Loading...
HomeMy WebLinkAbout~Master - Approving Change Order No. 2 on Contract with Visu-Sewer, Inc. for 2019/20 Sanitary Sewer Rehabilitation (Munn Woods) RESOLUTION NO. 21-445 RESOLUTION APPROVING CHANGE ORDER NO. 2 ON CONTRACT WITH VISU-SEWER, INC. FOR 2019/20 SANITARY SEWER REHABILITATION (MUNN WOODS) FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 2 in the amount of $33,993.97 on contract with Visu-Sewer, Inc., of Pewaukee,Wisconsin, for the 2019/20 Sanitary Sewer Rehabilitation(Munn Woods)be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS l O'h day of August, 2021. Diane R. Voss, City Clerk John A. Haila, Mayor Introduced by: Martin Seconded by: Beatty-Hansen Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Martin Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 1 Oth day of August, 2021. CITY OF AMES PUBLIC WORKS - ENGINEERING DIVISION Date ACITY OF CONTRACT CHANGE ORDER# 1 P.O# 57599 �; Ames ACCT# 522-8542-489.75-14 PROJECT: 2019/20 Sanitary Sewer Rehabilitation (Munn Woods) CONTRACTOR CHANGE ORDERS APPROVED TO DATE: 1 $32,700.91 11 PREVIOUS APPROVED Visu-Sewer. Inc 2 12 CHANGE ORDERS (Name) W230 N 4855 Betker Drive 4 14 ORIGINAL CONTRACT ---------------------------Address)-------------------------- 5 15 $2,190,212.40 Pewaukee, WI 53072 6 16 CURRENT ADJUSTMENT ------------------------(City-State,Zip)----------------------- 7 17 $33,993.97 8 18 CUMULATIVE CHANGE -------------------------------------------------------------- 9 19 ORDERAMOUNi 10 20 $66,694.88 Requires City Council Approval ADJUSTED CONTRA $2.256,907.28CT The contract is hereby modified and amended as follows: ITEM I DESCRIPTION I UNIT PRICE I QUANTITY1 TOTAL 2.5 Modified Subbase TON $51.70 76.67 $3,963.84 4.2 12" CMP Storm Sewer LF $132.00 160.75 $21,219.00 4.3 8" CIPP Lining LF $38.50 (642.00) IS24.717.00) 4.4 10" CIPP Lining LF S43.50 6.00 S261.00 4.5 15" CIPP Lining LF $74.00 12.00 $888.00 4.6 18" CIPP Lining LF $84.75 (13.00) ($1,101.75) 4.7 Heavy Cleaning LF $1.00 525.00 $525.00 4.8 Root Cutting LF $1.00 (666.00) $666.00) 4.9 Reinstate 4"/6" Service EA $125.00 1.00 $125.00 4 10 Air Test Service EA $1,170.00 (6.00) ($7.020.00) 4 11 Grout Failed Service EA $1.00 (2.00) ($2.00) 4.12 Cut Intruding Taps EA $425.00 4.00 $1,700.00 4.13 Cut Roots in/Ream Services EA $1,400.00 13.00 $18,200.00 4 15 Sanitary Sewer Spot Liner EA $3.950.00 (1,00) ($3.950.00) 6.2 Modify SAMH02947 LS $3.630.00 (1.00) $3,630.00) 6.3 Casting/Chimney Casting/Chimney Replacement PCC Manholes EA $2,255.00 (2.00) ($4,510.00) 6.4 Casting/Chimney Casting/Chimney Replacement Mason Manh EA $2,310.00 1.00 $2,310.00 6.7 Cementitious Liner(1) EA $2,455.00 (1.00) ($2,455.00) 6.8 Chemical Grout (K) EA $950.00 2.00 $1,900.00 6.9 Additional Chemical Grout GAL $10.00 470.00 $4,700.00 8.1 Signs EA $305.00 6.00 $1,830.00 9.1 Foundation Material TON $82.50 59.00 $4,867.50 9.2 Erosion Stone TON $82.50 116.17 $9,584.03 9.3 Revetment Stone TON $93.50 117.17 $10,955.40 9.5 Tern ora Erosion Control MattingSY $2.20 4.16 $9.15 9.7 Turf Reinforcement Matting SY $11.00 603.40 $6.637.40 9.9 Fertilizing, Seeding & Mulching ACRE $3,630.00 0.58 $2,105.40 It is mutually agreed that the contract price is increased/decreased by Total: $33,993.97 payable/deductible immediately upon completion of the work called for in this order. As a result of this change order, the time for completion of the above-mentioned contract is hereby extended by an additional 0 days. CC: Project Engineer. PW Mgmt. Asst., Finance, Contractor 7/30/2021 10:49 AM This change order is incorporated into and governed by the above mentioned contract. Accepted for Contra Recommen r Zp5roval by the City of Ames8/2/2021 ContractorlOw Date Municipal E at For the City of Ames C+�' . _ Pu06 Works Director Date G44A4a 69- M � Date Page 1 of 1 CC: Project Engineer, PW Mgmt. Asst., Finance, Contractor 7/30/2021 1 10:49 AM