HomeMy WebLinkAbout~Master - Approving Change Order No. 3 for the North River Valley Park Low Head Dam Improvements RESOLUTION NO. 20-448 RESOLUTION APPROVING CHANGE ORDER NO. 3 ON CONTRACT WITH RW EXCAVATING SOLUTIONS FOR NORTH RIVER VALLEY PARK LOW HEAD DAM IMPROVEMENTS FOR THE CITY OF AMES, IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 3 in the amount of$59,483.99, on contract with RW Excavating Solutions of Prairie City, Iowa, for the North River Valley Park Low Head Dam Improvements be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 18`h day of August,2020. mv Diane AVoss., City Clerk John A. Haila, Mayor Introduced by: Betcher Seconded by: Corrieri Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 18'' day of August, 2020. I T Y OF CHANGE ORDER NO. 3 AmesCONTRACT/BID NO: 2018-108 PURCHASE ORDER NO: 55420 August 11, 2020 FProjed: North River Valley Park Low Head Dam Improvements Contractor Name: RW Excavating Solutions,LC Change Orders Approved to Date: Address: 13293 S W Ave W 1 $3,900.00 3 City,State,&zip Code: Prairie Cilty,IA 50228 2 $40,662.90 4 The contract is modified as follows upon execution of this Change Order. The changes included in this change order are made in order to carry out the original intent of the contract. The changes included in this change order are to be accomplished in accordance with the terms, stipulations, and conditions of the original contract as though included herein. ACTION DESCRIPTION COST 450 tons of boulder at$92.48/ton due to changes in the channel and the large amount of unanticipated sand found below the dam resulting in the need for Add additional boulder to complete the project as designed. $41,616.00 51 cu.yds.of concrete grout at$470.00/cu.yd.to provide additional stability for boulder structures placed on the concrete sill and to force more water to flow over Add the structures than through them at lower flow. $23,970.00 80.25 cu.yds. Class E material at$76.05/cu.yd.for construction of channel and bank features. 178 cu. yds. of this material was included with Change Order#2, but Remove the entire quantity was not needed to complete the work. ($6,103.01) Contract Price: Original contract price: $776,534.88 Change orders approved to date: $44,562.90 Amount of this change order: $59,483.99 Adjusted contract price including this change order: $880,580.77 Accepted for RW Excavating Solutions, LC: City of Ames Approval: Ah 00 Signature Date Signature Date Printed Name &Title: 0a� 1,3 A;�(3n Mocraa-mck fflern��r