Loading...
HomeMy WebLinkAboutA8 ITEM #: 2 DATE: 03-14-12 CITY OF AMES DEPARTMENT OF PLANNING AND HOUSING REPORT TO THE ZONING BOARD OF ADJUSTMENT DATE PREPARED: March 9, 2012 MEETING DATE: March 14, 2012 REQUEST FOR A CONDITIONAL USE PERMIT IN THE FLOOD WAY OVERLAY DISTRICT: To allow excavation in the floodway. PROPERTY OWNER/APPLICANT: Pyle Land LLC, Dennis Pyle LOCATION: 1400 SE 16th Street and 1500 SE 16th Street ZONING: HOC (Highway Oriented Commercial); O-GSE (Southeast Gateway Overlay);A (Agriculture) ZONING OVERLAY: FW Floodway Overlay District FEMA F.I.R.M. DESIGNATION: Floodway PROJECT DESCRIPTION: The applicant proposes to remove soil within the floodway and redeposit it adjacent to (but not in) the floodway in order to develop a commercial site. The excavation will be irregular in shape, approximately 860 feet by 430 feet. The depth will be about 20 feet. It is anticipated that there will be a permanent pool which will rise and fall, influenced by the ground water of the Skunk River. The edge of the excavation will be about 130 feet from the east bank of the Skunk River and 15 feet from the edge of the easement over the City's 30-inch raw water line which lies on the east side of the Skunk River. The applicant will provide an easement between the excavation and the development site for City access to the water main easement. This is in addition to the existing easement that lies along the south side of SE 16th Street. The excavated soil will be placed to the east of the excavation site. It will raise the site about 11 feet above natural grade. The soil that is stockpiled currently on the site will be regraded and reduced in height. Although the fill site is outside the floodway and floodway fringe as determined by the February 20, 2008 FEMA study, the previous maps placed this site within the floodway fringe. Staff reviewed the plan and the maps with the Iowa Department of Natural Resources, which stated that this likely is a mapping error caused when the previous paper maps were scanned and digitized for the Digital Flood Insurance Rate Maps in 2008. If the site were indicated as being within the floodway fringe, development could occur only if the building pad was elevated to 3 feet above the base 1 flood elevation. The applicant will be raising his development site a minimum of 5 feet above the base flood elevation. APPLICABLE CODE SUMMARY: Below are excerpts of Chapter 9, Flood Plain Zoning Regulations, of the Ames Municipal Code. These excerpts provide the standards on which the project is to be evaluated (Section 9.4(3) and Section 9.5(2)), and describe the factors on which the Zoning Board of Adjustment must consider in rendering a decision (Section 9.7(3)(e)(ii)(a)). Following the standards and the factors, staff has provided comments based upon an analysis of the site, the submitted project details, and consultation with appropriate City and State officials. Conditional Uses Allowed (2) Conditional Uses. The following uses which involve structures (temporary or permanent), fill, or storage of materials or equipment may be permitted only upon issuance of a Conditional Use Permit by the Zoning Board of Adjustment as provided for in Sec. 9.7. Such uses must also meet the applicable provisions of the Floodway Overlay District Performance Standards. (a) Uses or structures accessory to open-space uses. (b) Circuses, carnivals, and similar transient amusement enterprises. (c) Drive-in theaters, new and used car lots, roadside stands, signs, and billboards. (d) Extraction of sand, gravel, and other materials. (e) Marinas, boat rentals, docks, piers, wharves. (f) Utility transmission lines, underground pipelines. (g) Other uses similar in nature to uses described as permitted uses or listed conditional uses, which are consistent with the performance standards of Subsection (3) below and the general spirit and purpose of this ordinance. Floodway Performance Standards Section 9.4(3) describes the performance standards for conditional uses that are allowed by the Board. Following the code excerpts are staff comments. The applicant's statements addressing these standards are included in his application. (3) Performance Standards. All Floodway Overlay District uses allowed as a Permitted or Conditional Use shall meet the following standards: (a) No use shall be permitted in the Floodway Overlay District that would result in any increase in the base flood elevation level. Consideration of the effects of any development on flood levels shall be based upon the assumption that an equal degree of development would be allowed for similarly situated lands. Evidence required will be a hydraulic study performed by a registered professional engineer for the area of drainage involved. (b) All uses within the Floodway Overlay District shall: (i) Be consistent with the need to minimize flood damage. 