HomeMy WebLinkAboutA026 - Resolution No. 14-503 adopted September 23, 2014 f
RESOLUTION NO. 14-503
RESOLUTION ACCEPTING PARTIAL COMPLETION OF
PUBLIC IMPROVEMENTS REQUIRED FOR
SOUTH FORK SUBDIVISION, 3" ADDITION
FOR THE CITY OF AMES, IOWA
BE IT RESOLVED, by the City Council of the City of Ames, Iowa:
e S coon One. In accordance with the Certificate of the Public Works Department,the asphalt
p p
street surfacing required as a condition for approval ofthe Final Plat of the above-named Subdivision
has been completed in an acceptable manner.
Section Two. The bond given to secure performance of the public improvements is hereby
lessened to $3,454 for the remaining work that includes pedestrian sidewalk ramps.
ADOPTED THIS 23 d day of September, 2014.
Diane R. Voss, City Clerk Arm H. Campbell, Mayor
Introduced by: Goodman
Seconded by: Corrieri
Voting aye: Betcher, Corrieri, Gartin, Goodman, Nelson, Orazem
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 23" day of September, 2014.
m1 e s,.
Smart Choice
Public Works Department
515 Clark Avenue, Ames, Iowa 50010
Phone 515-239-5160 ♦ Fax 515-239-5404
20
September 8, 2014
Honorable Mayor and Council Members
City of Ames
Ames, Iowa 50010
Ladies and Gentlemen:
I hereby certify that the asphalt street surfacing required as a condition for approval of the
final plat of South Fork, 3rd Addition has been completed in an acceptable manner by Manatts,
Inc. of Ames, IA. The above-mentioned improvements have been inspected by the
Engineering Division of the Public Works Department of the City of Ames, Iowa and found to
meet City specifications and standards.
As a result of this certification, it is recommended that the financial security for public
improvements on file with the City for this subdivision be reduced to $3,454. The remaining
work covered by this financial security includes pedestrian sidewalk ramps.
Sincerely,
CI
John C.Joiner, P.E.
Director
JJ/jc
cc: Finance, Contractor, Construction Supervisor, PW Senior Clerk, Planning & Housing,
Subdivision file
Public Works Department 515 239.5160 main 515 Clark Ave.P.O.Box 811
Engineering 515.239.5404 (ax Ames,IA 50010
South Fork, 3rd Addition
September 8, 2014
Page 2
Description Unit Quantity
Class 13 Excavation CY 1400
Sub-grade Preparation SY 2520
4"Sanitary Sewer Service (8" or 10" Saddle Connection) EA 8
Storm Sewer,Trenched, 18" LF 152
Storm Sewer,Trenched, 24" LF 114
Footing Drain Collector, 8" LF 345
Footing Drain Cleanout EA 1
Footing Drain Outlet and Connection, 8" EA 3
Storm Sewer Service Stub, PVC, 1-1/2" EA 8
Water main,Trenched, PVC, SDR18, 8" LF 640
Water Service Connection, Curb Stop& Box, 1" EA 8
Gate Valve& Box, 8" EA 2
8" MJ Tee EA 1
Fire Hydrant Assembly EA 1
Remove and Relocate Hydrant Assembly EA 1
Intake,Type SW-502 EA 4
Pipe Apron, 24" RCP W/Guard and Footing EA 1
Manhole/Intake Adjustment, Minor EA 2
Manhole/Intake Adjustment, Major EA 2
Silt Fence-Install, Maint. & Removal LF 400
Seeding,Type 1 Lawn Mix ACRE 4
Inlet Protection Device-Install, Maint. & Removal EA 6
Sidewalk, 6" PCC SY 55
Truncated Domes SF 32
Pavement, HMA, 8"-Beedle SY 670
Pavement, HMA, 9.5"-Cochrane SY 1185
30" PCC Curb and Gutter LF 1335