Loading...
HomeMy WebLinkAbout~Master - Change Order No. 3 with DGR Engineering for Engineering Services for the Electric Power Line Relocation at SE 16th Street & South Duff Avenue RESOLUTION NO. 21-113 RESOLUTION APPROVING CHANGE ORDER NO. 3 ON CONTRACT WITH DGR ENGINEERING FOR ENGINEERING SERVICES FOR THE ELECTRIC POWER LINE RELOCATION AT SE 16TH STREET & SOUTH DUFF AVENUE FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 3 in an amount not to exceed$32,500, on contract with DGR Engineering, of Rock Rapids,Iowa,for the Engineering Services for the Electric Power Line Relocation at SE 16' Street and South Duff Avenue be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 9`' day of March, 2021. Diane R. Voss, City Clerk John A. Haila, Mayor Introduced by: Gartin Seconded by: Betcher Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 9tn day of March, 2021. CHANGE ORDER NO. 3 CONTRACT / BID NO: I Ames," PURCHASE ORDER NO: 54798 November 24, 2020 Project: SE16th Street & S. Duff Avenue Intersection Improvements Engineering Services for Electric Power Line Relocations Contractor Name: DGR Engineering Change Orders Approved to Date: Address: 1302 South Union Street 1 1 3/30/2018 3 City,State &Zip Code: Rock Rapids, IA 51246 2 6/25/2019 4 The contract is modified as follows upon execution of this Change Order. The changes included in this change order are made in order to carry out the original intent of the contract. The changes included in this change order are to be accomplished in accordance with the terms, stipulations, and conditions of the original contract as though included herein. DESCRIPTION COST This change order is for the additional time due to the scope changes to the original work scope and to cover any additional consulting that may occur. Note: $32,500.00 Change Order#1 —Changed internal City account number. No cost change. Change Order#2— Reopened closed PO. Additional work to be completed. No cost change. Contract Price: Original contract rice: $28,000.00 Change orders approved to date: $0.00 Amount of this change order: $32,500.00 Adjusted contract price including this change order: $60,500.00 Recomm a by: c pted b City of A es: Acce ted by Con ultant: Do ald E. Kom lotTrWHaila Signatu e Director of Electric Services Mayor Curt D. Dieren, Vice President City of Ames, Iowa tity of Ames Printed name & title —es �li✓ Z-/ 1,2O-Z 3-5-2021 Date Date Date