25(cfs) Q50(cfs) Q100 (cfs)
Pre-Allowed 13.9 18.6 22.7 28.4 33.0 37.8
Post(P1)-No Detention 7.7 10.0 11.9 14.6 16.8 19.0
Post(P2) -Detained 6.2 7.1 7.8 8.4 8•8 9.3
(15" orifice discharge)
Post-Total 13.6 16.4 18.9 22.3 25.0 27.5
Maximum Ponding 883.3 883.6 883.9 884.2 884.4 884.6
Elevation
Notes:
1. "Post-Totals"shown are not the some as results from adding P1 and P2 rows due to effects
of routing.
2. "Maximum Ponding Elevations"shown assume no tailwater at the outlet(no flooding).
6. PERMITS
A. An Iowa DNR NPDES Storm Water Discharge Permit will be required prior to construction.
B. A City of Ames COSESCO Permit will be required prior to construction.
7. REFERENCES
A. Statewide Urban Design and Specifications. (2013,January). Iowa Statewide Urban Design for
Public Improvements 2013 Edition. http://www.iowasudas.org/design
B. Center for Transportation Research and Education. Iowa Storm water Management Manual,
Version 3; October 28, 2009 Edition.
°.nK>,433 3469 :,157.?33.UO(__) I www.foxeng.corri
FOX
engineering
APPENDIX -
SITE LOCATION
800.4.33.3469 I E15.233.0r)00 I www.f oxen g.Con-i
Story County, IA / City of Amesf.N. beacon"-'
Date Created,4/4/2014
2105 SE 5th Street
t- 1" erview
VV NE
,`
��� �► �00
—� '-'Legend
L--.r- _ _ __-- Parcels
� Lots
Townships
T' '"` •' Sections
r �w.at ❑ Quarter Quarters
I I�+ ��} Corporate Limits
Road Centerlines
1
sE g^ T�7' a.
yam.. SE 5TH ST SE STH ST
/J f�...I.�fl r yam►.. .e v.� �:.."
low
Z.
�,, y,.;�^Mn.Fey►�Rw:Q w'+,w wi� �IRgh"�1 a�, a �
s° 200 ft 'Nvx
Last Data Upload:4/4/2014 7:03:52 AM
daralo{ad by
Concerning Assessment Parcels and Platted Lots Within the City of Ames Jurisdiction: The Scb"e4w CCIM01IM"
The solid parcel boundary lines represent the legal description as recorded and are not necessarily the official ScNvicier WWW ycW—y W='P alien
platted lot lines. Dashed lines are official platted lots. If a parcel contains dashed lines,please contact the Ames
Planning&Housing Department(515-239-5400)to determine which lines can be recognized for building permit or
zoning purposes.If you have questions regarding the legal description or parcel measurements,please contact the
engineering -
APPENDIX -
EXISTING AND PROPOSED CONDITIONS
�`�C 1 s-r�►J � C a tJ D t i 1 b►J s
�p1A
BB3-
— — ___—�IrEAtiFC'S'r'
Fl-4—LAME
� 1
A
I
K
5TORN OUILET
FL-552 31
57 '
EXISTING BUILOING
m WAREHOUSE 32199 S.F.
OFFICE: 2900 S.F.
F F.E. - 887.5
2105 S E. 5TH STREET
I , m
I
I �
V C)
- I LEGEND
c
i/ MATED LINE W
ELECTRIC LINE E
Lwst.�co• • SANITARY SEWERGA LIN
9
TELEPHONE LINE T
51�"•-" _ _ TV CABLE C T V—
Y D 7 _. T STORM SEWER —s 57-
35�O 1 I T{ "jI� I X• X' IN CONCRETE
1 I '^ I II�t I _ I 17- FIRE HPORANT
POWER POLE
LIGHT POLE
0 +7x1 GUY ANCHOR
0 +- SPOT ELEVATION
= B• S NETER
F •- WA
7ER VALVE
GA OR CURB 89K
E1'.-Tj11•' L EW POWER POLE/LIGHT POLE
IA- BEEHIVE INTAKE
u 10 9 �� ■- ELECTRIC BOX
UTILITY POLE
o- TELEPHONE PEDESTAL
SANITARY CLEAN-DUT
o- IRRIGATION CONTROL
SN POST
9 IG
— — — — — — — x- GROUND LIGHTING
PK OR MAG NAIL FOUND OR SET AS NOTED
✓ d b 0 e Q 6 00 O D O 00
0 0 •- 24" STORM INTAKE
6B - • A a-ELECTRIC METER
E - `f t-•1 BDLLARO
� f __ f L �� PROPERTY BOUNDARY
y--`��_ E .1 SECTIONCENTERLI ..__
S E LINE
I'I - __ E A RIGHT OF WAY LINE _
�I_`I'r' w ' BUILEMINT DING SE BACK LINE
I I I SECTION CORNER FOUND OR SET AS NOTED
FOUND IRON PIN OR PIPE AB NOTED
SET 1/IR N 30" Oil W/ YELLOW CAP E17161 0
I GRAPHIC SCALE 1 �25
SANITARY
MANHOLE
FR1Ma°°=LI 'eie.53 p 25 50 75
SITE - =-M
CG ` L E L�� SANITARY-/
V Rl A 01E
RIM-8070]
-
FL ICU 077.13
��-v?aS�D CpTJ ��it �..1S
L
rl
a.,FI%ACCESS LANE� MAW mw lampw � sot +r►
Ficn"e82 3?
sr
' sr
EXISTING BUILDING
c �
��REMOUSE� 32199 S.F.
