HomeMy WebLinkAbout~Master - Designating Municipal Engineer Tracy Warner as Authorized Representative to Sign the Grant Application RESOLUTION NO. 20-303
RESOLUTION DESIGNATING MUNICIPAL ENGINEER TRACY WARNER AS
AUTHORIZED REPRESENTATIVE TO SIGN THE GRANT APPLICATION
FOR THE CITY OF AMES, IOWA
WHEREAS, the East Industrial Area Utility Extension Project consists of the extension of
water and sanitary sewer to the recently annexed area east of Interstate 35 (I-35); and,
WHEREAS,water main and gravity sewer will be installed between I-35 and Patter Avenue
(formerly 590`''), force sewer will be installed from Teller Avenue(formerly 580th)to west of Freel
Drive, and a sewer lift station will be constructed; and,
WHEREAS,most of this new area to be served by City utilities east of I-35 has been certified
by the Iowa Economic Development Authority as the Prairie View Industrial Center; and,
WHEREAS, due to very high costs, on April 28, 2020, City Council rejected bids for
construction of these improvements,and staff was directed to contract with Stanley Consultants Inc.,
to create revised plans and specifications for extending utilities along East Lincoln Way at a reduced
cost(stopping sanitary sewer at Teller Avenue)with the goal to rebid the project in summer 2020;
and,
WHEREAS, the revised plans for re-bid will have a Base Bid of extending sanitary sewer
to Teller Avenue(580th)with an"Add Alternate"for consideration to extend sanitary sewer east of
Teller Avenue, as originally planned; and,
WHEREAS,the extent for water main installation will be extended to the eastern edge of the
industrial area, which is the same as previously bid plans; and,
WHEREAS, City staff, in partnership with the Ames Chamber of Commerce &Economic
Development staff,has identified a potential federal economic development grant that could apply
toward this project; and,
WHEREAS, during a conference call with the Economic Development Administration
(EDA) representative, it was identified that installation of resilient infrastructure to facilitate the
growth and development of business along the East Lincoln Way and Prairie View Industrial Center
makes this a favorable project for EDA consideration; and,
WHEREAS,the City and Chamber staff are currently working on the application,including
a Preliminary Engineering Report, to be submitted for EDA review and consideration; and,
WHEREAS, the grant application will be in the amount of$3,500,000 from EDA; and,
WHEREAS, in order to complete the application and submit it for consideration in June
2020,City Council is being asked to designate Tracy Warner,Municipal Engineer,as the Authorized
Representative to sign the grant application; and,
WHEREAS, if the grant is awarded, a Funding Agreement will come back to the City
Council for authorization and funds would likely become available after October 2020;
WHEREAS, if federal funds for this project are received, additional requirements for
prevailing wages and reporting will apply; therefore, bids received may be higher due to these
requirements.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that the designation of Tracy Warner, Municipal Engineer, as the applicant's Authorized
Representative for the Prairie View Industrial Center Utility Extension project,is hereby approved.
ADOPTED THIS 9`'day of June, 2020.
ᅵuxa&
Diane R. Voss, City Clerk John A. Haila, Mayor
Introduced by: Betcher
Seconded by: Corrieri
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 9t'day of June, 2020.