Loading...
HomeMy WebLinkAboutA021 - Letter to Mayor and Council dated July 2, 2014, recommending reduction of Letter of Credit to $42,194.10 A a A m e S Smart Choice Public Works Department 515 Clark Avenue, Ames, Iowa 50010 Phone 515-239-5160 ♦ Fax 515-239-5404 July 2, 2014 Honorable Mayor and Council Members City of Ames Ames, Iowa 50010 Ladies and Gentlemen: I hereby certify that the utilities, base asphalt paving, and curb and gutter construction required as a condition for approval of the final plat of South Fork, 7`h Addition have been completed in an acceptable manner by Ames Trenching & Excavating of Ames, IA and Manatts, Inc. of Ames, IA. The above-mentioned improvements have been inspected by the Engineering Division of the Public Works Department of the City of Ames, Iowa and found to meet City specifications and standards. As a result of this certification, it is recommended that the financial security for public improvements on file with the City for this subdivision be set at $42,194.10. The remaining work covered by this financial security includes the asphalt surfacing, street lighting, erosion control, pedestrian ramps, and final utility fixture adjustments. Sincerely, John C.Joiner, P.E. Director JJ/jc cc: Finance, Contractor, Construction Supervisor, PW Senior Clerk, Planning & Housing, Subdivision file Public Works Department 515.239.5160 ,,,ar„ 515 Clark Ave.P.O.Box 811 Engineering 515.239.5404 fa.0 Ames,IA 50010 South Fork, 7th Addition July 2, 2014 Page 2 Description Unit Quantity Class 13 Excavation CY 2,000 Sub-grade Preparation SY 2,310 8" Sanitary Sewer Main, PVC LF 156 4" Sanitary Sewer Service, PVC EA 8 Storm Sewer, RCP 15", CL 3 LF 213 Storm Sewer Service Stub, PVC, 1-1/2" EA 8 Water main,Trenched, PVC, 8" LF 116 Water Service Connection, Curb Stop& Box, 1" EA 8 Manhole, SW 301,48" EA 1 Intake, SW 501 EA 1 Intake, SW 503 EA 1 Manhole Adjustment, Major EA 7 Sidewalk, PCC, 6" SY 40 30" PCC Curb and Gutter LF 1,400 Pavement, 8" HMA SY 653 Pavement, 10" HMA SY 1,087 Seeding,Type 1 Lawn Mix ACRE 1 Silt Fence-Install, Maint. & Removal LF 300 Inlet Protection Device-Install, Maint. & Removal EA 3 Stabilized Construction Entrance EA 1 Description Unit Quantity Class 13 Excavation CY 2,050 Sub-grade Preparation SY 1,570 8" Sanitary Sewer Main, PVC LF 304 4" Sanitary Sewer Service, PVC EA 13 Storm Sewer, RCP 15", CL 3 LF 182 Footing Drain Collector, 6" LF 165 Footing Drain Cleanout, 6" EA 1 Footing Drain Outlet and Connection, 6" EA 1 Storm Sewer Service Stub, PVC, 1-1/2" EA 13 Water main,Trenched, PVC, 8" LF 324 Water Service Connection, Curb Stop& Box, 1" EA 13 8"Tee EA 1 Fire Hydrant Assembly(includes gate valve, boot, 6" pipe and EA 1 fittings) Intake, SW501 EA 2 Manhole Adjustment, Major EA 1 Pavement, 6" PCC SY 365 30" PCC Curb and Gutter LF 654 Pavement, 8" HMA SY 945 Pavement Removal SY 134 Seeding,Type 1 Lawn Mix ACRE 1 Inlet Protection Device, Install, Maintain, Remove EA 1 Stabilized Construction Entrance EA 1