HomeMy WebLinkAbout~Master - Approving Change Order No. 4 for 2017/18 Water System Improvements - Water Service Transfers (10th Street and 12th Street) RESOLUTION NO. 20-275 RESOLUTION APPROVING CHANGE ORDER NO. 4 ON CONTRACT WITH AMES TRENCHING& EXCAVATING FOR 2017/18 WATER SYSTEM IMPROVEMENTS -WATER SERVICE TRANSFERS (LOTH STREET AND 12TH STREET) FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No.4 in the amount of$119,950,on contract with Ames Trenching&Excavating of Ames,Iowa,for the 2017 Water System Improvements-Water Service Transfers(10'Street and 12`' Street)be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 26`'' day of May, 2020. Diane R. Voss, City Clerk John A. Haila, Mayor Introduced by: Gartin Seconded by: Beatty-Hansen Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 26t'day of May, 2020. CITY OF AMES PUBLIC WORKS — ENGINEERING DIVISION Date 4-May120 Af` " °F CONTRACT CHANGE ORDER# 4 P O# 57169 �; A m le ACCT# 510-8461-489.75-14 PROJECT: 2017-18 Water System Program Service Transfer (10th 8r 12th Street, Gray Ave, Cessena St) CONTRACTOR CHANGE ORDERS APPROVED TO DATE. 1 $7,095.18 11 PREVIOUS APPROVED 1509 E. Lincoln Way---------------------- ---- 2 12 CHANGE ORDERS ------------------------- (Name) 3 $4.978,49 13 $12,073.67 Ames. IA 50010 4 14 CRIGINAL CONTRACT ------------------------------(Addressj----------------------------- 5 15 $320,456.00 6 16 CURRENTADJUSTMENT ---------------------------icily State Zips-------------------------- 7 17 $119,950.00 8 18 CUMULATIVE CHANGE -------------------------------------------------------------------- 9 19 ORDER AMOUNT 10 20 $132,023.67 Requires City Council Approval ADJUSTED CONTRACT $452.479,67 The contract is hereby modified and amended as follows: ITEM I DESCRIPTION UNIT PRICE QUANTITY TOTAL Add 6.0 Loads of Rock EA $400.00 4.00 $1.600.00 5 19 Water Service Stub. Copper, 1" dia.. Type 'A' ea $6.000.00 7.00 $42,000.00 5.20 Water Service Stub, Copper. 1" dia., Type 'B' ea $5,000.00 2.00 $10,000.00 5.21 Water Service Stub, Copper. 1" dia., Type 'C' ea $4,500.00 5.00 $22,500.00 7.1 Pavement. PCC. 7" Depth s $60.00 425.00 $25,500.00 7.2 Pavement Removal s $30.00 425.00 $12.750.00 5.7 Water Main. Trenchless. DIP. 8" dia. If $300 00 56.00 $16.800.00 Remove 5.3 Water Main. Trenched. PVC. 8" dia. If $200.00 56.00) ($11.200.00) It is mutually agreed that the contract price is increased/decreased by. Total: $119,950.00 payable/deductible immediately upon completion of the work called for in this order. As a result of this change order. the time for completion of the above-mentioned contract is hereby extended by an additional 0 days. This change order is incorporated into and governed by the above mentioned contract. Accepted for Contra r Recommended for Approval by the City of Ames: �G - J ontractor/Owner Date Municipal ngineer Date For the City of Ames: blic Works Director' Date City Manager Date ue Page 1 of 1 CC Project Engineer, PW Mgmt. Asst.. Finance, Contractor 5126120201217 PM