Loading...
HomeMy WebLinkAbout~Master - Change Order No. 2 for Homewood Slope Stabilization Project RESOLUTION NO. 21-225 RESOLUTION APPROVING CHANGE ORDER NO. 2 ON CONTRACT WITH RW EXCAVATING SOLUTIONS, INC. FOR HOMEWOOD SLOPE STABILIZATION PROJECT FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No.2 in the amount of$-85,878,on contract with RW Excavating Solutions,Inc., of Prairie City, Iowa, for the Homewood Slope Stabilization Project be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 27th day of April, 2021. Diane R. Voss, City Clerk John A. Haila, Mayor Introduced by: Betcher Seconded by: Junck Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 27th day of April, 2021. CITY OF AMES PUBLIC WORKS - ENGINEERING DIVISION Date 22-Apr-21 Aw CITY of CONTRACT CHANGE ORDER# 2 P.O.# 58875 A me s ACCT# VARIOUS PROJECT: Homewood Slope Stabilization CONTRACTOR CHANGE ORDERS APPROVED TO DATE: 1 11 PREVIOUS APPROVED RW Excavating Solutions, Inc_ 2 12 CHANGE ORDERS - - - - ------------------------------ (Name) 3 13 $35,070.40 18293 S 88th Ave 4 14 ORIGINAL CONTRACT. ------------------------------------------------------------------------ (Address) 5 15 $535,192.55 Prairie-City,-IA 50228---------- ------- 6 16 CURRENT ADJUSTMENT ---- - (City,State,Zip) 7 17 -$85,878.00 8 18 CUMULATIVE CHANGE ------------------------------------------------------------------------ 9 19 ORDER AMOUNT 10 20 $85,878.00 Requires City Council Approval ADJUSTED CONTRACT $484,384.95 The contract is hereby modified and amended as follows: ITEM I DESCRIPTION I UNIT I PRICE I QUANTITY TOTAL 6"A2000 perforated pipe installed with 1"clean bedding rock 6" under and at least 1'over the ADD 7 pipe at base of slope near trail LF $31.00 500.00 $15,500.00 ADD 8 Outlets and trail repair LS $6,000.00 1.00 $6,000.00 Wooden Fence(price adjust for additional length 9.1 due to lumber prices increasing) LF $48.22 100.00 $4,822.00 7.4 Pavement Removal SY $20.00 (1,100.00) ($22,000.00) 7.1 Pavement, HMA,6" SY $82.00 (1,100.00) ($90,200.00) It is mutually agreed that the contract price is increased/decreased by: Total:1 85,878.00) payable/deductible immediately upon completion of the work called for in this order. As a result of this change order, the time for completion of the above-� ntioned contract is hereby extended by an additional 0 days. This change o er is incorporated i to and governed by the above mentioned contract. Acc pt Cont r: Recommen proval by the City of Ames: Co r caner Date Municipal Engineer Date For the City of Ames: Public Works Director Date MQ p r Gate Page 1 of 1 CC: Project Engineer, PW Mgmt. Asst., Finance, Contractor 4/22/2021 19:50 AM