I hereby certify that the utilities, traffic improvements and PCC paving required as a
condition for approval of the final plat of Wal-Mart's Subdivision, First Addition
have been completed in an acceptable manner by Oakview Construction, Inc. The above
mentioned improvements have been inspected by the Engineering Division of the Public
Works Department of the City of Ames, Iowa and found to meet city specifications and
standards.
As a result of this certification, it is recommended that the financial security for public
improvements on file with the City for this subdivision be reduced to $24,000. The
remaining work that covers this financial security includes electric facility
improvements, traffic signage and pavement markings on South Duff Ave and the
Construction Site Erosion and Sediment Control Ordinance Bond.
Sincerely,
John Joiner, P.E.
Public Works Director
City of Ames
JJ/ec
cc: Finance, Contractor, PW Admin Asst, Construction Supervisor, PW Senior Clerk,
Planning &Housing
� <
;�..
ter, .
:�-,
2
Wal-Mart's Subdivision, First Addition
February 11, 20o8
De cr; tin unit Qu, Ati
Signal Improvements at 5th and Duff Ave. LS 1.00
Striping Improvements at 5 thand Duff Ave. LS 1.00
Lane Improvements at S and Duff Ave. LS 1.00
Curb & Gutter Removal (Duff Entrance) LF 310
Curb & Gutter New(Duff Entrance) LF 440
Heavy Duty Concrete (Duff Entrance) SY 475
Signage (Duff Entrance) LS 1.00
Earthwork(Duff Entrance) CY 500
Heavy Duty Asphalt(SE 5 Street) SY 3000
Earthwork (SE 5" Street) CY 4000
Curb & Gutter New(SE 5 Street) LF 1360
Curb & Gutter Removal (SE 5 Street) LF 325
Heavy Duty Concrete (SE 5,nStreet) SY 460
Fire Hydrant Relocation (Duff Entrance) EA 1.00
Fire Hydrant Relocation(Target Drive) EA 1.00
8" Waterline Extension LF 3100
Fire Hydrants New EA 6.00
Valves EA 9.00
8" Sanitary Sewer Trunk Extension LF 170
Sanitary Manholes EA 1.00
New Lights (SE 5 Street) LS 1.00
Relocation of Light(Duff Entrance) EA 1.00
Sidewalk Removal (Duff Entrance) SF 1600
Sidewalk New(Duff Entrance) SF 2800
Sidewalk New (SE 5 Street) SF 3500
New Catch Basins EA 3.00
18" CPP Storm Pie LF 80
New Junction Boxes EA 4.00
New Large Catch Basin EA 1.00
New 45"x 73"Arch Pipe LF 1107