Loading...
HomeMy WebLinkAbout~Master - Approving Change Order No. 1 on Contract with Henkel Construction for the Brookside Park Restroom Renovation Project RESOLUTION NO. 20-173 RESOLUTION APPROVING CHANGE ORDER NO. 1 ON CONTRACT WITH HENKEL CONSTRUCTION FOR THE BROOKSIDE PARK RESTROOM RENOVATION PROJECT FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 1 in the amount of($50,000),on contract with Henkel Construction of Ames, Iowa, for the Brookside Park Restroom Renovation Project be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 14`h day of April, 2020. Diane R. Voss, City Clerk John A. Haila, Mayor Introduced by: Betcher Seconded by: Corrieri Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 14'h day of April, 2020. HEHEd PCO #001 V wfwin9 7rurt for Over A Cent"T Mason Qty,IA Ames,IA Project: 1968A-Brookside Park Restroom Renov 1325 6th St. Ames,Iowa 50010 Prime Contract Potential Change Order #001 : CE #001 - Value Engineering Deduct TO: City of Ames FROM: Henkel Construction Company 515 Clark Ave 208 East State St Ames Iowa,50010 Mason City Iowa,50401 PCO NUMBER/REVISION: 001 /0 CONTRACT: 1 -Brookside Park Restroom Renov Prime _ Contract REQUEST RECEIVED FROM: CREATED BY: Nick Sieck (Henkel Construction Company) STATUS: Pending-In Review CREATED DATE: 3/24/2020 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING Amount Based METHOD: SCHEDULE IMPACT: PAID IN FULL: No TOTAL AMOUNT. ($50,000.00) POTENTIAL CHANGE ORDER TITLE: CE#001 -Value Engineering Deduct CHANGE REASON:A POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#001 -Value Engineering Deduct Value Engineering Earth Formed Footings in Lieu of Formed Spread Footings and Walls. Deduct of$10,000 Normal Hollow Metal Frame and Doors in Lieu of FEMA Flood Proof Doors Deduct of$40,000 ATTACHMENTS: Approved By: Name: Date: page 1 of 1 Printed On:3/24/2020 01 :39 PM