HomeMy WebLinkAboutA015 - Letter certifying completion of utility and street construction dated October 5, 2011 Public Works Department
515 Clark Avenue, Ames, Iowa 50010
r Phone 515-239-5160
Fax 515-239-5404
0 1
Caring People
` Quality Programs
Ezceptioual Sen,
October 5, 2011
Honorable Mayor and Council Members
City of Ames
Ames, Iowa 50010
Ladies and Gentlemen:
I hereby certify that the utilities and street construction required as a condition for
approval of the final plat of Grand Aspen, 4th Addition has been completed in an
acceptable manner by Con-Struct, Inc. The above-mentioned improvements have been
inspected by the Engineering Division of the Public Works Department of the City of
Ames, Iowa and found to meet City Specifications and Standards.
As a result of this certification, it is recommended that the financial security for public
improvements on file with the City for this subdivision be released in full.
Sincerely,
7_100--
John C. Joiner, P.E.
Public Works Director
City of Ames
JJ/ec
cc: Finance, Contractor, PW Admin Asst, Construction Supervisor, PW Senior Clerk,
Planning & Housing
Grand Aspen, 4th Addition 2
October 4, 2011
Description
Unite Quahbt
Mobilization LS 1
Traffic Control LS 1
Gravel Removal TON 130
Pavement Removal, 8" PCC SY 55
Excavation, Class 10 CY 525
Abandon Existing Sanitary Sewer Main EA 1
Extend 8" Sanitary Sewer LF 30
6" Slotted PVC Subdrain LF 195
Subdrain Cleanout EA 1
Storm Sewer, Type SW-507 Intake EA 1.
Strom Sewer, Type SW-541 Intake EA 1
Sub grade Preparation, 8" SY 1025
Subbase, Granular Subbase, 6" TON 330
Paving, PCC, 8" SY 800
Adjacent Slab Sawing LF 68
SW-541 Intake Casting EA 1
i