HomeMy WebLinkAbout~Master - Change Order No. 1 for 2018/19 Sanitary Sewer Rehabilitation (Siphon) RESOLUTION NO. 20-657
RESOLUTION APPROVING CHANGE ORDER NO. 1
ON CONTRACT WITH
SYNERGY CONTRACTING,LLC.,
FOR 2018/19 SANITARY SEWER REHABILITATION (SIPHON)
FOR THE CITY OF AMES,IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper on the
above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Change Order No. 1 in the amount of$174,575,on contract with Synergy Contracting,LLC,of
Bondurant,Iowa,for the 2018/19 Sanitary Sewer Rehabilitation(Siphon)be approved and adopted
as attached hereto and made a part hereof by this reference.
ADOPTED THIS 22nd day of December, 2020.
Diane R. Voss, City Clerk John A. Haila, Mayor
Introduced by: Corrieri
Seconded by: Betcher
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 22nd day of December, 2020.
Date tt-Dec-20
urn a
_; Ames CONTRACT CHANGE ORDER tt 0 P o N 5e661
M:CTN 522-8542-489.7514
i PROJECT:
I( 2018-19 Sanitary Sewer Rehab.(Siphon Rehab)
CONTRACTOR CHANGE ORDERS APPROVED TO DATE:
1 11 PREvxwS APPROVEd
Syner v Contracting,LLC 2 12 CHANGE ORCE14S
Wane( — — — 3 13 S. 00
1120 2nd St NE 4 14 Cpraut CONTRACT
-- --- ------------Address) 5 15 $1.440-778.t1<)
Bondurant,IA 50035 6 16 cwueRr sora.rerr
(5v state•Zp) --�- - -- 7 17 -11174,575.00
8 18 CLA&XATIVE DNANGE
9 19 ORDER AAXXM-,
10 20 -S174 575.00
Requires City Council Approval nO.vSTED CONTRACT
S'255 2C3 M
The c°ntract is hm"modlrl.d and mended as follows
ITEM DESCRIPTION UNIT PRICE QUANTITY TOTAL
1 Mobilization.Savings Spec mix instead ct Redi-Mix ,0001, LS :ri0.000 1L. 1 00 ($60.000.00)
WHKS as construction inspectors($10,000)
2.1 Site Access and Restoration.Savings:Final Completion Date LS ($30.000 X) 1.00 ($30,000.00)
extended to November 26 2021.
4.4 Heavy Clean Siphon Pipes(21--24"Dia.).Savings:Delete clearing LF $114.80 (500.00) (557 400 00)
of twin 20"DI at South Duff
6.1 lRehabilitale Inlet and Outlet Structures and Related Work at LS ($2.175,30) 1.00 (S2.175.00)
Veenker West Savings:Deduct Plug Valves,Replace with Straight
Pipe and Sleeves
6.2 Rehabilitate Inlet and Outlet Structures and Related Work at LS ($10,000 00) 1 00 ($10,000 00)
Veenker East.Savings:Additional Access to Veenker East
Upstream(S5,000),and Delete internal flexible urethane chimney
sealant ISS 000.
6.3 Rehabilitate Inlet and Outlet Structures and Related Work at High LS ($5.000 00) 1 00 ($5.000 00)
School.Savings:Delete internal flexible urethane chimney sealant.
6.4 Rehabilitate Inlet and Outlet Structures and Related Work at South LS 45.000 00) 100 (S5.000 00)
Duff Savings Delete intemal flexible urethane chimney sealant
$5.000.
6.5 Rehabilitate Inlet and Outlet Structures and Related Work at Nikkol LS ($5,000 00) 1 00 ($5.000 00)
Savings:Delete internal flexible urethane chimney sealant
It is mutually agreed that the contract price is increased/decreased by Total: (5174,575.001
payable/deductible immediately upon completion of the work called for in this order As a result o/this change order.
the time for completion of the above-mentioned contract is hereby extended by an additional 0 days.
I•his change order is incorporated into and govemed by the above mentioned contract This change order is Incorporated into and governed by the above mentioned c
Act:ept for Contractor Recommen ell!M by the City of Mies (77 �/�
l 4` 1 �iJ
C bam �IYPKpil E Y1/!I tAte
l ZfJ°,�City of Antes*
tato la cti.rr� Oar �rAr+se. (ti'Ct.14 w can
Page 1 of 1