2 (ii) Use construction methods and practices that will minimize and resist flood damage. (iii) Use construction materials and utility equipment that are resistant to flood damage. (c) No use shall affect the capacity or conveyance of the channel or floodway or any tributary to the main stream, drainage ditch, or any other drainage facility or system. (d) Structures, buildings and sanitary and utility systems, if permitted, shall meet the applicable performance standards of the Floodway Fringe Overlay District and shall be constructed or aligned to present the minimum possible resistance to flood flows. (e) Buildings, if permitted, shall have a low flood damage potential and shall not be for human habitation. (t) Storage of materials or equipment that are buoyant, flammable, explosive or injurious to human, animal or plant life is prohibited. Storage of other material may be allowed if readily removable from the Floodway Overlay District within the time available after flood warning. (g) Watercourse alterations or relocations (channel changes and modifications) must be designed to maintain the flood carrying capacity within the altered or relocated portion. In addition, such alterations or relocations must be approved by the Department of Natural Resources. (h) Any fill allowed in the floodway must be shown to have some public beneficial purpose and shall be limited to the minimum amount necessary. (i) Pipeline river or stream crossings shall be buried in the streambed and banks or otherwise sufficiently protected to prevent rupture due to channel degradation and meandering or due to the action of flood flows. 6) It shall be the responsibility of adjacent property owners to maintain the location and carrying capacity of the floodway adjacent to their property. (a) The applicant has provided an "Engineering `No-Rise' Certificate" by which the engineer states that because the project is excavation only, it will not result in an increase in base flood elevations in the floodway. He states that the excavation will, in fact, increase the flood storage capacity of the floodway. The IDNR is satisfied that the excavation will have no impact on the base flood elevation of the Skunk River. (b) There is no construction planned. The site will be excavated and seeded. (c) The excavation site is about 130 feet from the channel of the river. The excavated site will have no impact on the river channel during normal water flow. City staff has reviewed the location of the proposed grading with staff of the Iowa Department of Natural Resources. The IDNR is satisfied that the excavation will have no impact on the channel of the Skunk River. There is a storm water drainage easement to channel storm water from SE 16th Street to the river. This easement is located along the north edge of the proposed excavation and will be maintained. Storm water from SE 16th Street will be confined to the existing drainage channel and will not be directed to this excavation area. 3 City staff also provided copies of the application and request to the Iowa Department of Transportation for their review. The IDOT has no concerns over the proximity of the excavation to US 30. (d) There will be no structures. (e) There will be no buildings. (f) There will be no storage within the floodway. (g) No watercourse alterations will occur. (h) No fill will be introduced on site. (i) The project does not include any stream crossings. However, there is a water line adjacent to the excavation site that carries the city's raw water from the well fields south of US 30. This water line is parallel to and on the east bank of the Skunk River. The water main lies within a 30-foot easement. The top of the proposed excavation is 15 feet from the edge of the easement. Water and Pollution Control staff has reviewed the proposed excavation and are satisfied that the water main is sufficiently protected. Q) The property owner is the responsible party for maintaining the area within and around the project site. Factors Upon Which the Decision Shall be Based Section 9.7(3)(e)(2)(a)describes the factors that the Board must consider when approving a Conditional Use Permit. a. Factors Upon Which the Decision of the Board Shall be Based. In passing upon requests for Conditional Uses or Variances, the Zoning Board shall consider all relevant factors specified in other sections of this ordinance and: 1. The danger to life and property due to increased flood heights or velocities caused by encroachments. 2. The danger that materials may be swept onto other lands or downstream to the injury of others. 3. The proposed water supply and sanitation systems and the ability of these systems to prevent disease, contamination and unsanitary conditions. 4. The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner. 5. The importance of the services provided by the proposed facility to the community. 6. The requirements of the facility for a flood plain location. 7. The availability of alternative locations not subject to flooding for the proposed use. 4 8. The compatibility of the proposed use with existing development and development anticipated in the foreseeable future. 9. The relationship of the proposed use to the comprehensive plan and flood plain management program for the area. 10. The safety of access to the property in times of flood for ordinary and emergency vehicles. 11. The expected heights, velocity, duration, rate of rise and sediment transport of the flood water expected at the site. 12. Such other factors which are relevant to the purpose of this ordinance. In considering these factors, staff offers the following comments for the consideration of the Board. 1. There is no anticipated danger to life due to a flood event as the proposed excavation will not increase base flood elevations. The excavation will increase the storage capacity of the floodway. 2. There will be no structures or materials stored on-site. There will be nothing that can be swept downstream in the event of a flood. 3. The site will not have water or sanitary sewer service. 