Loading...
HomeMy WebLinkAboutA011 - Agreement for Public Improvements dated July 3, 2018 J Instrument N: 2018-06237 07/12/2018 10:18:29 AM Total Pages: 3 00 OTHER Recording Fee: $ 17.00 Stacie Herridge, Recorder, Story County Iowa Retum to: Ames City Clerk Box 811 Ames, IA 50010 DO NOT WRITE IN THE SPACE ABOVE THIS LINE,RESERVED FOR RECORDER Prepared by:Nathan Easter,ISU Research Park;1805 Collaboration Place,Suite 1250;Ames,IA 50010 AGREEMENT FOR PUBLIC IMPROVEMENTS The parties to this Agreement, made pursuant to Section 23.304, Ames Municipal Code, are IOWA STATE UNIVERSITY RESEARCH PARK, hereinafter referred to as "Owners", and the CITY OF AMES, IOWA,hereinafter referred to as "City ". WHEREAS, the Owners are in the process of platting a subdivision of real estate to be known as IOWA STATE UNIVERSITY RESEARCH PARK PHASE III, THIRD ADDITION, Ames, Story County, Iowa; and WHEREAS, the Owners are required to construct certain improvements and utilities within the real estate, to wit: Earthwork, Sewers and Drains, Water Main and Appurtenances, Sanitary Sewer, Storm Sewer, and Streets; ALL as associated with Lot 1 of Iowa State University Research Park Phase III Third Addition, by not later than November 30, 2021, and, to pay reasonable engineering and inspection fees therefor, all as part of the platting procedure of the City. A copy of said list of improvements is attached to and itemization is made a part of this Agreement as Exhibit 'A'. NOW, THEREFORE, in consideration of the premises, it is hereby agreed that the Owners shall deposit with the City a surety bond, letter of credit or certified check in the amount of$1,233,630.67 conditioned upon the completion of the said improvements and utilities, by the said date, as required by the City for said Subdivision, in accordance with plans and specifications on file with the City' s engineers and by this reference made a part of this agreement. IT IS FURTHER AGREED that City reserves the right to construct said improvements and utilities in the event Owners fail to do so as herein agreed, and to cover the costs thereof with the surety bond, letter of credit or the certified check, as the case may be. IT IS FURTHER AGREED that upon satisfactory completion of the said improvements and utilities, including the paying of reasonable engineering and inspection fees therefor,the bond shall be released-and-the bondsman_exonexated,_theletter-nf credit released-ar-the-certified-cheek shall be returned to Owners,�the case may be DATED this �.3" day o [Signature Page Follows] OWNER Iowa State University Research Park By. Steven . Carter, Pr i ent STATE OF IOWA, STORY COUNTY This record was acknowledged before me on 1.3, 2018 by Steven T. Carter, as President of Iowa State University Research Park. Notary kblic in and for said State and County My Commission Expires (Seal) t, PATSY DUNCAN l: CommWeion Number 193%1 My Commission Expires ember 16, 2018 CITY OF AMES, IOWA By: - d Dire or of Public Woyls z - Y ft =` ' ' ENGINEER'S ESTIMATE EXHIBIT A ISU RESEARCH PARK PHASE IV PUBLIC WORKS DEPT.