Loading...
HomeMy WebLinkAboutA015 - Letter certifying completion of utility and street construction dated October 5, 2011 Public Works Department 515 Clark Avenue, Ames, Iowa 50010 r Phone 515-239-5160 Fax 515-239-5404 0 1 Caring People ` Quality Programs Ezceptioual Sen, October 5, 2011 Honorable Mayor and Council Members City of Ames Ames, Iowa 50010 Ladies and Gentlemen: I hereby certify that the utilities and street construction required as a condition for approval of the final plat of Grand Aspen, 4th Addition has been completed in an acceptable manner by Con-Struct, Inc. The above-mentioned improvements have been inspected by the Engineering Division of the Public Works Department of the City of Ames, Iowa and found to meet City Specifications and Standards. As a result of this certification, it is recommended that the financial security for public improvements on file with the City for this subdivision be released in full. Sincerely, 7_100-- John C. Joiner, P.E. Public Works Director City of Ames JJ/ec cc: Finance, Contractor, PW Admin Asst, Construction Supervisor, PW Senior Clerk, Planning & Housing Grand Aspen, 4th Addition 2 October 4, 2011 Description Unite Quahbt Mobilization LS 1 Traffic Control LS 1 Gravel Removal TON 130 Pavement Removal, 8" PCC SY 55 Excavation, Class 10 CY 525 Abandon Existing Sanitary Sewer Main EA 1 Extend 8" Sanitary Sewer LF 30 6" Slotted PVC Subdrain LF 195 Subdrain Cleanout EA 1 Storm Sewer, Type SW-507 Intake EA 1. Strom Sewer, Type SW-541 Intake EA 1 Sub grade Preparation, 8" SY 1025 Subbase, Granular Subbase, 6" TON 330 Paving, PCC, 8" SY 800 Adjacent Slab Sawing LF 68 SW-541 Intake Casting EA 1 i