HomeMy WebLinkAbout~Master - Approving Pole Attachment Agreement with Verizon Wireless RESOLUTION NO. 20-081
RESOLUTION APPROVING SMALL CELL WIRELESS POLE ATTACHMENT
AGREEMENT WITH VERIZON WIRELESS
FOR THE CITY OF AMES,IOWA
WHEREAS,Verizon Wireless(VAW)LLC d/b/a Verizon Wireless of Basking Ridge,New
Jersey is a wireless carrier that is requesting to install, maintain, and operate wireless
communications equipment on City utility poles; and,
WHEREAS, the equipment is known as "small cells," and siting of small cell wireless
facilities on utility poles within the public rights-of-way is regulated by a recently enacted Iowa State
Law(now incorporated into Chapter 8C of the Iowa Cell Siting Act) which gives wireless carriers
certain privileges to site small cell wireless within City rights-of-way and on City structures; and,
WHEREAS, the City's Electric Utility maintains several thousand distribution and
transmission poles,and otherutilities and telecommunication providers routinely attach their cabling
to these City-owned poles to deploy their infrastructure throughout the City; and,
WHEREAS, Verizon has indicated it would initially like to install six small cell wireless
installations on Electric Services street light poles with future plans to expand that to an unknown
quantity; and,
WHEREAS, Verizon is primarily interested in siting these near large student and event
populations (in the vicinity of ISU housing or the stadium, for example)as well as in the proximity
to the Ames Middle School on Mortensen Road; and,
WHEREAS, Other wireless companies have also expressed an interest in the same type of
small cell wireless installations,and with the expansion of 5G wireless networks this will likely drive
the expansion of small cell wireless installation on poles; and,
WHEREAS, it is the preference of the wireless providers to utilize existing pole locations
owned by Electric Services in lieu of City-owned structures, as there are more sites to choose from
in the right-of-ways and these sites also need electric power; and,
WHEREAS, the Pole Attachment Agreement provides that during the initial network
buildout,Verizon will have professional engineers licensed in the State of Iowa perform the design
for the attachment applications,and due to the low volume of these applications,it is anticipated that
the applications will be reviewed by Electric Engineering staff; and,
WHEREAS,provisions exist for the Utility to require Verizon to remove its attachments in
the event that the City re-routes poles, or converts overhead infrastructure to underground; and,
WHEREAS, if the City receives complaints from the public regarding the condition of
Verizon's wireless communications equipment on the poles,Verizon must make repairs within ten
days or provide information to the City regarding when the repairs are to be made; and,
WHEREAS, in exchange for attaching to the City's Electric poles, Verizon will pay the
utility attachment fees as provided in the Agreement(and to be included in the Municipal Code)for
small cell wireless pole attachments; and,
WHEREAS,the fee is currently$150 per pole,per year,and the Agreement also states that
the fee can be modified annually.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that the Small Cell Wireless Pole Attachment Agreement with Verizon Wireless LLC d/b/a Verizon
Wireless, Basking Ridge, New Jersey from January 1, 2020, until December 31, 2025, is hereby
approved.
ADOPTED THIS 25`''day of February, 2020.
Diane R. Voss, City Clerk John A. Haila, Mayor
Introduced by: Beatty-Hansen
Seconded by: Corrieri
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin,
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 25t'day of February, 2020.