OFFICE' 2900 S.F
1 F.F.E. - 887 5
2105 S.E 5TH STREET
' ao
eJOi• 5
I
DIRECTION OF SURFACE WATER F40N
c ,I
Ir1
LEGEND
WATER LINE --
Ir ELECTRIC LINE E -
_ 1 t slcc•ue _ __ GASILINE
T TARY SEWER G-
' D I' LCABOE LINE
V _CT,-
r ; • Q 11 STORM SEVER —s sr-
rI- fv w of X- X IN CONCRETE
FIRE HYDRANT
Wi POWER POLE
O —W- ! •LIGHT POLE
GUY ANCHOR
+-SPOT ELEVATION
,y' r ry5'tup gl f 9• GAS METER
N' r O •-WATER VALVE OR CURB BOX
LI-POWER POLE/LIGHT POLE
I .- BEEHIVE INTAKE
II I ■-ELECTRIC 90X
'`W,I ` I iA sj Is a�ws I Ifll 1 / x-UTILITY POLE
1—I p�� 0- TELEPHONE
PEDESTAL
11 0- SANITARY
Y CLEAN-OUT
� F— a — —�� 1 °� e- IRRIGATION CONTROL
d0•o- O O l O -O O O O O LI - SIGN POST
�Y_ 7// ■ GROUND LIGM7ING
peg 2`` . F E * �1 _ Ir �•PK OR HAS NAIL FOUND OR SET AS NOTED
f�A- / +T'- ' / �� •• 24' STORM INTAKE
ELECTRIC METER
BOLLARD
PROPERTY BOUNDARY
SECTION LINE -
r STREET CENTERLINE -
I �• -- ` - RIGHT OF W4Y LINE - - - - - - - - -
EASEMENT LINE — —— —— — —
' SECTIONGCOORRNERCFOUND OR SET AS NOTEDFOUND IRON #i
r ' ' I ' -- SET 11/2, x 30N RESARPW/AYELL
TE
9ANILRr OWOCAP 017151 0
��
RI AM-681 00 FL iai 87e e3 GRAPHIC SCALE 1 -25
-- -
88<
—ess— 0 25 50 75
SITS - - 886
-
o�TT_GT -- � —
_887_
SAWITARY_/
MANICLE
RIM-Y7 03
Fox
engineering
APPENDIX -
NRCS SOILS MAP
Z
l Z
_ V
V _
� M
066TS911 OL61990 056TSW OE6TS90 OT6TSW 069TSW OLBT596 058i59b
M.CBS..tE o£6 �
V O
co
� a
1-4
v '
i
y: —8
a
a
v N
a
ca
�
o >
oin � v �
U p
�'L a a
o W �... o
z
S' IQ 3 X
Ln
w QC
I � O
0 c
a n a W `
c
Z Z U
i v
�n M.6 5f oE6
M.6 SE o£6 7
066TS91, O16TS9, 056TS96 OE6TS9b OT6TS9b 06915W OL8T59h 059T596
z
z
Fo
v
e
� M
_ O O
O O N ° O _ N N
C CI O L 3 m O > •— '7 O7
O O L cp
° Nf6 mo a`� rmm I ; co d
L) c� 0) go � m hoc
16 0 coi c`°i m -0 N 3 ° ca o ° rn E
U N N E fn (n N "6 N E 0 N — U N
Z m C U m .m .2 ` Lo a) L V m N L N
E ai Q m ° oo w a> m N U Cl) E n m
�o 0.70 m a) ° M ° aN ' U Q
N E m 0 (n ti ° CO -0 ccn 75
Z a) Z E aNi
Q N O) C Z 'D ._ r N O
C cn E m ° N W N N 7 O Q CO N o a) m
m m a� m E y 'o a as CO o o m n o a) Q Q)
L m N 0 N N Z CD m � "O
0 o m a� E o ° ami 3 `0 � � o@ w ' c� o m CL TQaa)
> > w oL 3 0Z- a> > C - m ° N a m
z y Q o '� N t o a) a > aa) 2 E o o C N t I m E -0
Z n o o c N a� n (n 'o m U .N m m o N m
IL O Y 'B N 7 J 05 v) d E U m > a) N L � N
CQ E a o a m Z a o m a`� ,N U a� o o @
G y °- m °� E m a) 7 a) a Co- m N m m N m O '0)
N m E C L > . o a� o rn m ami m @ E o >^
°
o Lv @ o amma m N — o0
�°
aa) cY c o U =
n Um Ca a m
N ofNCO ' o .° T cu ° o
O N N N O w m O N m y LC T
N 21 $ yCO L)3 ca
a
CL i � a) mE
cc
� W E Q in a E cn U n-o Q cmi H Lm. cn cn In o H o o
>T
N
3 Z
O c
> T'0
> U
o in
U L m
Z n o
o W a
V a O
cn n N c0
n c
U L O
d LL
o a _ -0 O @
(n m o J m m a`) m o t Z
n fl a
R o a
a O N N L n. y C m N M R UO a)
cn (n > U U 3 to G Q C J .0 Q
i0 C
_ N p
_ LL °
W
r^ 3: ~ m
W
J
IL - o vCL
Q m 0 _ _ N
Q O C O .F D O_
a y al m O m Gl O
c c a n 3 O
o o> �n°
co0 n W °C, O - Z.
a a co
75
m m m o a) y � m� rmu
> > a m > -o
O N > N C n a) O m m O
O O O n
` Q y (n M '0 m m U U C7 U' J J 2 n d of (n M N fn N u)
(D
d a o
d3Qgx 2 )
Q (n • N Q C
d
a' m
i Q)
7 N
. C
Z U
�6
Soil Map—Story County,Iowa 2105 SE 5th Street
Map Unit Legend
Story County,Iowa(IA169)
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
136E Ankeny fine sandy loam,2 to 5 0.0 0.2%
percent slopes
485 Spillville loam,0 to 2 percent 3.2 75.0%
slopes
536 Hanlon fine sandy loam,0 to 2 1.1 24.8%
percent slopes
Totals for Area of Interest 4.3 100.0%
u` Natural Resources Web Soil Survey 4/7/2014
Conservation Service National Cooperative Soil Survey Page 3 of 3
engineering
APPENDIX -
IOWA FLOOD INFORMATION SYSTEM (IFIS)
FLOOD INUNDATION MAPS
800.433,3469 1 515.233.0000 1 www.foxeng.corn
� Y a
EE i
u-I o 0 0
cNn � v
I• W
E
gel
Ai
76- f
y r
L,
�Y 1/
fi A,
w
2
v jA
�.r t
Ar
1 •j
0
o
rR� �
a , ,
O
� Y O
U G
o f 4
� G �
'Y tR m
_ "O y — r � N P 0 YV�•
ig
N N
❑ o
"�" R11CR is
� � R
e
x
MW
t rA
V � r
plo
1
n
etl'
u�
{ c
P
1
r..
' v
x
P
v c
gi o m N
o
C •
i
n �
E
V�
w
I4i 4
't_yt,
3-1
{ 1
er
t
t f
1 - •
f '40+PW
^iY
_ y
Imo "nx�
I
Y -
N
C V; O
� EE UU s
1
S
ti
1
do- �
,.w
9 J 4 V
AS
r
r l
y,
WR&O-d
i
G 1
i
v
t � Y
O
s o
N O
t
Z rn c
ilia
� Y 0YY � tNlt lOi •� tp W y� ��
CIE N Y
Li o
Ito 2
w ..
.ft
a
i
i
V 1
` y
1 f'•
Fox
engineering
APPENDIX -
HYDRAFLOW MODELING OUTPUT
1-100.433.3469 1 5115.233.0000 1 www.foxena.com
Hydraflow Table of Contents 2105 SE 5th.gpw
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk,Inc.v10
Tuesday,04/22/2014
2 - Year
Summary Report......................................................................................................................... 1
2
HydrographReports...................................................................................................................
Hydrograph No. 1, SCS Runoff, Existing (E1).......................................................................... 2
Hydrograph No. 2, SCS Runoff, Existing (E2).......................................................................... 34
Hydrograph No. 3, Combine, Existing (Total)...........................................................................
