Loading...
HomeMy WebLinkAbout~Master - Change Order No. 3 for 2017/18 Arterial Street Pavement Improvements (13th Street - Ridgewood Avenue to Harding Avenue) RESOLUTION NO. 20-611 RESOLUTION APPROVING CHANGE ORDER NO. 3 ON CONTRACT WITH CON-STRUCT, INC., FOR 2017/18 ARTERIAL STREET PAVEMENT IMPROVEMENTS (13TH STREET -RIDGEWOOD AVENUE TO HARDING AVENUE) FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 3 in the amount of$58,153.60 on contract with Con-Struct, Inc., of Ames, Iowa, for the 2017/18 Arterial Street Pavement Improvements (13th Street-Ridgewood Avenue to Harding Avenue) be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 24th day of November, 2020. Diane R. Voss, City Clerk John A. Haila, Mayor Introduced by: Gartin Seconded by: Betcher Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 24th day of November, 2020. i r q TY CIF ANES PUBLI C WR(S - ENGI NEERI NG a vl SI ON Date 5-Nov-20 AM- ciTr of CONTRACT CHANGE ORDER 3 P.Q.# 55723 # Ames Balancing ACCT# VARIOUS i PROJECT: 2017-18 Arterial Street Improvement 13th Street CONTRACTOR CHANGE ORDERS APPROVED TO DATE: 1 $24,554,37 11 PREVIOUS APPROVED Can-Struct Inc. 2 $10,568,51 12 CHANGE ORDERS (Name) 3 13 $35,122.88 305 S Dayton Avenue ______ 4 14 ORIGINAL CONTRACT. ----------- -------------------------------------------- (Address) 5 15 $1,453,187.05 Ames, IA 50010 6 16 CURRENT ADJUaTMENT -------------------------(City.StaiWYZ)------------------------- 7 17 58153.60 8 18 CUMULATIVE CHANGE 9 19 ORDERAMOUNT 10 $93,276.48 Requires City Council Approval ADJUSTED CONTRACT $1,430,156,33 The contract Is hereby modified and amended as follows: ITEM DESCRIPTION I UNIT I PRICE I QUANTITY1 TOTAL 7 STANDARD OR SLIP FORM PCC PAVEMENT, SY $52.00 85.80 $4.461.60 8 PORTLAND CEMENT CONCRETE PAVEMENT LS $4,000.00 1.00 $4,000.00 12 INTAKE, SW-501 EACH $3,000.00 1.00 $3,000.00 17 SUBDRAIN, LONGITUDINAL, SHOULDER 6 IN LF $12.00 252.00 $3,024.00 19 SUBDRAIN OUTLET, DR-303 EACH $330.00 8.00 $2,640.00 22 ISANITARY SEWER GRAVITY MAIN, TRENCHE LF $60.00 16.00 $960.00 23 SANITARY SEWER FORCE MAIN, TRENCHED LF $100.00 30.00 $3,000.00 24 REMOVE SANITARY SEWER PIPE LESS THAN LF $20.00 44.00 $880.00 25 REMOVAL OF PAVEMENT SY $7.00 87.10 $609.70 28 REMOVAL OF SIDEWALKS AND PAVED DRIVE SY $7.00 35.90 $251.30 29 SIDEWALKS AND DRIVEWAYS, P.C. CONCRE SY $49.00 185.80 $9,104.20 30 DETECTABLE WARNINGS, COMPOSITE POL SF $25.00 1.80 $45.00 35 PAINTED PAVEMENT MARKINGS, HIGH-BUILI STA $115.00 9.81 $1,128.15 39 WATER MAIN, TRENCHED, POLYVINYL CHLO LF $60.00 10.00 $600.00 40 WATER MAIN, TRENCHED, POLYVINYL CHLO LF $40.00 J202.0018,080.00 41 WATER MAIN, TRENCHED, POLYVINYL CHLO LF $45.00 276.00 $12,420.00 43 IFITTINGS BY COUNT, POLYVINYL CHLORIDE EACH $420.00 6.00 $2,520.00 44 WATER SERVICE STUB, COPPER, 1 IN. EACH $2,700.00 11.00 ($29,700.00 45 VALVE, GATE, DIP,6 IN. EACH $1,400.00 4.00 ($5,600.00 46 VALVE, GATE, DIP, 8 IN. EACH $1,700.00 2.00 $3,400.00 47 TAPPING VALVE ASSEMBLY, 6 IN EACH $3,500.00 1.00 ($3,500.00 49 FIRE HYDRANT ASSEMBLY, WM-201 EACH $5,000.00 1.00 $5,000.00 52 REMOVE HYDRANT ASSEMBLY EACH $800,00 1.00 $800.00 53 WATER MAIN ABONDONMENT EACH $2,500.00 1.00 $2,500.00 s 54 MULCHING, BONDED FIBER MATRIX ACRE $3,500.00 0.20 $700.00 F 55 SEEDING AND FERTILIZING URBAN ACRE $2,200.00 0.10 $220.00 s 56 STABILIZING CROP-SEEDING AND FERTILIZ ACRE $1,900.00 0.30 $570.00 6 57 WATERING FOR SOD, SPECIAL DITCH CONTi MGAL $60.00 50.00 $3,000.00 58 IMOBILIZATION FOR WATERING EACH $350.00 12.00 $4,200.00 59 PERIMETER AND SLOPE SEDIMENT CONTR LF $3.90 104.00 $405.60 60 PERMETER AND SLOPE SEDIMENT CONTRO LF $4.70 588,00 $2,763.60 61 REMOVAL OF PERIMETER AND SLOPE SEDI LF $0.60 484.00 $290.40 62 MOBILIZATION, EROSION CONTROL EACH $500.00 2.00 $1,000.00 63 MOBILIZATION, EMERGENCY EROSION CON EACH $1,000.00 1,00 $1,000.00 8004 LANDSCAPE RETAINING WALL SF $55.00 36.93 $2,031.15 21 IREMOVE STORM SEWER PIPE LESS THAN 01 LF $20.00 4.00 $80.00 CC: Project Engineer, PW Mgmt.Asst., Finance, Contractor 11/5/2020 1 3:45 PM r t is mutually agreed that the contract price is increased/decrease by: Tota : !L60 payable/deductible immediately upon completion of the work called for in this order. As a result of this change order, the time for completion of the above-mentioned contract is hereby extended by an additional 0 days. This change order is incorporated into and govemed by the above mentioned contract Acc far C tractor. Recommen5d0jocWroval by the City of Ames: Cunt orNwner Da Murridpal Date For the City of Am P Nc Wortrs Director Date G*ManeQer EA Date Page 1 of 1 1 i i 3 i i F 3 f i 7 E a i CC: Project Engineer, PW Mgmt.Asst., Finance, Contractor 1 1/5/2020 1 3:45 PM i