HomeMy WebLinkAboutA008 - Council Action Form dated April 11, 2017 ITEM # 39
DATE: 4-11-17
COUNCIL ACTION FORM
SUBJECT: MAJOR FINAL PLAT FOR ASPEN BUSINESS PARK SUBDIVISION
THIRD ADDITION
BACKGROUND:
....Tailwind 1854 Madison, LLC, representing the owners of 516 S. 17th Street, is
requesting approval of a major final plat for Aspen Business Park Subdivision 3rd
Addition. The Aspen Business Park Subdivision 3rd Addition lies north of Highway 30
and south of S. 16th Street (see Attachment A — Location Map).
A preliminary plat for the Aspen Business Park Subdivision 3rd Addition was approved in
August of 2016. The approved preliminary plat consisted of four buildable lots, one
outlot for storm water management, and extension of S. 17th Street through the
subdivision. The preliminary plat was found to conform to both RH zoning standards
and the terms of the contract rezoning agreement.
The proposed final plat establishes two buildable lots, one outlot for storm water
management, and extension of S. 17th Street through the Aspen Business Park
Subdivision 3"d Addition. The proposed subdivision includes a reservation of right-of-
way along the west property line and the creation of utility easements. Although the
number of lots has been reduced, the proposed final plat is in substantial conformance
with the preliminary plat and can be approved as a minor amendment per the criteria of
Section 23.306. Development of the proposed two lots is intended for multiple-family
development consisting of ten apartment buildings split between the two lots and a
clubhouse. The outlot will be used for stormwater management.
There is an existing City access easement along the west property line that will need to
be to be vacated prior to development of the site. A separate hearing for the vacation of
the easement will be scheduled subsequent to the final plat approval.
Public improvements, including streets, sidewalks, sanitary sewer, water, storm sewer
system, street lights, trails, sub-drains and seeding for storm water detention basins, are
required as part of this major subdivision. New sewer and water connections will be
installed. A public improvement agreement in the amount of $595,633.94 has been
submitted with a letter of credit. The developer has also signed a sidewalk and street
tree deferral agreement for the installation of sidewalks.
Public Works staff has reviewed a submitted Storm Water Management Plan for this
subdivision and has determined that the development will comply with all applicable
stormwater requirements.
1
The proposed plat conforms to requirements of the contract rezoning agreement for the
extension of S. 17t" Street and the reservation of area for future right-of-way within the
southwest corner of the site to allow for the future extension of South Grand Avenue. A
deed restriction accompanies the plat for the right-of-way reservation area.
ALTERNATIVES:
1. The City Council can approve the Final Plat of Aspen Business Park Subdivision 3rd
Addition based upon the staff's findings that the Final Plat conforms to relevant and
applicable design standards, ordinances, policies, plans and previously approved
Development Agreement.
2. The City Council can deny the Final Plat for Aspen Business Park Subdivision 3rd
Addition, if it finds that the development creates a burden on existing public
improvements or creates a need for new public improvements that have not yet
been installed.
3. The City Council can refer this request back to staff or the applicant for additional
information.
CITY MANAGER'S RECOMMENDED ACTION:
Staff has evaluated the proposed final subdivision plat and determined that the proposal
is consistent with the preliminary plat and that the final plat conforms to the adopted
ordinances and policies of the City as required by Chapter 23 of the Municipal Code.
The proposed changes in lots are consistent with a minor amendment. The final plat is
also consistent with the requirements of the contract rezoning agreement.
Therefore, it is the recommendation of the City Manager that the City Council accept
Alternative #1, thereby approving the final plat for Aspen Business Park Subdivision 3 d
Addition.
2
Attachment A-Location Map
tl'-Rt�i2bteMs�
�Ji i35�„!a7 tc
y i it atF�
iYYS n+a8 t;T'1 b g "` , '�'b}�; i "„,s;•a5r �4�T i .> �, C t
" ��� �..� ,:� � �X � �� � gb�fry ,��,�� �ud � c �• � -� ;
� �, .�^^p„.�..�°^,�.�n^ it' �•aww: ��� . a�� sawc�+rr �yt � 2�;;»' �'� �.
. p ni
mf, eG 7. 9ap $ wr
r r.
- €
wv �� t
W �r., ��� s 'S -. d r v .� ?�a �' ''�t '*�*as.+st �,, Y q � yam, 3 � y► �r=
� 3s; A a°�'e�iY [. t�,� ° �`z : :1.ds •_a+� »��4yE �.:�� � �. N�.
" b, p 2 • a A
d
s c r y aIF, z*01111 Via.
p
Location Ma
619 S 17th Street
3
Attachment B- Aspen Business Park Subdivision 3rd Addition
FINAL PLAT
A5PEN BU51 NE55 PARK SUBD I VI51 ON,
THIRD ADDITION
DESCRIPTION: A SUBDIVISICN OF OUTLDT B. ASPEN BUSINESS PARK SUBDIVISION.