Hydrograph No. 5, SCS Runoff, Proposed (P1)....................................................................... 5 5
Hydrograph No. 6, SCS Runoff, Proposed (P2).......................................................................
Hydrograph No. 7, Reservoir, Propsd (P2) thru deten............................................................. 7
PondReport - Proposed...................................................................................................... 8
Hydrograph No. 8, Combine, Proposed (Total)........................................................................ 9
5 - Year
SummaryReport....................................................................................................................... 10
HydrographReports................................................................................................................. 11
Hydrograph No. 1, SCS Runoff, Existing (E1)........................................................................ 11
12
Hydrograph No. 2, SCS Runoff, Existing (E2)........................................................................ 13
Hydrograph No. 3, Combine, Existing (Total)................................................................••••.•.. 14
Hydrograph No. 5, SCS Runoff, Proposed (P1).................................................................."' 15
Hydrograph No. 6, SCS Runoff, Proposed (P2).....................................................................
Hydrograph No. 7, Reservoir, Propsd (P2) thru deten........................................................... 16
Hydrograph No. 8, Combine, Proposed (Total)...................................................................... 17
10 - Year
SummaryReport....................................................................................................................... 18
HydrographReports................................................................................................................. 19
Hydrograph No. 1, SCS Runoff, Existing (E1). 19
..............................................
Hydrograph No. 2, SCS Runoff, Existing (E2)........................................................................ 20
21
Hydrograph No. 3, Combine, Existing (Total)....................................................................... . 22
Hydrograph No. 5, SCS Runoff, Proposed (P1)............................................................•.•••"" 23
Hydrograph No. 6, SCS Runoff, Proposed (P2).....................................................................
Hydrograph No. 7, Reservoir, Propsd (P2) thru deten........................................................... 24
Hydrograph No. 8, Combine, Proposed (Total)...................................................................... 25
25 - Year
SummaryReport....................................................................................................................... 26
HydrographReports................................................................................................................. 27
Hydrograph No. 1, SCS Runoff, Existing (E1)........................................................................ 27
28
Hydrograph No. 2, SCS Runoff, Existing (E2)........................................................................ 29
Hydrograph No. 3, Combine, Existing (Total)......................................................................"' 30
Hydrograph No. 5, SCS Runoff, Proposed (P1)..................................................................... 31
Hydrograph No. 6, SCS Runoff, Proposed (P2).....................................................................
Hydrograph No. 7, Reservoir, Propsd (P2) thru deten........................................................... 32
Hydrograph No. 8, Combine, Proposed (Total)...................................................................... 33
50 - Year
SummaryReport....................................................................................................................... 34
HydrographReports................................................................................................................. 35
Contents continued...
2105 SE 5th.gpw
Hydrograph No. 1, SCS Runoff, Existing (E1)......................................
35
.
Hydrograph No. 2, SCS Runoff, Existing (E2).................................................................... ... 36
Hydrograph No. 3, Combine, Existing (Total)......................................................................... 37
Hydrograph No. 5, SCS Runoff, Proposed (P1)..................................................................... 38
Hydrograph No. 6, SCS Runoff, Proposed (P2)...................................... ............... ...
. . ........... 39
Hydrograph No. 8, Combine, Proposed (Total)..Hydrograph No. 7, Reservoir, Propsd (P2) thru deten........................................................... 4.................................................................... 41
100 - Year
SummaryReport....................................................................................................................... 42
HydrographReports................................................................................................................. 43
Hydrograph No. 1, SCS Runoff, Existing (El)........................................................................ 43
Hydrograph No. 2, SCS Runoff, Existing (E2)........................................................................ 44
Hydrograph No. 3, Combine, Existing (Total)......................................................................... 45
Hydrograph No. 5, SCS Runoff, Proposed (P1)..................................................................... 46
Hydrograph No. 6, SCS Runoff, Proposed (P2)..................................................................... 47
Hydrograph No. 7, Reservoir, Propsd (P2) thru deten........................................................... 48
Hydrograph No. 8, Combine, Proposed (Total)...................................................................... 49
I
,Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk,Inc.v10
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Runoff 7.905 2 716 16,308 ------ ------ ------ Existing(E1)
2 SCS Runoff 5.977 2 716 12,255 ------ ------ ------ Existing(E2)
3 Combine 13.88 2 716 28,563 1,2 ------ ------ Existing(Total)
5 SCS Runoff 7.746 2 716 16,636 ------ ------ ------ Proposed(P1)
6 SCS Runoff 8.662 2 716 18,886 ------ ------ ------ Proposed(P2)
7 Reservoir 6.226 2 720 18,860 6 883.27 1,606 Propsd(132)thru deten
8 Combine 13.57 2 716 35,496 5,7 ------ ------ Proposed(Total)
2105 SE 5th.gpw Return Period: 2 Year Tuesday, 04/22/2014
Hydrograph Report 2
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 1
Existing (E1)
Hydrograph type = SCS Runoff Peak discharge = 7.905 cfs
Storm frequency = 2 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 16,308 cuft
Drainage area = 2.520 ac Curve number = 90*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 2.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
"Composite(Area/CN)_[(0.570 x 98)+(0.340 x 98)+(0.830 x 85)+(0.780 x 85))/2.520
Q (cfs)
Existing (El)
Hyd. No. 1 -- 2 Year Q (cfs)
8.00
8.00
6.00
6.00
4.00
4.00
2.00
2.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0
0.00
Hyd No. 1 Time (hrs)
3
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 2
Existing (E2)
Hydrograph type = SCS Runoff Peak discharge = 5.977 cfs
Storm frequency = 2 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 12,255 cuft
Drainage area = 1.980 ac Curve number = 89*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 2.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
"Composite(Area/CN)_[(0.280 x 98)+(0.320 x 98)+(1.360 x 85)+(0.020 x 85)]/1.980
Existing (E2)
Qcfs Q (cfs)
( ) Hyd. No. 2 -- 2 Year
6.00 6.00
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
1.00 1.00
0.00 0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0
Time (hrs)
Hyd No. 2
4
Hydrograph Report M
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.00 Tuesday,04/22/2014
Hyd. No. 3
Existing (Total)
Hydrograph type = Combine Peak discharge = 13.88 cfs
Storm frequency = 2 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 28,563 cuft
Inflow hyds. = 1, 2 Contrib. drain. area = 4.500 ac
Q (cfs)
Existing (Total)
cfs
Hyd. No. 3 --2 Year Q ( )
14.00
14.00
12.00 12.00
10.00
10.00
8.00
8.00
6.00
6.00
4.00
4.00
2.00
2.00
0.00 1 1 1 1 1
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0
Hyd No. 3 s-- Hyd No. 1 Hyd No. 2
Time (hrs)
5
Hydrograph Report
Hydraflow Hydrographs Extension for AUtoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 5
Proposed (P1)
Hydrograph type = SCS Runoff Peak discharge = 11.93 hrs
Time ge
Storm frequency = 2 yrs p
Time interval = 2 min Hyd. volume = 16,636 tuft
Drainage area = 2.160 ac Curve number = 94*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 2.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
"Composite(Area/CN)_[(0.850 x 98)+(0.620 x 98)+(0.600 x 85)+(0.090 x 85)J 12.160
Proposed (P1) Q (cfs)
Q (cfs) Hyd. No. 5-- 2 Year
8.00
8.00
6.00 6.00
4.00
4.00
2
2.00 .00
0.00 0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Time (hrs)
Hyd No. 5
Hydrograph Report 6
Hydraflow Hydrographs Extension for AutoCAD®Civil 3DO 2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 6
Proposed (P2)
Hydrograph type = SCS Runoff Peak discharge = 8.662 cfs
Storm frequency = 2 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 18,886 cuft
Drainage area = 2.350 ac Curve number = 95*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 2.91 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Composite(Area/CN)_[(0.960 x 98)+(0.880 x 98)+(0.510 x 85)]/2.350
Q (cfs) Proposed (P2)
Hyd. No. 6 --2 Year Q (cfs)
10.00
10.00
8.00
8.00
6.00
6.00
4.00
4.00
2.00
2.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 0.00
Hyd No. 6 Time (hrs)
7
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk,Inc.v10 Tuesday,04/22/2014
Hyd. No. 7
Propsd (P2) thru deten
Hydrograph type = Reservoir Peak discharge = 6.226 cfs
Storm frequency = 2 yrs Time to peak = 12.00 hrs
Time interval = 2 min Hyd. volume = 18,860 cuft
Inflow hyd. No. = 6 - Proposed (P2) Max. Elevation = 883.27 ft
Reservoir name = Proposed Max. Storage = 1,606 cuft
Storage Indication method used.
