RESOLUTION APPROVING CHANGE ORDER NO. 3
ON CONTRACT WITH
DGR ENGINEERING
FOR ENGINEERING SERVICES FOR THE ELECTRIC POWER
LINE RELOCATION AT SE 16TH STREET & SOUTH DUFF AVENUE
FOR THE CITY OF AMES,IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper on the
above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Change Order No. 3 in an amount not to exceed$32,500, on contract with DGR Engineering,
of Rock Rapids,Iowa,for the Engineering Services for the Electric Power Line Relocation at SE 16'
Street and South Duff Avenue be approved and adopted as attached hereto and made a part hereof
by this reference.
ADOPTED THIS 9`' day of March, 2021.
Diane R. Voss, City Clerk John A. Haila, Mayor
Introduced by: Gartin
Seconded by: Betcher
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 9tn day of March, 2021.
CHANGE ORDER NO. 3
CONTRACT / BID NO: I
Ames," PURCHASE ORDER NO: 54798
November 24, 2020
Project: SE16th Street & S. Duff Avenue Intersection Improvements
Engineering
Services for Electric Power Line Relocations
Contractor Name: DGR Engineering Change Orders Approved to Date:
Address: 1302 South Union Street 1 1 3/30/2018 3
City,State &Zip Code: Rock Rapids, IA 51246 2 6/25/2019 4
The contract is modified as follows upon execution of this Change Order. The changes included in this
change order are made in order to carry out the original intent of the contract. The changes included in
this change order are to be accomplished in accordance with the terms, stipulations, and conditions of
the original contract as though included herein.
DESCRIPTION COST
This change order is for the additional time due to the scope changes to the
original work scope and to cover any additional consulting that may occur.
Note: $32,500.00
Change Order#1 —Changed internal City account number. No cost change.
Change Order#2— Reopened closed PO. Additional work to be completed. No
cost change.
Contract Price:
Original contract rice: $28,000.00
Change orders approved to date: $0.00
Amount of this change order: $32,500.00
Adjusted contract price including this change order: $60,500.00
Recomm a by: c pted b City of A es: Acce ted by Con ultant:
Do ald E. Kom lotTrWHaila Signatu e
Director of Electric Services Mayor Curt D. Dieren, Vice President
City of Ames, Iowa tity of Ames Printed name & title
—es �li✓ Z-/ 1,2O-Z 3-5-2021
Date Date Date