RiOgQeOghero Park 3 Estates
Justin Clausen to: Diane RVoss 0020201408:27AM
Cc John CJoiner
Justin Clausen Ringgengberg Park 3rd/Ringgenberg Estates
Diane'Certifying letter attached oewe discussed onMonday.
John- FYI there was a separate LOC on file for$150,000 for Ringgenberg Park, tied to the third addition
that required installation of sidewalks and bike path in the development. Almost all of the lots have been
built out and have sidewalk installed. All nf the bike path isinstalled. There were 3 lots still under
construction that didn't have walk installed at this time, but will have shortly as the builder finish the homes
and get ready to pour driveways. 2 lots are not being built nn right now, but | talked with Kurt Fabout
them and they are in the process ofseUing/n|ooing. Thus the sidewalk iain place orin the process of
being placed and all nf the bike path isinstalled. So / naoommendedthatvvara|easetheLOCan /fee/ it
has served its purpose.
Please let mo know if you have questions. Thanks!
JC
Ringonbarg Park3nd release sidewalk and bike poth.doo
CITY OF .
S
Justin A. Clausen, P.E.
Construction Supervisor
515.239.5279nuiu 1515.239.5404/ax
'dausen@dty.amesja.us| City Hall, S1S Clark Avenue | Ames, /ASOU1O