Propsd (P2) thru deten
Qcfs Q (cfs)
( ) Hyd. No. 7 -- 2 Year
10.00 10.00
8.00 8.00
6.00 6.00
4.00 4.00
2.00 2.00
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Time (hrs)
Hyd No. 7 Hyd No. 6 Total storage used = 1,606 cuft
Pond Report 8
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Pond No. 1 - Proposed
Pond Data
Contours-User-defined contour areas.Conic method used for volume calculation. Begining Elevation=881.00 ft
Stage/Storage Table
Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft)
0.00 881.00 00 0 0
1.00 882.00 157 52 52
2.00 883.00 1,436 689 742
3.00 884.00 5,496 3,247 3,988
4.00 885.00 8,844 7,103 11,092
5.00 886.00 12,531 10,633 21,725
Culvert/Orifice Structures Weir Structures
[A] [B] [C] [PrfRsr] [A] [B] [C] [D]
Rise(in) Inactive 15.00 Inactive Inactive Crest Len(ft) = 200.00 Inactive Inactive Inactive
Span(in) = 0.00 15.00 0.00 0.00 Crest El.(ft) = 886.10 0.00 0.00 0.00
No.Barrels = 1 1 0 0 Weir Coeff. = 2.60 3.33 3.33 3.33
Invert El.(ft) = 881.53 881.53 0.00 0.00 Weir Type = Broad --- --- ---
Length(ft) = 190.00 0.00 0.00 0.00 Multi-Stage = No No No No
Slope(%) = 0.00 0.00 0.00 n/a
N-Value = .024 .013 .013 n/a
Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour)
Multi-Stage = n/a No No No TW Elev.(ft) = 0.00
Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s).
Stage(ft) Stage/Discharge
Elev(ft)
5.00
886.00
4.00 885.00
3.00 884.00
2.00 883.00
1.00
882.00
0.00
881.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00
Total Q Discharge(cfs)
9
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Tuesday,04/22/2014
Hyd. No. 8
Proposed (Total)
Hydrograph type = Combine Peak discharge = 13.57 cfs
Storm frequency = 2 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 35,496 cuft
Inflow hyds. = 5, 7 Contrib. drain. area = 2.160 ac
Proposed (Total) Q (cfs)
Q (cfs) Hyd. No. 8 -- 2 Year
14.00
14.00
12.00
12.00
10.00
10.00
8.00
8.00
6.00
6.00
4.00
4.00
2.00
2.00
0.00
0.00
0 2 4 6 8 10 12 14 16 18 20 22 24
Time (hrs)
Hyd No. 8 - Hyd No. 5 Hyd No. 7
Hydrograph Summary Report 110
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum strge
otal
No. type flow interval Peak volume hyd(s) elevation used Hydrograph
(origin) (cfs) (min) (min) (cuft) Description
(ft) (tuft)
1 SCS Runoff 10.56 2 716 22,119
------ ------ ------ Existing(E1)
2 SCS Runoff 8.061 2 716 16,757 ------ Existing(E2)
3 Combine 18.62 2 716 38,876 1,2 ------ Existing(Total)
5 SCS Runoff 9.996 2 716 21,848 ------ Proposed(P1)
6 SCS Runoff 11.09 2 716 24,605 ------ ------ Proposed(P2)
7 Reservoir 7.061 2 720 24,578 6 883.61 2,637 Propsd(P2)thru deten
8 Combine 16.43 2 718 46,426 5,7 ------ Proposed(Total)
2105 SE 5th.gpw Return Period: 5 Year Tuesday, 04/22/2014
11
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2013 by Autodesk, Inc.v10 Tuesday,04 122/2014
Hyd. No. 1
Existing (E1)
Hydrograph type = SCS Runoff Peak discharge = 10.56 cfs
Storm frequency = 5 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 22,119 cuft
Drainage area = 2.520 ac Curve number = 90*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 3.64 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
*Composite(Area/CN)_[(0.570 x 98)+(0.340 x 98)+(0.830 x 85)+(0.780 x 85)]/2.520
Existing (E1)
Q (Cfs) Hyd. No. 1 -- 5 Year Q (cfs)
12.00 12.00
10.00 10.00
8.00 8.00
6.00 6.00
4.00 4.00
2.00 2.00
0.00 0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0
Time (hrs)
Hyd No. 1
Hydrograph Report 12
Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 2
Existing (E2)
Hydrograph type = SCS Runoff Peak discharge = 8.061 cfs
Storm frequency = 5 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 16,757 cuft
Drainage area = 1.980 ac Curve number = 89*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 3.64 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
*Composite(Area/CN)_[(0.280 x 98)+(0.320 x 98)+(1.360 x 85)+(0.020 x 85)]/1.980
Q (cfs)
Existing (E2)
cfs
Hyd. No. 2 --5 Year Q ( )
10.00
10.00
8.00
8.00
6.00
6.00
4.00
4.00
2.00
2.00
0.00 0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0
Hyd No. 2 Time (hrs)
13
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Tuesday,04/22/2014
Hyd. No. 3
Existing (Total)
Hydrograph type = Combine Peak discharge = 18.62 cfs
Storm frequency = 5 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 38,876 cuft
Inflow hyds. = 1, 2 Contrib. drain. area = 4.500 ac
Existing (Total) Q (Cfs)
Q (cfs) Hyd. No. 3-- 5 Year
21.00
21.00
18.00
18.00
15.00
15.00
12.00
12.00
9.00
9.00
6.00
6.00
3.00
3.00
0.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0
Time (hrs)
Hyd No. 3 Hyd No. 1 Hyd No. 2
Hydrograph Report 114
Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 5
Proposed (P1)
Hydrograph type = SCS Runoff Peak discharge = 9.996 cfs
Storm frequency = 5 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 21,848 cuft
Drainage area = 2.160 ac Curve number = 94*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 3.64 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Composite(Area/CN)_[(0.850 x 98)+(0.620 x 98)+(0.600 x 85)+(0.090 x 85)]/2.160
Q (cfs) Proposed (P1)
Hyd. No. 5 -- 5 Year Q (cfs)
10.00 10.00
8.00
8.00
6.00
6.00
4.00
4.00
2.00
2.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 0.00
Hyd No. 5 Time (hrs)
15
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 6
Proposed (P2)
Hydrograph type = SCS Runoff Peak discharge = 11.09 cfs
Storm frequency = 5 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 24,605 cuft
Drainage area = 2.350 ac Curve number = 95*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 3.64 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
*Composite(Area/CN)_[(0.960 x 98)+(0.880 x 98)+(0.510 x 85)]/2.350
