Loading...
HomeMy WebLinkAboutA017 - Letter certifying completion of utilities and asphalt base paving dated August 24, 2010 - Public Works Department ® 515 Clark Avenue, Ames, Iowa 50010 Phone 515-239-5160 ° Fax 515-239-5404 Cm ing Pcojrlc Quality Pro,nons &reptinnal Scrriec August 24, 2010 A,Ug 3 11 X10 Honorable Mayor and Council Members -- City of Ames CITY CLERK: CV OFAMES,IOWA Ames, Iowa 50010 Ladies and Gentlemen: I hereby certify that the utilities and asphalt base paving required as a condition for approval of the final plat of Airport Business Park Subdivision have been completed in an .acceptable manner by, Halbrook Excavating and Con-Struct. The above mentioned improvements have been inspected by the Engineering Division of the Public Works Department of the City of Ames, Iowa and found to meet city specifications and standards. As a result of this certification, the financial security for public improvements on file with the City for this subdivision will be retained at $15,000.00. The remaining work covered by this financial security is street lighting. Sincerely, 0 L ohn Joiner, P.E. AUG 31 2010 Public Works Director City of Ames CITY CLERK CITY OF ANTES,IOWA JJ/ec cc: Finance, Contractor, PW Admin Asst, Construction Supervisor, PW Senior Clerk, Planning & Housing Airport Business Park Subdivision 2 August 24, 2010 Description Unit Quantity Grading Division Mobilization LS 1 Saw Cut and Remove Curb LF 130, Traffic Control LS 1 Clearing and Grubbing LS 1 Topsoil Removal, 9-Inch & Stockpile CY 4,000 Excavation, Class 10 Borrow CY 7,200 Topsoil Replacement CY 4,000 Underground Utilities Division Mobilization LS 1 Sanitary Sewer, Connect to Existing Manhole EA 1 Sanitary Sewer, PVC, 8-Inch Dia LF 1,370 Sanitary Sewer, Manhole, T e `A' EA 5 Storm Sewer, 2000D RCP, 30-Inch Dia LF 535 Storm Sewer, 2000D RCP, 18-Inch Dia LF 78 Storm Sewer, 2000D RCP, 15-Inch Dia LF 87 Storm Sewer, FES, 30-Inch Dia EA 1 Storm Sewer, FES, 18-Inch Dia EA 1 Storm Sewer, Intake, T pe `M-1' EA 1 Storm Sewer, Intake, Beehive EA 1 Perforated Outlet EA 1 Water Tapping Valve & Sleeve, 8-Inch on 12-Inch EA 1 Water Main, 8-Inch, PVC LF 735 Hydrant Assembly EA 3 Stabilization Material TONS 100 Extend Existing 15" CMP Outlet Pie LF 6 PCC Paving Division Mobilization LS 1 Sub grade Preparation SY 2,250 PCC Pavement, 8-Inch SY 1,960 Traffic Control LS 1 Demolition of Existing Median SY 198 Median Replacement, PCC, 9-Inch SY 198 Move Street Sin EA 1 Bike Trail Removal and Repair LS 1 Erosion Control Division Seeding; Rural Mix ACRE 2.5 Seeding; Urban Mix ACRE 2.2 Turf Reinforcement Mat TRM SF 9,950 Scour Stop SF 208 Silt Fencing LF 1,550 Rip Rap TONS 30