HomeMy WebLinkAboutA012 - Resolution No. 14-448 adopted August 12, 2014 RESOLUTION NO. 14448 RESOLUTION ACCEPTING PARTIAL COMPLETION OF PUBLIC IMPROVEMENTS REQUIRED FOR SOUTH FORK SUBDIVISION, 6TH ADDITION FOR THE CITY OF AMES,IOWA BE IT RESOLVED,by the City Council of the City of Ames, Iowa: Section One. In accordance with the Certificate of the Public Works Department, the utilities,base asphalt paving, and curb and gutter construction required as a condition for approval of the Final Plat of the above-named Subdivision have been completed in an acceptable manner. Section Two. The bond given to secure performance of the public improvements is hereby lessened to$23,169.50 for the remaining work that includes asphalt surfacing,street lighting,erosion control, and final utility fixture adjustments. ADOPTED THIS 121h day of August, 2014. C--��? LX,4& AS-W al. coasovAAal Diane R. Voss, City Clerk Ann H. Campbell, Mayor Introduced by: Goodman Seconded by: Betcher Voting aye: Betcher, Corrieri, Gartin, Goodman,Nelson, Orazem Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 126'day of August, 2014. �• A m e s Smart Choice Public Works Department 515 Clark Avenue, Ames, Iowa 50010 Phone 515-239-5160 ♦ Fax 515-239-5404 August 7, 2014 Honorable Mayor and Council Members City of Ames Ames, Iowa 50010 Ladies and Gentlemen: I hereby certify that the utilities, base asphalt paving, and curb and gutter construction required as a condition for approval of the final plat of South Fork, 61h Addition have been completed in an acceptable manner by Ames Trenching & Excavating of Ames, IA and Manatts, Inc. of Ames, IA. The above-mentioned improvements have been inspected by the Engineering Division of the Public Works Department of the City of Ames, Iowa and found to meet City specifications and standards. As a result of this certification, it is recommended that the financial security for public improvements on file with the City for this subdivision be set at $23,169.50. The remaining work covered by this financial security includes the asphalt surfacing, street lighting, installation of a shared use path, and final utility fixture adjustments. Sincerely, John C.Joiner, P.E. Director JJ/jc cc: Finance, Contractor, Construction Supervisor, PW Senior Clerk, Planning & Housing, Subdivision file Public Works Department 515.239.5160 ­;,, 515 Clark Ave.P.O.Box 811 Engineering 515.239.5404 f. Ames,IA 50010 South Fork, 61h Addition (REVISED) August 7, 2014 Page 2 Description Unit Quantity Class 13 Excavation CY 250 Sub-grade Preparation SY 1,725 4"Sanitary Sewer Service, PVC EA 8 Storm Sewer, RCP 15",CL 3 LF 75 Storm Sewer, RCP 18", CL 3 LF 112 Footing Drain Collector, 6" LF 204 Footing Drain Cleanout,6" EA 2 Footing Drain Outlet and Connection, 6" EA 2 Storm Sewer Service Stub, PVC, 1-1/2" LF 290 Water main,Trenched, PVC,8" LF 290 Water Service Connection,Curb Stop & Box, 1" EA 8 8"45 Degree Bend EA 2 Fire Hydrant Assembly(includes gate valve, boot, 6" pipe and EA 1 fittings) Intake, SW502 EA 4 Manhole Adjustment, Major EA 1 30" PCC Curb and Gutter LF 790 Pavement,8" HMA SY 485 Pavement, 9.5" HMA SY 1,060 Pavement Removal SY 10 Seeding,Type 1 Lawn Mix ACRE 1 Silt Fence-Install, Maint. & Removal LF 300 Inlet Protection Device-Install, Maint. & Removal EA 3 Stabilized Construction Entrance EA 1