Proposed (P2)
Q (cfs) Hyd. No. 6 -- 5 Year Q (cfs)
12.00 12.00
10.00 10.00
8.00 8.00
6.00 6.00
4.00 4.00
2.00 2.00
0.00 0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Time (hrs)
Hyd No. 6
Hydrograph Report 116
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 7
Propsd (P2) thru deten
Hydrograph type = Reservoir Peak discharge = 7.061 cfs
Storm frequency = 5 yrs Time to peak = 12.00 hrs
Time interval = 2 min Hyd. volume = 24,578 cuft
Inflow hyd. No. = 6 - Proposed (P2) Max. Elevation = 883.61 ft
Reservoir name = Proposed Max. Storage = 2,637 cuft
Storage Indication method used.
Q (cfs) Propsd (P2) thru deten
Hyd. No. 7 -- 5 Year Q (cfs)
12.00
12.00
10.00
10.00
8.00
8.00
6.00
6.00
4.00
4.00
2.00
2.00
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Time (hrs)
Hyd No. 7 -�----- Hyd No. 6 Total storage used = 2,637 cult
17
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2013 by Autodesk, Inc.00 Tuesday,04/22/2014
Hyd. No. 8
Proposed (Total)
Hydrograph type = Combine Peak discharge = 16.43 cfs
Storm frequency = 5 yrs Time to peak = 11.97 hrs
Time interval = 2 min Hyd. volume = 46,426 cuft
Inflow hyds. = 5, 7 Contrib. drain. area = 2.160 ac
Proposed (Total)
Q (cfs) Q (cfs)
Hyd. No. 8 -- 5 Year
18.00 18.00
15.00 15.00
12.00 12.00
9.00 9.00
6.00 6.00
3.00 3.00
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Time (hrs)
Hyd No. 8 Hyd No. 5 Hyd No. 7
Hydrograph Summary Report 18
Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2013 by Autodesk, Inc.v10
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Runoff 12.85 2 716 27,237 ------ ------ ------ Existing(E1)
2 SCS Runoff 9.862 2 716 20,736 ------ ------ ------ Existing(E2)
3 Combine 22.71 2 716 47,972 1,2 ------ ------ Existing(Total)
5 SCS Runoff 11.92 2 716 26,384 ------ ------ ------ Proposed(P1)
6 SCS Runoff 13.17 2 716 29,570 ------ ------ ------ Proposed(P2)
7 Reservoir 7,788 2 722 29,544 6 883.92 3,641 Propsd(P2)thru deten
8 Combine 18.91 2 718 55,927 5,7 ------ ------ Proposed(Total)
2105 SE 5th.gpw Return Period: 10 Year Tuesday, 04 /22/2014
19
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk,Inc.v10 Tuesday,04/22/2014
Hyd. No. 1
Existing (E1)
Hydrograph type = SCS Runoff Peak discharge = 12.85 cfs
Storm frequency = 10 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 27,237 cuft
Drainage area = 2.520 ac Curve number = 90*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.27 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
"Composite(Area/CN)_[(0.570 x 98)+(0.340 x 98)+(0.830 x 85)+(0.780 x 85)]/2.520
Existing (E1)
cfs Q (cfs)
Q
( ) Hyd. No. 1 -- 10 Year
14.00 14.00
12.00 12.00
10.00 10.00
8.00 8.00
6.00 6.00
4.00
4.00
2.00
2.00
0.00 0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Time (hrs)
Hyd No. 1
Hydrograph Report 120
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 2
Existing (E2)
Hydrograph type = SCS Runoff Peak discharge = 9.862 cfs
Storm frequency = 10 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 20,736 cuft
Drainage area = 1.980 ac Curve number = 89*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.27 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Composite(Area/CN)_[(0.280 x 98)+(0.320 x 98)+(1.360 x 85)+(0.020 x 85)]/1.980
Q (cfs)
Existing (E2)
Hyd. No. 2 -- 10 Year Q (cfs)
10.00 10.00
8.00
8.00
6.00
6.00
4.00
4.00
2.00 2.00
0.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0
Hyd No. 2 Time (hrs)
21
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 3
Existing (Total)
Hydrograph type = Combine Peak discharge = 2 2.7 1 cfs
Storm frequency = 10 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 47,972 cuft
Inflow hyds. = 1, 2 Contrib. drain. area = 4.500 ac
Existing (Total)
cfs Q (cfs)
Q
( ) Hyd. No. 3 -- 10 Year
24.00 24.00
20.00 20.00
16.00 16.00
12.00 12.00
8.00 8.00
4.00 4.00
0.00 -
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Time (hrs)
Hyd No. 3 ---- Hyd No. 1 Hyd No. 2
Hydrograph Report .22
Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 5
Proposed (P1)
Hydrograph type = SCS Runoff Peak discharge = 11.92 cfs
Storm frequency = 10 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 26,384 cuft
Drainage area = 2.160 ac Curve number = 94*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.27 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Composite(Area/CN)_[(0.850 x 98)+(0.620 x 98)+(0.600 x 85)+(0.090 x 85)]/2.160
Q (cfs)
Proposed (P1)
cfs
Hyd. No. 5-- 10 Year Q ( )
12.00 --------V 12.00
10.00
10.00
8.00
8.00
6.00
6.00
4.00
4.00
2.00
2.00
0.00
0.0 0.00
2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Hyd No. 5 Time (hrs)
23
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 6
Proposed (P2)
Hydrograph type = SCS Runoff Peak discharge = 13.17 cfs
Storm frequency = 10 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 29,570 cuft
Drainage area = 2.350 ac Curve number = 95*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.27 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
*Composite(Area/CN)_[(0.960 x 98)+(0.880 x 98)+(0.510 x 85)]/2.350
Proposed (P2)
Q (cfs) Q (cfs)
Hyd. No. 6 -- 10 Year
14.00 14.00
12.00 12.00
10.00 10.00
8.00 8.00
6.00 6.00
4.00 4.00
2.00 2.00
0.00 0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Time (hrs)
Hyd No. 6
Hydrograph Report 24
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 7
Propsd (P2) thru deten
Hydrograph type = Reservoir Peak discharge = 7.788 cfs
Storm frequency = 10 yrs Time to peak = 12.03 hrs
Time interval = 2 min Hyd. volume = 29,544 cuft
Inflow hyd. No. = 6 - Proposed (P2) Max. Elevation = 883.92 ft
Reservoir name = Proposed Max. Storage = 3,641 cuft
Storage Indication method used.
