RESOLUTION APPROVING ADDENDUM NO. 1 TO THE PROFESSIONAL SERVICE
AGREEMENT WITH BOLTON & MENK,INC. REGARDING THE AIRPORT
ELECTRICAL VAULT AND LIGHTING PROJECT
FOR THE CITY OF AMES,IOWA
WHEREAS, on February 11, 2020, the City Council approved a Professional Services
Agreement with Bolton & Menk, Inc., of Ames, Iowa, for the design and construction
observation/inspection for relocation of the electrical vault at the Ames Airport from the old terminal
building to a stand-alone, above ground, outside vault; and,
WHEREAS, the vault design contract was in an amount not-to-exceed $64,000; and,
WHEREAS,the selection of Bolton&Menk as the airport consultant including utilizing their
services for the next five-year Airport Improvements Program projects; and,
WHEREAS, since February, the consultant, City staff, and the Federal Aviation
Administration (FAA) have been working on the design of the electrical vault; and,
WHEREAS, the FAA recently informed the City and the consultant of the availability of
additional Federal Grant funding(90%Federal, 10% Local share); and,
WHEREAS,the additional funding would allow the City of Ames to get an early start on the
design of the planned replacement of runway and taxiway lighting(programmed in the 2020-2025
CIP); and,
WHEREAS, most of the airfield lighting at the Airport was initially built in the late 1970s
and early 1980s, and over the last two years have seen a significant decrease in reliability and
increase in maintenance costs due to the age of the infrastructure; and,
WHEREAS, in order to take advantage of this additional funding, Bolton & Menk would
conduct additional design work (all eligible under the existing grant) and include the additional
replacement of airfield lighting as bid-alternate in the original electrical vault plans; and,
WHEREAS, the FAA's suggested target for additional funds is estimated to be around
$300,000; and,
WHEREAS, the additional design and construction observation/inspection for the airfield
lighting is part of Addendum No. 1 in the amount not-to-exceed$46,200(Federal share=$41,580,
Local share = $4,620) with the Local share for Airport projects coming from the Airport
Construction Fund; and,
WHEREAS,with the current balance of the Airport Construction Fund being$131,823,there
are sufficient funds to cover the required local share of$74,380 for the vault relocation and the
runway lighting project; and,
WHEREAS, all Professional Services for FAA grants are required to use Federally audited
hourly rates, including any overhead and direct expenses, to ensure Local jurisdictions are getting
quality work at fair-market pricing.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that the Addendum No. 1 to the Professional Service Agreement with Bolten&Menk,Inc.,of Ames,
Iowa in the amount of$46,200 is hereby approved.
ADOPTED THIS 14'h day of April, 2020.
Diane R. Voss, City Clerk John A. Haila, Mayor
Introduced by: Betcher
Seconded by: Corrieri
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 14th day of April, 2020.