HomeMy WebLinkAboutA036 - Memo placed around the dais on June 8, 2021 by Planning & Housing p(3ce.J zxT-w-)d OLN s
Changes to 2" Addendum for Hayden's Prserve.
Claifies trail segments along Hyde Avenue.
4. The 2016 Addendum includes a requirement in Section II (C) (1) (e) for the
construction of a 10-foot shared use path along Hyde Avenue from 190d' Street to
the south boundary of the adjacent Lox-Lot X of the Rose Prairie Final Plat,totaling
approximately 3,900 linear feet. The timing of the installation of the path was to
occur within two years of the first final plat. The Shared Use Path requirement is
in addition to any required shared use paths and/or trails within the development
or other improvements required through the platting process.
The timing requirement is modified as follows:
"The first of leg the path.will extend from W 1901 Street south_for a_distance of
approximately 2,600 feet to a point agreed upon by the City and the Developer
across from the Ada Hayden Park-parkin lot. The first 19g is to be installed within
two years of the first final plat for developable lots igireed upen by !he
Giy-and-f)evel per-acFc)ss-frmn-fhe Ada Hayden Paf1E pa-ing let{ ex-inatel-y
2,600 feet ,
The second leg of the path will extend from the end of the first leg south to Lot X
and connect to the shared use Rath at Auburn Trail. The second leg crosses the
Sturges property frontage and is to be constructed within right-of-way or easement
provided by the City at no cost to the Developer. The second lea of the ath-shall
be approved for deferral beyond two years by the City Council in consideration of
the timing of the connection to be completed with the development of the"Auburn
Trail" site to the south. It is understood by both parties that the second leg of the
path is not required or necessary until the connection point is constructed as a part
of Auburn Trail. Upon notice by the City that the Auburn Trail connection point is
complete, the Developer shall complete the extension of the second leg of the
shared use path to the south end of Parcel X within 150 days, unless an extension
is granted by the City Council."