RESOLUTION AWARDING CONTRACT FOR THE UNIT 8 PRECIPITATOR ROOF
REPLACEMENT FOR THE ELECTRICAL SERVICES DEPARTMENT
FOR THE CITY OF AMES,IOWA
WHEREAS, on June 23, 2020, City Council approved the preliminary plans and
specifications for the Unit 8 Precipitator Roof Replacement; and,
WHEREAS, degradation to the current roof has resulted in water leakage throughout the
Power Plant during seasonal rainfalls and snow melting; and,
WHEREAS, bid documents were issued to 23 firms and six plan rooms; and,
WHEREAS, on August 19, 2020, two bids were received, and staff reviewed the bids and
concluded that the apparent low bid was submitted was by Henkel Construction Company of Mason
City, Iowa, in the amount of$487,784 (inclusive of Iowa sales tax); and,
WHEREAS, the Engineer's estimate was based on previous projects that the Engineer had
worked on that were similar in scope of manufacturing companies,but one main difference between
the previous projects and this project is the location and access to the roof at the Power Plant,which
is quite limiting and requires a lot of work-arounds for demolition and installation; and,
WHEREAS, the City previously solicited bids from roof contractors,but received no bids,
and the major concern was that potential bidders felt a portion of the project (replacing the roof
decking) would need to be performed by a general contractor and they were also concerned about
the location and access to the roof itself; and,
WHEREAS,the City is now bidding the project for a second time and sent the bid to general
contractors who would then subcontract a roofing company,and two bids were received(Henkel and
Hansen); and,
WHEREAS, after speaking with Henkel Construction Company,they reiterated that the re-
roofing portion of the project was not out of the ordinary, but the limited access to the roof for
demolition and installation could be challenging, especially when trying to address protecting the
interior portion of the Plant from flooding and debris; and,
WHEREAS, the approved FY 2019/20 budget was $208,000 allocated for this project and
the remaining $279,784 will be transferred from the unused balance in the Power Plant Fire
Protection Capital Improvement Plan.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that a contract to Henkel Construction Company of Mason City, Iowa, for the Unit 8 Precipitator
Roof Replacement in the amount of$487,784 (inclusive of Iowa sales tax) is hereby approved.
ADOPTED THIS 8`' day of September, 2020.
Diane R. Voss, City Clerk John A. Haila, Mayor
Introduced by: Gartin
Seconded by: Betcher
Voting aye: Betcher, Corrieri, Gartin, Junck, Martin
Voting nay: None Absent: Beatty-Hansen
Resolution declared adopted and signed by the Mayor this 8t' day of September, 2020.