FIRST ADDITION TO THE CITY OF ARM STORY COUNTY. IOWA.
CONTAINING IR.5B ACRES.
OWNER/ TAILWIND 1854 MADISON. LLC
DEVELOPER: MANKATOFRON SST.. STE 100
SURVEYOR: STUHB0o6EA55OCIAAI TE5PLANDISURVEYING
P.O. Box ME
ANTE& IA 500so
535-233-3689
20'eAN1T/31Y-�
SEWEfl EASE.
NTCF10L5 ` I NICHOLS
tiC.AS as9'1'3' 20.09' LD INE55 PARK
ONW UTLOTR BR 5B4'42'40 E 419.97' A''P
1801 VIS]OH. 214D A00t{,
51
8' mo RANOALL
� D• P.U.E. i�o
-
RFC.AS N69.41.34-W 240.00• LO7C6�RBER1_K f
5•P.U.E. —689'42'34'E 239.BB'
LOT i 1
2212B9.82 S.F. :. i•Ci B IIN1E S Tt 4
5.08 ACRES SptVI510rL `T
�n I 535 S. 17TH STREET °� ' CATION nGENCY 1i
Ci DQ API:A EW
a I VC�OS 6F• �
W 11 Q' 1A 5'c� n
Ae�`qg pG�E
$ 1�•1 $'o L———_._._—_.1z —_lS_.P-J:E—
1 =3' LOT A S. 17TH STREET o �'■1'�^'Eea
---- 989..976' E
2�Ts9'30'42'M 660.a2'
S S 3 S 52i 21 ACR S.F. HBO' ROW) $ 70.76
x
�z �.......— —
LOT 5, BLK 1
CC 1
i mw
` � oun.DT A
n; 1W LOT 2 570531 S.F. w�wo �a
m 1.31 ACRES
217073.59 5.F, u o o °1;y a
4.98 ACRES 3 �Ar0
1R ~524 S. 17TH ST.in Mw r„
Goo S. 37TH STREET g1 I o u ,•
tT(•-RIGHT Or WAY Nw1/4. N41/4 N
RESERVATION 1.28 ACRE`3
M11/A, WN1/4
SW CORNER 4.45 ACRES SWf/4. Nwl/4 I SE CORNER
NWS/d, NX1/4 f0'P.U,E D. ACRES 7 — OUTLOi B 1�-
e£C. 14-8344 /
FOUNoNWl/a�^� _.
REBAR - EKIST. 2O' 30' SWl/4. NIT
Ni10'14'R4'E Nu SIO�4 EASEMENT 0.49 ACRES -��- 501'd1'3f'w(91
NOD'32'46'E - .;; `FRB S. 17TH-Si�� --5s8:60` 673,06' S92'38'S6"W
59.17' S85'36A-3a ma.aa 60.40'
98.0 - �......
PEG.A9 ae9.3e 83'N rA.3)'as
SW CORNER-/ 4a.od U.S. HIGHWAY #30
OUTLOT B
NOTES* LEGE
11: Lol A wf 1l be dedicated to the City of Ames far vubllb right of Way. PROPERTY BOUNDARY
2. Outlo! A is (or stormwater management and treatment. -_
3. Soil borings era required Sn areas within this
plat which have been SECTION LINE
identified by the City of Ames as having sol3s that make construction STREET CENTERLINE ----------
of buildings difficult. RIGHT OF WAY LINE ---- -------
EASEMENT LINE ----- —— ——-
BUILDINB SETBACK LINE --------
ZONING DISTRICT: SECTION CORNER FOUND OR SET AS NOTED
RH (RESIDENTIAL HIGH DENSITY) FOUND 1/2' TiEBAR W/YELLOX CAP f6586
Setbacks: FOUND 3/2' REBAR W YELLOW CAP 18336 ■
Front: 25' minimum FOUND IDOT ROW RAIL I
SSdo: B' minimum sin]e story SET 1/2' REBAR W/YELLOW CAP F17161 O
so' Minimum s ettorriea GRAPHIC SCALE 1'=100'
12' minimum 4 star See
4' additional for each story over 4
Rear; 0' min. for single fsmily attacned
25' minimum all other ez. varty wall D 100 200 300
Corner: 2 front yards and 2 side yards
I hereby certify that this land surveying document wag 0revared and t y a+o
the related serve work was erformed by me or under m direct
5TUMW 4G�Att1�5�5/�001ATE5 Earl BUDarV ia�on and that'I am a duly llcaneod Pro esslonal Land
LAND SURVEYING Surveyor antler the Iawa of the State of Iawa. r
�� zo /y 17361
510 5,rrtH sTr413=T,sutTE whoa �" Dete:
AMES,�OINA SCx710 R_ Bradley Stu o License♦17161
PN.51'r233�-%8Q•FAX 515-233-4To3 Ny license re ewa3 date is DetemOar 31. 2D37 �+py4t wp
Jab a12007FP Oate: 3/20/17 Pa e 3 of I
4