4. It is anticipated that this site will be inundated during a flood event. However, there would be no structural damage as there are no structures proposed in the floodway. 5. The excavation of the site is to provide fill for an adjacent development site. The site has already been partially filled from soil from the recent US 30 highway reconstruction. The applicant wishes to complete the fill with the adjacent soil from the floodway. 6 & 7. The soil for the development need not come from this adjacent floodway site. However, the applicant owns the land and has provided evidence that the excavation will not have an impact on the base flood elevation. 8. The excavated site will maintain a permanent pool, although the water elevation will rise and fall with the level of the Skunk River. The banks of the pond will be gently graded at a 10:1 slope while the interior of the pool will be a steeper 3:1 slope. Native grasses will be planted on the site. 9. The Ames Land Use Policy Plan identifies this area as Agriculture and Farmstead with a Greenways overlay. The proposed excavation is not inconsistent with these designations. The area between the excavation and the river bank will remain as a riparian corridor, consistent with the Greenway overlay designation. The excavation is consistent with the flood plain management regulations in that it does not increase base flood elevations or flood velocities. 10. Access to the US 30 bridge, the SE 16th Street bridge, and the raw water line will be 5 maintained through two access easements across the site. One was established as part of the water main installation and the other will be established as part of this project. The City is in receipt of the easement from the owner for this new easement but has refrained from recording it until after approval of the conditional use permit. 11 . In the event of a flood, the excavation is not anticipated to increase heights or velocities of flood waters. The permanent seeded areas will likely reduce sedimentation to a greater extent than the current farming practices do. CONCLUSION: Based upon the above analysis of the project which included a reading of the relevant portions of the Flood Plain Zoning Regulations, consideration of the information supplied by the applicant, and consultation with relevant City officials, staff concludes that the proposed development meets all criteria for approving the requested conditional use permit. ALTERNATIVES: 1. The Zoning Board of Adjustment may approve the Conditional Use Permit based on the staff's analysis and conclusions. Staff proposes the following conditions to accompany this alternative: a) The applicant obtain a Flood Plain Development Permit prior to excavation and comply with any conditions imposed therein. b) The applicant obtain a COSECSO permit prior to excavation. c) The applicant provide a signed easement in a form suitable for recording to the City for the new access. This easement needs to be recorded prior to excavation. 2. The Zoning Board of Adjustment may deny this request for a Conditional Use Permit if the board's findings are that the standard(s) have not been met, detailing the specific shortfalls. 3. The Zoning Board of Adjustment may table this request for a Conditional Use Permit and request additional information from the developer, City staff, or Iowa Department of Natural Resources, and subsequently render a decision within a reasonable time period. STAFF RECOMMENDATION: The Department of Planning & Housing recommends that the Zoning Board of Adjustments act in accordance with Alternative #1 , which is to approve the Conditional Use Permit for development in the General Flood Plain Overlay District based on the staff findings and with the conditions noted. SAPLAN_SHR\Council Boards Commissions\ZBA\Conditional Use in Floodway\1400-1500_SE_16th-Excavation in Floodway-03-14- 12.doc 6 .......... r Floodway Floodway Fri6ge Excavation Site .__..__.._ Fill Site z -- a� a afiJ�p �i1GNA 30 U F _._ 1 G Floodway Fringe Floodway Frii-ige - Flo odv+ray AI General Location Map f ® Excavation Site Feet 0 GO 400 800 Fill Site 7 Floodplain Development Permit No. Engineering "No-Rise" Certificate Community Count-y _ Ujf)� State low"a .......... ............................... u, 2 Srxml R+2n e, 28, 2011 � md,P.E., F Ap c D Enuineer Dale 414 S, 17th Svor-t s;jitt, 1 7,A, Address kit -kV Phone Phone SITE -�-61—'A YPTI 1, Locatian Section Range Township Street Address'.. 1'V,,0 a nd 1 'SE 1 2-Panet(s)no.ofNF]P maps)affectod '9169CC-1164E 3 Type of Development.: Fillirig_ Grading_ Excavration X Min Improvounents Routine Maint Substantial Improv New Const Other 4,Description of Development, V'11-1[)C'111y' ro o'"'l t,Ie inrea f arnx)%vn, 5. Name of flooding source affected, ',Skjnk Rwf-r COMMENTS, 77-7,.7 :-x,,way, %cv�e is a nf-2,g�iqible eFo r of gha- �.'l -,w <caivation as between W,1.1'sff"hr it dHl�rr 1 1 Er"o j"'o i k' hr Ur This is to certity that I am a duly qualified engineer licensed to practice in the State of lo"Y4 I It is to further certify that the attached technical data supports the fact that the proposed development described above will NOT create any increase to the 100-year elevations on said flooding source above at putlished cross-sections in the Flood Insurance Study fro the above community dated and will not create any increase to the. 100-year flood elevations at unpublished cross-sections in the vicinity of the proposed development. (Seal) Tilt License No, 12,31,20