-ENGINEERING DIV. CITY OFAMES,IA Rev 06/05/2018 S RIVERSIDE Unit Est Item# Item Code Description Unit Price Quant Amount Division 1-General (Not Used) Division 2-Earthwork 2.1 2010-108-D-2 Topsoil,8"Depth cy $8.00 2,150.00 $17,200.00 2.2 2010-108-E-0 Excavation,Class 10,15"Depth cy $12.00 5,000.00 $60,000.00 2.3 2010-108-G-0 Subgrade Preparation,12"Depth sy $3.00 5,989.00 $17,967.00 2.5 2010-108-1-0 Modified Subbase,6"Depth sy $8.00 5,989.00 $47,912.00 2.6 2010-108-L-0 Compaction Testing Is $10,000.00 0.82 $8,200.00 2.7 Exploratory Digging Is $5,000.00 0.82 $4,100.00 208 Rip Rap ton $50.00 0.00 $0.00 Division 3-Trench,Backfill and Tunneling 3.1 3010-108-C-0 Trench Foundation tan $25.00 100.00 $2,500.00 3.2 3010-108-D-0 Replacement of Unsuitable Backfill Material cy $25.00 100.00 $2,500.00 3.3 3010-108-F-0 Trench Compaction Testing Is $10,000.00 0.82 $8,200.00 Division 4-Sewers and Drains 4.1 4010-108-A-1 Sanitary Sewer Gravity Main,Trenched,PVC,12"dia. If $87.00 0.00 $0.00 4.2 4010-108-A-1 Sanitary Sewer Gravity Main,Trenched,PVC,8"dia. If $80.00 0.00 $0.00 4.3 4010-108-A-1 Storm Sewer Trenched,RCP,48"dia. If $180.00 354.00 $63.720.00 4.4 4020-108-A-1 Storm Sewer,Trenched,RCP,24"dia. If $90.00 673.00 $60,570.00 4.5 4020-108-A-1 Storm Sewer,Trenched,RCP,18"dia. If $80.00 375.00 $30,000.00 4.6 4020-108-A-1 Storm Sewer Trenched,RCP,15"dia. If $75.00 468.00 $35,100.00 4.7 4040-108-A-0 Subdrain,Longitudinal,PVC,6"dia. If $20.00 1,660.00 $33.200.00 A.8 4040-108-B-0 Subdrain,Cleanout,8"dia. ea $850.00 6.00 $5,100.00 4.9 4040-108-E-0 Pipe Apron,48"dia. ea $5,500.00 4.00 $22,000.00 4.10 4040-108-E-0 Pipe Apron,24"dia. ea $3,000.00 1.00 $3.000.00 4.11 4040-108-E-0 Pipe Apron,18"dia. ea $2,500.00 2.00 $5.000.00 4.12 4040-108-E-0 Pipe Apron,15"dia. ea $1,100.00 0.00 $0.00 4.13 4050-108-C-2 Field Tile Repair,under 12"dia. If $100.00 100.00 $10,000.00 Division 5-Water Mains and Appurtenances 5.1 5010-108-A-1 Water Main,Trenched,PVC,12"dia. If $75.00 805.00 $60,376.00 5.2 5010-108-A-1 Water Main,Trenched,PVC,8"dia. If $65.00 70.00 $4,550.00 5.3 5010-108-C-1 12"x6"x12"Tee ea $500.00 3.00 $1,500.00 Valve,Gate,8"dia. ea $1.500.00 1.00 $1.500.00 5.4 5020-108-A-0 Valve,Gate,12"dia. ea $2,000.00 3.00 $6,000.00 6.5 5020-108-B-0 12"x&)(12"Tee ea $750.00 1.00 $750.00 5.6 5020-108-C-0 Fire Hydrant Assembly,6"barrel ea $5,500.00 1.00 $5,500.00 5.7 Water Main Connection ea $3,500.00 1.00 $3,500.00 Division 6-Structures for Sanitary and Storm Sewer 6.1 6010-108-A-0 Manhole Type SW-301,48"dia. ea $5,000.00 0.00 $0.00 6.2 6010-108-B-0 Intake Type SW-507 ea $5,000.00 6.00 $30,000.00 6.3 6010-108-B-0 Intake Type SW-509 ea $6,000.00 6.00 $36,000.00 Division 7-Streets and Related Work 7.1 7010-108-A-0 Pavement,PCC,9"Depth sy $65.00 5,304.00 $344,760.00 7.2 7010-108-1-0 PCC Pavement Samples&Testing Is $5,000.00 1.00 $5,000.00 7.3 7030-108-C-0 Shared Use Path,PCC,5"depth,10'width sy $50.00 2,538.00 $126,900.00 7.4 7030-108-G-0 Detectable Warning sf $40.00 40.00 $1,600.00 Division 8-Traffic Control 8.1 8020-108-B-0 Pavement Markings and Symbols,Tape Is $10,000.00 1.00 $10.000.00 8.2 8030-108-A-0 Temporary Traffic Control Is $10,000.00 0.17 $1,666.67 8.3 Street signage Is $5,000.00 1.00 $5,000.00 8.4 Light Pole ea $4.500.00 8.00 $36,000.00 8.5 Electrical Is Division 9-Sitework and Landscaping 9.1 9010-108-B-0 Hydraulic Seeding,Type 1 Seeding ac $5,000.00 2.00 $10,000.00 9.2 9040-108-F-1 Filter Sock If $3.00 1,500.00 $4,600.00 9.3 Intake Protection ea $100.00 16.00 $1,600.00 Division 10-Demolition (Not Used) Division 11-Miscellaneous 11.1 11010-108-A Construction Survey/Staking Is $28.000.00 0.82 $22,960.00 11.2 11010-108-B Pedestrian Facility Construction Survey&Staking Is $500.00 1.00 $500.00 11.3 11020-108-A Mobilization Is $75,000.00 '11.4 11060-108-A Concrete Washout Is $2,000.00 1.00 $2,000.00 11.5 Relocation of Mailbox ea $100.00 2.00 $200.00 SUBTOTAL $1,233,630.67 ENGINEERING(20%) CONTINGENCY(10%) TOTAL $1,233,630.67