Propsd (P2) thru deten
Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs)
14.00 14.00
12.00 12.00
10.00 10.00
8.00 8.00
6.00 6.00
4.00 4.00
2.00 2.00
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Time (hrs)
Hyd No. 7 - Hyd No. 6 Total storage used = 3,641 cult
25
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D®2013 by Autodesk,Inc.v10
Tuesday,04/22/2014
Hyd. No. 8
Proposed (Total)
Hydrograph type = Combine Peak discharge = 18.91 cfs
Storm frequency = 10 yrs Time to peak = 11.97 hrs
Time interval = 2 min Hyd. volume = 55,927 cuft
Inflow hyds. = 5, 7 Contrib. drain. area = 2.160 ac
Proposed (Total) Q (cfs)
Q (cfs) Hyd. No. 8 -- 10 Year
21.00
21.00
18.00
18.00
15.00
15.00
12.00
12.00
9.00
9.00
6.00
6.00
3.00
3.00
0.00
0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 2
Time (hrs)
Hyd No. 8 Hyd No. 5 Hyd No. 7
,26
Hydrograph Summary Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3DO 2013 by Autodesk, Inc.v10
Hyd. Hydrograph Peak Time Time to =Hyd. InflowMaximum TotalHydrograph
No. type flow interval Peak elevation strge used Description
(origin) (cfs) (min) (min)
(ft) (tuft)
1 SCS Runoff 16.04 2 716 34,484
-""""" '-"" ------ Existing(E1)
2 SCS Runoff 12.37 2 716 26,385
"""""" """ Existing(E2)
3 Combine 28.41 2 716 60,869 1,2
""'- ------ Existing(Total)
5 SCS Runoff 14.60 2 716 32,755 ------ Proposed(P1)
6 SCS Runoff 16.07 2 716 36,533 ------ Proposed(P2)
7 Reservoir 8.411 2 722 36,507 6 884.19 5,283 Propsd(P2)thru deten
8 Combine 22.32 2 716 69,262 5,7
"---- ------ Proposed(Total)
2105 SE 5th.gpw Return Period: 25 Year Tuesday, 04/22/2014
27
Hydrograph Report
Hydraflow Hydrographs Extension for AUtoCAD@ Civil 3D®2013 by Autodesk, Inc.v10
Tuesday,04/22/2014
Hyd. No. 1
Existing (E1)
Hydrograph type = SCS Runoff Peak discharge = 16.04 cfs
Storm frequency = 25 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 34,484 cuft
Drainage area = 2.520 ac Curve number = 90*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 5.15 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
*Composite(Area/CN)_[(0.570 x 98)+(0.340 x 98)+(0.830 x 85)+(0.780 x 85)]/2.520
Existing (E1) Q (cfs)
Q (cfs) Hyd. No. 1 -- 25 Year
18.00
18.00
15.00
15.00
12.00
12.00
9.00
9.00
6.00
6.00
3.00
3.00
0.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Time (hrs)
Hyd No. 1
Hydrograph Report 28
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Tuesday,04/22/2014
Hyd. No. 2
Existing (E2)
Hydrograph type = SCS Runoff Peak discharge = 12.37 cfs
Storm frequency = 25 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 26,385 cuft
Drainage area = 1.980 ac Curve number = 89*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 5.15 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Composite(Area/CN)_[(0.280 x 98)+(0.320 x 98)+(1.360 x 85)+(0.020 x 85)]/1.980
Q (cfs) Existing (E2)
Hyd. No. 2 --25 Year Q (cfs)
14.00
14.00
12.00
12.00
10.00
10.00
8.00
8.00
6.00
6.00
4.00
4.00
2.00
2.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 0.00
Hyd No. 2 Time (hrs)
29
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCADO Civil 3D9 2013 by Autodesk,Inc.00
Tuesday,04/22/2014
Hyd. No. 3
Existing (Total)
Hydrograph type = Combine Peak discharge = 28.41 cfs
Storm frequency = 25 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 60,869 cuft
Inflow hyds. = 1, 2 Contrib. drain. area = 4.500 ac
Existing (Total) Q (cfs)
Q (cfs) Hyd. No. 3 -- 25 Year
30.00
30.00
25.00
25.00
20.00
20.00
15.00
15.00
10.00
10.00
5.00
5.00
0.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 2
0.0
Time (hrs)
Hyd No. 3 - Hyd No. 1 Hyd No. 2
Hydrograph Report .30
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Tuesday,04/22/2014
Hyd. No. 5
Proposed (P1)
Hydrograph type = SCS Runoff Peak discharge = 14.60 cfs
Storm frequency = 25 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 32,755 cuft
Drainage area = 2.160 ac Curve number = 94*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 5.15 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Composite(Area/CN)_[(0.850 x 98)+(0.620 x 98)+(0.600 x 85)+(0.090 x 85)]/2.160
Q (cfs) Proposed (P1)
Hyd. No. 5 --25 Year Q (cfs)
15.00
15.00
12.00
12.00
SIM
9.00
6.00
6.00
3.00
3.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 0.00
Hyd No. 5 Time (hrs)
31
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3DO 2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 6
Proposed (P2)
Hydrograph type = SCS Runoff Peak discharge = 16.07 cfs
Storm frequency = 25 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 36,533 cuft
Drainage area = 2.350 ac Curve number = 95*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 5.15 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
*Composite(Area/CN)_1(0.960 x 98)+(0.880 x 98)+(0.510 x 85)]/2.350
Proposed (P2)
cfs Q (cfs)
Q
( ) Hyd. No. 6 --25 Year
18.00 18.00
15.00 15.00
12.00 12.00
9.00 9.00
6.00 6.00
3.00 3.00
0.00 0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Time (hrs)
Hyd No. 6
Hydrograph Report .32Y
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 7
Propsd (P2) thru deten
Hydrograph type = Reservoir Peak discharge = 8.411 cfs
Storm frequency = 25 yrs Time to peak = 12.03 hrs
Time interval = 2 min Hyd. volume = 36,507 cuft
Inflow hyd. No. = 6 - Proposed (P2) Max. Elevation = 884.19 ft
Reservoir name = Proposed Max. Storage = 5,283 cuft
Storage Indication method used.
