Loading...
HomeMy WebLinkAbout~Master - Approving Change Orders No. 3-5 on Contract with Story Construction Company for CyRide Interior Improvement Project RESOLUTION NO. 21-042 RESOLUTION APPROVING CHANGE ORDERS NO. 3-5 ON CONTRACT WITH STORY CONSTRUCTION COMPANY FOR CYRIDE INTERIOR IMPROVEMENT PROJECT FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that Change Orders are necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Orders No. 3-5 in the total amount of$32,594, on contract with Story Construction Company of Ames,Iowa,for the CyRide Interior Improvement Project be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 26`h day of January, 2021. Diane R. Voss, City Clerk John A. Haila, Mayor Introduced by: Gartin Seconded by: Corrieri Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 26t'day of January, 2021. STORY CONSTRUCTION Change SMALL PROJECTS GROUP Request Summary PROJECT CyRide 2020 Interior Improvements CHANGE REQUEST NO.: CR-04 DATE December 31, 2020 SUBJECT Additional Window Coverings PROPOSED CHANGE DESCRIPTION: Furnish labor to remove and dispose of the existing window coverings in the south offices as shown on the floor plan. Furnish labor and materials to install four new vertical blinds in the south offices as shown on the plans. Schedule Impact: Four to six weeks after approval Attachments: N/A SUMMARY OF COST BREAKDOWN: Story Construction Co. S568 00 1st Window Coverings, Inc 1,306.00 Subtotal $1,874.00 Fee $281.00 Total Cost for Change Request 04 $2,155.00 Story Construction Co. Designer Owner Contractor Designer Owner [ � Accepted � Accepted [ ] Not Accepted [ ] Not Accepted � D By: �. By: N/A By: Date: December 31, 2020 By N/A e: ,2-a-.9 2810 Wakefield Circle, Ames, IA S0010 phone 515.232.43S8 fax 51S.232.3549 I www.storycon.com GENERAL CONTRACTING ' DESIGN+BUILD I CONSTRUCTION MANAGEMENT zvrORY CONSTRUCTION Change SMALL PROJECTS GROUP Request Summary PROJECT: CyRide 2020 Interior Improvements CHANGE REQUEST NO.: CR46 DATE: January 6, 2021 SUBJECT:Additional Lighting PROPOSED CHANGE DESCRIPTION: Furnish labor to remove and dispose of the existing light fixtures and install the new light fixtures as shown on the drawing. Schedule Impact:To Be determined. Lead time for material will not be determined until the order is placed. Attachments: N/A SUMMARY OF COST BREAKDOWN: Story Construction Co. $814.00 Jaspering Electric 5,107.00 Subtotal $5,921.00 Fee $888.00 Total Cost for Change Request 05: $6,809 00 Story Construction Co. Designer Owner Contractor Designer Owner [ ] Accepted Accepted [ ] Not Accepted [ ] Not Accepted Ci ��� By: 6? By: N/A BY:4 Date: January 6, 2021 By: N/A Date: l 2810 Wakefield Circle, Ames, IA 50010 phone 515.232.4358 fax 515.232.3549 1 www.storycon.com GENERAL CONTRACTING DESIGN+BUILD I CONSTRUCTION MANAGEMENT STORY CONSTRUCTION Change SMAI I PROJECTS GROUP Request Summary PROJECT. CyRide 2020 Interior Improvements ) CHANGE REQUEST NO.: CR DATE December 31, 2020 SUBJECT:Additional Carpet PROPOSED CHANGE DESCRIPTION: Furnish labor to remove the office furniture and store on the second floor. Furnish labor to remove the existing carpet in the areas shown on the drawings. Furnish labor and materials to install new carpet as shown on the drawings. Furnish labor to reinstall the office furniture. Note: Two offices would be completed at one time. Schedule Impact: To Be determined. Lead time for material will not be determined until the order is placed Attachments: N/A SUMMARY OF COST BREAKDOWN: Story Construction Co. $9,913 00 Ralph N Smith 10,635.00 Subtotal $20.548 00 Fee $3,082 00 Total Cost for Change Request 06 $23 630 00 Story Construction Co. Designer Owner Contractor Designer Owner [ ] Accepted Accepted [ ] Not Accepted [ ] Not Accepted By: 1�• By: N/A By: i Date December 31, 2020 By: N/A Date 2,2--2l 2810 Wakefield Circle, Ames, IA 50010 ! phone 515.232.4358 fax 515.232.3549 I www.storycon.com GENERAL CONTRACTING i DESIGN+BUILD I CONSTRUCTION MANAGEMENT