Loading...
HomeMy WebLinkAboutA018 - Letter to Mayor and Council dated May 21, 2015, recommending reduction of Letter of Credit to $4,725.00 may;, E Smart Choice Public Works Department 515 Clark Avenue, Ames, Iowa 50010 Phone 515-239-5160 ♦ Fax 515-239-5404 May 21, 2015 Honorable Mayor and Council Members City of Ames Ames, Iowa 50010 Ladies and Gentlemen: I hereby certify that the final utility fixture adjustments and street lighting, required as a condition for approval of the final plat of South Fork, 6tn Addition have been completed in an acceptable manner by Manatts, Inc. of Ames, IA. The above-mentioned improvements have been inspected by the Engineering Division of the Public Works Department of the City of Ames, Iowa and found to meet City specifications and standards. As a result of this certification, it is recommended that the financial security for public improvements on file with the City for this subdivision be set at $4,725.00. The remaining work covered by this financial security includes the installation of a shared use path. Sincerely, �rr John C.Joiner, P.E. Director JJ/jc cc: Finance, Contractor, Construction Supervisor, PW Senior Clerk, Planning & Housing, Subdivision file Public Works Department 515.239.5160 mein 515 Clark Ave.P.O.Box 811 Engineering 515.239.5404 I Ames,IA 50010 www.CityofAmes.org South Fork, 61"Addition (REVISED) May 5, 2015 Page 2 Description Unit Quantity Class 13 Excavation CY 250 Sub-grade Preparation SY 1,725 4" Sanitary Sewer Service, PVC EA 8 Storm Sewer, RCP 15", CL 3 LF 75 Storm Sewer, RCP 18", CL 3 LF 112 Footing Drain Collector, 6" LF 204 Footing Drain Cleanout, 6" EA 2 Footing Drain Outlet and Connection, 6" EA 2 Storm Sewer Service Stub, PVC, 1-1/2" LF 290 Water main,Trenched, PVC, 8" LF 290 Water Service Connection, Curb Stop& Box, 1" EA 8 8"45 Degree Bend EA 2 Fire Hydrant Assembly(includes gate valve, boot, 6" pipe and EA 1 fittings) Intake, SW502 EA 4 Manhole Adjustment, Major EA 1 30" PCC Curb and Gutter LF 790 Pavement, 8" HMA SY 485 Pavement, 9.5" HMA SY 1,060 Pavement Removal SY 10 Seeding,Type 1 Lawn Mix ACRE 1 Silt Fence-Install, Maint. & Removal LF 300 Inlet Protection Device-Install, Maint. & Removal EA 3 Stabilized Construction Entrance EA 1 L:ANs Re: Fw: Pinnacle Property to City of Ames LOC # 0416 Brett Stupp to: John C Joiner 05/21/2015 08:02 AM Cc: Keith Arneson,Justin Clausen,"Joel.Thilges", Diane R Voss Good morning to All - The revised and further reduced LOC is ready to go for the meeting on the 26th. The remaining work covered by this financial security includes the installation of the shared use path. Breakdown is as follows; Previous LOC: $9,525.00 Street Lighting: $4,500.00 - installed Final Utility Adjustments: $300.00 -completed Remaining Amount: $4,725.00 (amount for shared use path installation) I will forward the revised letter to Diane this morning. Any questions don't hesitate to contact me. Respectfully, Brett 4r, Brett M. Stupp Construction Supervisor 515.239.5276 main 1515.203.6118 cell bstupp@city.ames.ia.us I City Hall, 515 Clark Avenue I Ames, IA 50010 www.CityofAmes.org I —Caring People— Quality Programs — Exceptional Service John C Joiner Good morning, Keith! After your email questioni... 05/15/2015 07:31:06 AM From: John C Joiner/COA To: Keith Arneson <keithdarneson@gmail.com> Cc: Justin Clausen <jclausen@city.ames.ia.us>, "Joel.Thilges"<Joel.Thilges@fnbames.com>, Diane R Voss/COA@COA, Brett Stupp/COA@COA Date: 05/1 5/201 5 07:31 AM Subject: Re: Fw: Pinnacle Property to City of Ames LOC#0416 Good morning, Keith! After your email questioning the $9,525, Justin sent an email explaining the items that were covered. Unfortunately, in looking back, it went to"keitharneson@mchsi.com". I see that you've got a "gmail" address now. I'll update my address book; sorry for the mix up! By copy, I've cut and pasted that info at the end of this email. Just as an FYI, we base all our LOC amounts off the estimates and quotes provided to us by the developers' engineers along with the street light estimates from Electric. After the Council Action Form was written for the 6th, the street lights were installed and completed. His note explained that it will be reduced again on the 26th, so hold off on getting Diane a new LOC. Also, we don't require bonding (LOC) for street trees or sidewalks,just bike paths. Sidewalk and trees are covered by separate agreement. This agreement is what evidently lead to the closing being delayed a few weeks ago. Again, I've never heard of that happening and nobody at the City had a hand in the delay. By copy, I'll also ask Brett to get all your LOC's from Diane, review the status and "reply to all". Have a good day! John Justin's 5-12-15 note: Good afternoon Keith: We used the information below to set the value of the LOC: Final Utility Adjustments: $300 (Sanitary Manhole at Cochrane/Bellflower) Street Lighting: $4,500 (Per COA Electric) Shared Use Path: $4,725 (Continuation from the 3rd Addition...in font of lots 1-4 and between lots 4 and 7) TOTAL: $9,525 Per your request I went back and reviewed the items again: The only change I have to make is that the Electric Department is complete with their work and their amount can be released. At this point in time we will follow through with the reduction as noted below. We will draft another release letter for the 6th Addition next week to go on Council Agenda that will eliminate the street lighting amount, thus further reducing to $5,025. If you wouldn't mind waiting until the next meeting (26th)we can restablish the new LOC amount for the bank at$5,025. Justin €µ Pmes John C. Joiner, P.E. Director of Public Works 515.239.5165 desk 1515.239.5404 fax jjoiner@city.ames.ia.us I City Hall, 515 Clark Avenue I Ames, IA 50010 www.CitvofAmes.org ^ Caring People —Quality Programs— Exceptional Service — Keith Arneson John, Could you give me a breakdown for any a... 05/15/2015 06:58:05 AM