Q (cfs)
Propsd (P2) thru deten
cfs
Hyd. No. 7-- 25 Year Q ( )
18.00 18.00
15.00
15.00
12.00 12.00
9.00
9.00
6.00
6.00
3.00
3.00
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Hyd No. 7 Hyd No. 6 Total storage used = 5,283 cuft Time (hrs)
33
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Tuesday,04/22/2014
Hyd. No. 8
Proposed (Total)
= Combine Peak discharge = 22.32 cfs
Hydrograph type
Storm frequency = 25 yrs Time to peak = 11.93 hrs
Hyd. volume = 69,262 cuft
Time interval = 2 min
Contrib. drain. area = 2.160 ac
Inflow hyds. = 5, 7
Proposed (Total) Q (cfs)
Q (cfs) Hyd. No. 8 -- 25 Year
24.00
24.00
20.00
20.00
16.00
16.00
12.00
12.00
8.00
8.00
4.00
4.00
0.00
0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 2
Time (hrs)
Hyd No. 8 _ Hyd No. 5 Hyd No. 7
.34
Hydrograph Summary Report r
Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D®2013 by Autodesk, Inc.v10
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total
No. type flow interval Peak volume hyd(s) elevation str a used Hydrograph
9 Description
(origin) (cfs) (min) (min) (tuft)
(ft) (tuft)
1 SCS Runoff 18.63 2 716 40,472
"-"""' -"--' ------ Existing(E1)
2 SCS Runoff 14.42 2 716 31,060
"-'""" ------ ------ Existing(E2)
3 Combine 33.04 2 716 71,533 1,2
------ ------ Existing(Total)
5 SCS Runoff 16.78 2 716 37,988 ------ Proposed(P1)
6 SCS Runoff 18.42 2 716 42,246
""""-" ------ ------ Proposed(102)
7 Reservoir 8.831 2 722 42,219 6 884.39 6,755 Propsd(P2)thru deten
8 Combine 24.95 2 716 80,207 5,7
------ ------ Proposed(Total)
2105 SE 5th.gpw Return Period: 50 Year Tuesday, 04/22/2014
35
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2013 by Autodesk, Inc.v10
Tuesday,04/22/2014
Hyd. No. 1
Existing (E1)
Hydrograph type = SCS Runoff Peak discharge = 18.63 cfs
Storm frequency = 50 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 40,472 cuft
Drainage area = 2.520 ac Curve number = 90*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 5.87 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
*Composite(Area/CN)_[(0.570 x 98)+(0.340 x 98)+(0.830 x 85)+(0.780 x 85)]/2.520
Existing (E1) Q (cfs)
Q (cfs) Hyd. No. 1 -- 50 Year
21.00
21.00
18.00
18.00
15.00
15.00
12.00
12.00
9.00
9.00
6.00
6.00
3.00
3.00
0.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Time (hrs)
Hyd No. 1
Hydrograph Report .3s
Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2013 by Autodesk, Inc.v10
Tuesday,04/22/2014
Hyd. No. 2
Existing (E2)
Hydrograph type = SCS Runoff Peak discharge = 14.42 cfs
Storm frequency = 50 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 31,060 cuft
Drainage area = 1.980 ac Curve number = 89*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 5.87 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Composite(Area/CN)_[(0.280 x 98)+(0.320 x 98)+(1.360 x 85)+(0.020 x 85)]/1.980
Q (cfs) Existing (E2)
Hyd. No. 2-- 50 Year Q (cfs)
15.00
15.00
12.00
12.00
9.00
9.00
6.00
6.00
3.00
3.00
0.00 -
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 0.00
Hyd No. 2 Time (hrs)
37
. Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.00 Tuesday,04/22/2014
Hyd. No. 3
Existing (Total)
Hydrograph type = Combine Peak discharge = 33.04 cfs
Storm frequency = 50 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 71,533 cuft
Inflow hyds. = 1, 2 Contrib. drain. area = 4.500 ac
Existing (Total)
cfs Q (cfs)
Q
( ) Hyd. No. 3 -- 50 Year
35.00 35.00
30.00 30.00
25.00 25.00
20.00 20.00
15.00 15.00
10.00 10.00
5.00 5.00
MMW
0.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Time (hrs)
Hyd No. 3 Hyd No. 1 Hyd No. 2
Hydrograph Report •38.
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 5
Proposed (P1)
Hydrograph type = SCS Runoff Peak discharge = 16.78 cfs
Storm frequency = 50 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 37,988 cuft
Drainage area = 2.160 ac Curve number = 94*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 5.87 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Composite(Area/CN)_[(0.850 x 98)+(0.620 x 98)+(0.600 x 85)+(0.090 x 85)]/2.160
Q (cfs)
Proposed (P1)
cfs
Hyd. No. 5 -- 50 Year Q ( )
18.00 18.00
15.00 15.00
12.00 12.00
9.00
9.00
6.00
6.00
3.00
3.00
0.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Hyd No. 5 Time (hrs)
39
yydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.00
Tuesday,04/22/2014
Hyd. No. 6
Proposed (P2)
Hydrograph type = SCS Runoff Peak discharge = 18.42 cfs
Storm frequency = 50 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 42,246 cuft
Drainage area = 2.350 ac Curve number = 95*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 5.87 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
*Composite(Area/CN)_[(0.960 x 98)+(0.880 x 98)+(0.510 x 85)]/2.350
Proposed (P2) Q (cfs)
Q (cfs) Hyd. No. 6 -- 50 Year
21.00
21.00
18.00
18.00
15.00
15.00
12.00
12.00
9.00
9.00
6.00
6.00
3.00
3.00
0.00
0.00 -
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Time (hrs)
Hyd No. 6
Hydrograph Report 40
d .
