Loading...
HomeMy WebLinkAboutA002 - Agreement for Public Improvements dated April 29, 2019, Instrument No. 2019-06218 �o o� o 4 c �� Instrument q: 2019-06218 F 5 07/19/2019 03:01:44 PM Total Pages: 4 �n 00 OTHER Recording Fee: $ 22.00 e He ridg w ,IIIcounty Iowa 1111,■rorder, Story �I�rAllcVI 11■ WAIM IN II A�I� y N k+ INSTRUMENT PREPARED BY: Brian D.Torresi,2605 Northridge Pkwy.,Ames,IA 50010 (515)288-2500 RETURN To: Brian D.Torresi,2605 Northridge Pkwy.,Ames,IA 50010 AGREEMENT FOR PUBLIC IMPROVEMENTS The parties to this Agreement for Public Improvements are HUNZIKER DEVELOPMENT GROUP, LLC (the"Owner") and the CITY OF AMES, IOWA (the "City"). WHEREAS, the Owner is in the process of platting real estate to be known as SCENIC VALLEY SUBDIVISION FOURTH ADDITION, AMES, STORY COUNTY, IOWA; and WHEREAS,the Owner is required to construct certain improvements and utilities within the real estate, to-wit: erosion control (COSESCO), street lights, street trees, sanitary sewer and manhole, pavement, sidewalks, storm sewer, subgrade preparation,pavement, and street widening (collectively,the"Improvements")(a breakdown of the estimated cost of completion of each of the Improvements is attached hereto as Exhibit A and incorporated herein by this reference as if fully set forth). NOW, THEREFORE, in consideration of the premises, it is hereby agreed that the Owner shall deposit with the City a surety bond,letter of credit,or certified check in the amount of SEVEN HUNDRED FORTY THOUSAND THREE HUNDRED SEVENTY DOLLARS and 35/100 ($740,370.35)conditioned upon the completion of the Improvements as required by the City for said subdivision on or before the /day of ryt , 20/�` IT IS FURTHER AGREED that City reserves the right to construct said Improvements in the event Owner fails to do so as herein agreed, and to cover the costs thereof with the letter of credit. IT IS FURTHER AGREED that upon satisfactory completion of the said Improvements, including the paying of reasonable engineering and inspection fees therefore,the letter of credit shall be released. Dated this `I= day of April, 2019. (SIGNATURE PAGE FOLLOWS) ��t SIGNATURE PAGE OF AGREEMENT FOR PUBLIC IMPROVEMENTS HUNZIKER DEVELOPMENT GROUP, LLC B • e Justin . Dodge, Manager By: '� � 6 1�L,Z4 Charles E. Winkleblack, Manager STATE OF IOWA, STORY COUNTY, SS: This record was acknowledged before me on this',,�1'day of April,2019,by Justin R.Dodge and Charles E. Winkleblack, as Managers of Hunziker Development G bup, LLC. o� �8 JENNIFER KAPAUN . Commission Number 783061 Notary bl' in and for the State f Iowa My Com i1J.1ssio its My commission expires �l vLl C fP CITY OF AMES, IOWA By: J n Joiner Director of Public Works 3 Scenic Valley 4th Addition (Manatt s&Ames Trenching) Item Quantity Unit Unit Price Totals Subgrade Preparation, 12" 7,025 SY $2.55 $17,913.75 PCC Curb&Gutter, 30" 3,805 LF $15.60 $59,358.00 Pavement, HMA Base, 6" 51122 SY $23.75 $121,647.50 Pavement, HMA Surface, 2" 51122 SY $10.25 $52,500.50 Manhole Adjustments 9 EA $1,600.00 $14,400.00 Water Valve Adjustments 6 EA $180.00 $1,080.00 PCC Sidewalk,4" 1,775 SY $40.00 $71,000.00 PCC Sidewalk, 6" 78 SY $65.00 $5,070.00 Detectable Warning Panels 174 rLF $25.00 $4,350.00 Storm Sewer,Trenched, RCP, 15" 1,038 $37.00 $38,406.00 Storm Sewer,Trenched, RCP, 18" 333 $38.00 $12,654.00 Storm Sewer,Trenched, RCP, 24" 530 $46.00 $24,380.00 Storm Sewer,Trenched, Concrete Arch Pipe, 18" x 28.5" 281 LF $50.00 $14,050.00 Pipe Apron, RCP, 15" 3 EA $2,100.00 $6,300.00 Pipe Apron, RCP, 18" 1 EA $2,400.00 $2,400.00 Pipe Apron, RCP, 24" 3 EA $2,900.00 $8,700.00 Subdrain, Perforated HDPE, 6" 342 LF $17.00 $5,814.00 Subdrain Cleanout, PVC Riser, 6" 2 EA $400.00 $800.00 Subdrain Outlet,CMP, 8" 2 EA $500.00 $1,000.00 Manhole, SW-301,48", (Storm) 2 EA $3,100.00 $6,200.00 Manhole, SW-301, 60", (Storm) 1 EA $4,900.00 $4,900.00 Intake, SW-501 9 EA $2,500.00 $22,500.00 Intake, SW-503 1 EA $3,900.00 $3,900.00 Intake, SW-505 6 EA $3,900.00 $23,400.00 Intake, SW-506 3 EA $5,800.00 $17,400.00 COSESCO(erosion control) 15.85 AC $500.00 $7,925.00 Street Lights 1 LS $40,000.00 $40,000.00 Street Trees 80 1 EA 1 $300.00 1 $24,000.00 4th Addition Improvements TOTAL: $612,048.75 Scenic Valley 4th Addition-GW Carver Widening (Construct) Item Quantity Unit Unit Price Totals Subgrade Preparation, 12" 2,032 SY $2.20 $4,470.40 Modified Subbase, 6" 2,032 SY $9.60 $19,507.20 Granular Shoulder, 6" 214 TON $33.00 $7,062.00 PCC Pavement,8" 1,736 SY $54.50 $94,612.00 Painted Pavement Markings,Waterborne or Solvent Based 48 STA $40.00 $1,920.00 Painted Symbols and Legends 3 EA $250.00 $750.00 GW Carver Widening TOTAL: $128,321.60 Scenic Valley 4th Addition GRAND TOTAL: $740,370.35 EXHIBIT d