HomeMy WebLinkAbout~Master - Approving Alternative Bike Routes for the 2019/20 Arterial Street Pavement Improvments (13th Street from Wilson Avenue to Duff Avenue) RESOLUTION NO. 20-248
RESOLUTION APPROVING ALTERNATIVE BIKE ROUTES FOR THE
2019/20 ARTERIAL STREET PAVEMENT IMPROVEMENTS
(13TH STREET FROM WILSON AVENUE TO DUFF AVENUE)
FOR THE CITY OF AMES,IOWA
WHEREAS, this annual program utilizes current repair and reconstruction techniques to
improve arterial streets with asphalt or concrete; and,
WHEREAS, these pavement improvements are needed to restore structural integrity,
serviceability, and readability; and,
WHEREAS, targeted streets are reaching a point of accelerated deterioration and by
improving these streets prior to excessive problems, the service life will be extended; and,
WHEREAS,the location of this project is 13'Street from Wilson Avenue to Duff Avenue;
and,
WHEREAS,this project was originally programmed to consider on-street bike facilities and
following the guidance in the Complete Streets Plan(CSP), vehicle volumes and speeds make on-
street bike facilities incompatible with this section of 13th Street; and,
WHEREAS, in these types of settings, the CSP recommends that alternate parallel routes
should be utilized; and,
WHEREAS, 16t' Street from Northwestern Avenue to Meadowlane Avenue have been
identified in the Long-Range Transportation Plan, serving as a parallel route to the north of 13th
Street,and 9t'Street from Northwestern Avenue to Maxwell Avenue serves as a parallel route to the
south of 13t' Street; and,
WHEREAS, thus, signing both 16th Street and 9th Street as shared streets will be included
with the project, and signage along Northwestern Avenue, Meadowlane Avenue, and Maxwell
Avenue to connect these parallel routes to 13th Street would also be included; and,
WHEREAS, staff met with representatives from the Ames Bicycle Coalition (ABC) to
discuss the project and the potential alternative parallel routes, and overall ABC is understanding
and supportive of the need to designate parallel routes in this case and highlights the need for good
signage to connect the 9th Street and 16th Street routes.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that the aforementioned alternative bike routes for the 2019/20 Arterial Street Pavement
Improvements Program (13th Street from Wilson Avenue to Duff Avenue) are hereby approved.
ADOPTED THIS 12`'day of May, 2020.
Diane R. Voss, City Clerk John A. Haila, Mayor
Introduced by: Gartin
Seconded by: Betcher
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 12t'day of May, 2020.