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 7
Propsd (P2) thru deten
Hydrograph type = Reservoir Peak discharge = 8.831 cfs
Storm frequency = 50 yrs Time to peak = 12.03 hrs
Time interval = 2 min Hyd. volume = 42,219 cuft
Inflow hyd. No. = 6 - Proposed (P2) Max. Elevation = 884.39 ft
Reservoir name = Proposed Max. Storage = 6,755 cuft
Storage Indication method used
Q (cfs)
Propsd (P2) thru deten
Hyd. No. 7-- 50 Year Q (cfs)
21.00
21.00
18.00
18.00
15.00
15.00
12.00
12.00
9.00
9.00
6.00
6.00
3.00
3.00
0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26 0.00
Hyd No. 7 --- Hyd No. 6 Total storage used = 6,755 cuft Time (hrs)
41
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 8
Proposed (Total)
Hydrograph type = Combine Peak discharge = 24.95 cfs
Storm frequency = 50 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 80,207 cuft
Inflow hyds. = 5, 7 Contrib. drain. area = 2.160 ac
Proposed (Total) Q (cfs)
Q (cfs) Hyd. No. 8 -- 50 Year
2
28.00 8.00
2
24.00 4.00
2
20.00 0.00
16.00
16.00
12.00
12.00
8.00
8.00
4
4.00 .00
0.00
0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Time (hrs)
Hyd No. 8 Hyd No. 5 Hyd No. 7
142
Hydrograph Summary Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (tuft)
(ft) (tuft)
1 SCS Runoff 21.28 2 716 46,664 ------ ------ ------ Existing(E1)
2 SCS Runoff 16.51 2 716 35,900 ------ ------ ------ Existing(E2)
3 Combine 37.79 2 716 82,564 1,2 ------ ------ Existing(Total)
5 SCS Runoff 19.01 2 716 43,379 ------ ------ ------ Proposed(P1)
6 SCS Runoff 20.84 2 716 48,127 ------ ------ ------ Proposed(P2)
7 Reservoir 9.259 2 722 48,100 6 884.61 8,330 Propsd(P2)thru deten
8 Combine 27.47 2 716 91,479 5,7 ------ ------ Proposed(Total)
2105 SE 5th.gpw Return Period: 100 Year Tuesday, 04 /22/2014
43
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Tuesday,04/22/2014
Hyd. No. 1
Existing (E1)
Hydrograph type = SCS Runoff Peak discharge = 21.28 cfs
Storm frequency = 100 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 46,664 cuft
Drainage area = 2.520 ac Curve number = 90*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 6.61 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
*Composite(Area/CN)_[(0.570 x 98)+(0.340 x 98)+(0.830 x 85)+(0.780 x 85)]/2.520
Existing (E1) Q (cfs)
Q (cfs) Hyd. No. 1 -- 100 Year
24.00
24.00
20.00
20.00
16.00
16.00
12.00
12.00
8.00
8.00
4.00
4.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 0.00 Time (hrs)
Hyd No. 1
Hydrograph Report 44
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Tuesday,04/22/2014
Hyd. No. 2
Existing (E2)
Hydrograph type = SCS Runoff Peak discharge = 16.51 cfs
Storm frequency = 100 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 35,900 cuft
Drainage area = 1.980 ac Curve number = 89*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 6.61 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Composite(Area/CN)_[(0.280 x 98)+(0.320 x 98)+(1.360 x 85)+(0.020 x 85)]/1.980
Q (cfs) Existing (E2)
Hyd. No. 2 -- 100 Year Q (cfs)
18.00
18.00
15.00
15.00
12.00
12.00
9.00
9.00
6.00
6.00
3.00
3.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 0.00
Hyd No. 2 Time (hrs)
45
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10
Tuesday,04/22/2014
Hyd. No. 3
Existing (Total)
Hydrograph type = Combine Peak discharge = 37.79 cfs
Storm frequency = 100 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 82,564 cuft
Inflow hyds. = 1, 2 Contrib. drain. area = 4.500 ac
Existing (Total) Q (cfs)
Q (cfs) Hyd. No. 3 -- 100 Year
40.00
40.00
30.00
30.00
20.00
20.00
10.00
10.00
0.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Time (hrs)
Hyd No. 3 Hyd No. 1 Hyd No. 2
Hydrograph Report ,as
Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2013 by Autodesk, Inc.v10
Tuesday,04/22/2014
Hyd. No. 5
Proposed (P1)
Hydrograph type = SCS Runoff Peak discharge = 19.01 cfs
Storm frequency = 100 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 43,379 cuft
Drainage area = 2.160 ac Curve number = 94*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 6.61 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Composite(Area/CN)_[(0.850 x 98)+(0.620 x 98)+(0.600 x 85)+(0.090 x 85))/2.160
Q (cfs) Proposed (P1)
Hyd. No. 5-- 100 Year Q (cfs)
21.00
21.00
18.00
18.00
15.00
15.00
12.00
12.00
9.00
9.00
6.00
6.00
3.00
3.00
0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 0.00
Hyd No. 5 Time (hrs)
47
Mydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 6
Proposed (P2)
Hydrograph type = SCS Runoff Peak discharge = 20.84 cfs
Storm frequency = 100 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 48,127 cuft
Drainage area = 2.350 ac Curve number = 95*
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 6.61 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Composite(Area/CN)_[(0.960 x 98)+(0.880 x 98)+(0.510 x 85)]/2.350
Proposed (P2)
Qcfs Q (cfs)
( ) Hyd. No. 6 -- 100 Year
21.00 21.00
18.00 18.00
15.00 15.00
12.00 12.00
9.00 9.00
6.00 6.00
3.00 3.00
0.00 0.00
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
Time (hrs)
Hyd No. 6
48
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 7
Propsd (P2) thru deten
Hydrograph type = Reservoir Peak discharge = 9.259 cfs
Storm frequency = 100 yrs Time to peak = 12.03 hrs
Time interval = 2 min Hyd. volume = 48,100 cuft
Inflow hyd. No. = 6 - Proposed (P2) Max. Elevation = 884.61 ft
Reservoir name = Proposed Max. Storage = 8,330 cuft
Storage Indication method used.
Q (cfs)
Propsd (P2) thru deten
cfs
Hyd. No. 7-- 100 Year Q ( )
21.00 21.00
18.00
18.00
15.00
15.00
12.00
12.00
9.00
9.00
6.00
6.00
3.00
3.00
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Hyd No. 7 --- Hyd No. 6 Total storage used = 8,330 cuft Time (hrs)
49
r Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2013 by Autodesk, Inc.v10 Tuesday,04/22/2014
Hyd. No. 8
Proposed (Total)
Hydrograph type = Combine Peak discharge = 27.47 cfs
Storm frequency = 100 yrs Time to peak = 11.93 hrs
Time interval = 2 min Hyd. volume = 91,479 cuft
Inflow hyds. = 5, 7 Contrib. drain. area = 2.160 ac
Proposed (Total)
Qcfs Q (cfs)
( ) Hyd. No. 8 -- 100 Year
28.00 28.00
24.00 24.00
20.00 20.00
16.00 16.00
12.00 12.00
8.00 8.00
4.00 4.00
0.00 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Time (hrs)
Hyd No. 8 ------ Hyd No. 5 Hyd No. 7