HomeMy WebLinkAboutA003 - Certificate of Treasurer of Story County, dated November 5, 2019 Prepared by:Nathan Barber,Esq.,666 Walnut Street,Suite 2000,Des Moines,YA 50309-3989,515-243-7100
CERTIFICATE OF TREASURER OF STORY COUNTY, IOWA
STATE OF IOWA )
) SS.
COUNTY OF STORY )
RE: Parcel Numbers: 09-22-150-001, 09-22-100-240, and 09-22-100-002
I, l l'�II.C�SQf1 Treasurer of Story County, Iowa, having
examined the records of my office, in accordance with the provisions of Iowa Code Section
354.11(f) (2017) pertaining to real property described on Exhibit A attached hereto to be
hereinafter designated as Iowa State University Research Park Phase III Fourth Addition,
do hereby certify that the same is free from all certified taxes and all certified special
assessments so far as the records of the Story County Treasurer, Story County,Iowa reveal.
V-
Dated at Nevada, Iowa this 5- day of l✓ , 2019.
Y
COUNT A URER
By
Q -
Treasurer -
Subscribed and sworn to before me this f day of
C
2019. .
I DY BRIMEYER y
iCommission Number 790908
My Commission Expires Notary P blic in and for the State of
/OWPI Jul G,
Iowa
My Commission Expires ? Q(�a
(Seal)
EXHIBIT A
Legal Description
Outlot X, Iowa State University Research Park Phase III Third Addition in Ames, Story County,
Iowa, except Parcel "A" of all of Lot 5, Iowa State University Research Park Phase III, First
Addition, Ames, Story County, Iowa, and a part of Outlot X, Iowa State University Research
Park Phase III Third Addition in Ames, Story County, Iowa, as shown on the Plat of Survey
recorded on August 16, 2018, as Inst. No. 18-07630, Slide 613, Page 5, AND Commencing at a
point on the East line of the Northwest Quarter (NW'/4) of Section Twenty-two (22), Township
Eighty-three (83) North, Range Twenty four (24) West of the 5th P.M., Ames, Story County,
Iowa 241.45 feet South of the N'/4 Corner of said Sec. 22, thence S89°55'30"W 412.0 feet,
thence South 272.0 feet, thence N89°55'30"E, 412.0 feet to the East line of said NW'/4, thence
North 272.0 feet along said East line to the point of beginning, containing 2.57 acres; ALL
TOGETHER containing 100.13 acres which includes 2.21 acres of existing public right of way
(3395608.2)