RESOLUTION APPROVING POLE ATTACHMENT AGREEMENT AND
UNDERGROUND LOCATING LETTER OF AGREEMENT WITH METRO
FIBERNET,LLC,
FOR THE CITY OF AMES,IOWA
WHEREAS,Metro Fibernet,LLC,(MetroNet)is an internet provider that plans to construct
its fiber-optic network throughout Ames in 2020 and as part of its build-out, MetroNet intends to
place its infrastructure overhead on City utility poles where poles exist and underground in rights-of-
way and easements; and,
WHEREAS,approximately 1.2 million feet of cable will be installed during the process and
to accommodate this, two agreements are necessary; a Pole Attachment Agreement and an
Underground Utility Locate Agreement; and,
WHEREAS, the City's Electric utility maintains several thousand distribution and
transmission poles and other utilities and telecommunication providers routinely attach their cabling
to these poles to deploy their infrastructure throughout the City; and,
WHEREAS,no new providers have made attachments to these poles for several decades and
in a typical year, the existing attachees submit only a handful of requests to attach to poles; and,
WHEREAS, applications are evaluated by the Electric Services Engineering Division, and
poles are inspected before and after the attachment is made; and,
WHEREAS, MetroNet had indicated it will attach to approximately 4,000 electric poles in
the span of approximately ten months and because of vacancies within the Electric Engineering
Division, it will be difficult or impossible for City staff to scrutinize proposed attachments at the
pace they will be submitted; and,
WHEREAS, City staff and MetroNet have worked to negotiate a new pole attachment
agreement that will accommodate MetroNet's planned pace of construction; and,
WHEREAS, the Pole Attachment Agreement provides that during the initial network
buildout, MetroNet will have professional engineers licensed in the state of Iowa submit the
attachment applications and the applications will be reviewed by a contract engineering firm(hired
by MetroNet and approved by the City)to ensure they meet the City's adopted standards; and,
WHEREAS,the contracted firm will also verify pole integrity through field inspections and
spot check the completed attachments to ensure they were made in accordance with the submitted
plans and once the initial buildout is complete, any proposed pole attachments will be reviewed by
City staff rather than the outside firm; and,
WHEREAS, provisions exist for the Utility to require MetroNet to remove its attachments
in the event that the City re-routes poles, or converts overhead infrastructure to underground; and,
WHEREAS, if the City receives complaints from the public regarding the condition of
MetroNet's fiber on the poles,MetroNet must make repairs within ten days or provide information
to the City regarding when the repairs are to be made; and,
WHEREAS, in exchange for attaching to the City's Electric poles, MetroNet will pay the
utility attachment fees as provided in the Municipal Code and the fee is currently$13.05 per pole,
per year; and,
WHEREAS, in Ames subdivisions constructed after the mid-1970s, electric service is
provided underground and in these areas,MetroNet will also put its infrastructure underground;and,
WHEREAS, the City has utility locating staff in Electric Services and in Public Works,
however, these locators generally stay busy with the typical summer construction demand; and,
WHEREAS, City staff has expressed doubts to MetroNet about the City's ability to locate
infrastructure for MetroNet in a timely manner, in addition to keeping up with the typical locating
work that will be requested by other customers,therefore,to keep up with MetroNet's initial build-
out pace, MetroNet has agreed to an Underground Locating Agreement; and,
WHEREAS,through this Agreement,the City will hire an outside utility locating firm,which
will complete utility locates requested solely for MetroNet and its subcontractors, and MetroNet
would reimburse the City for the cost of the contractor; and,
WHEREAS, City staff would retain complete control over the locating contractor's
performance and address any concerns that may arise with the quality of the work; and,
WHEREAS, at the January 14, 2020, City Council meeting, the Council requested that the
Pole Attachment Agreement be amended to incorporate a clause that if the contract terminated and
the fiber infrastructure remained on the poles,the City could have the option to take possession of
the fiber; MetroNet had agreed to the modification of the Agreement; and,
WHEREAS,at the termination of the Agreement by either party,the City may choose to take
down any fiber remaining after 180 days and bill MetroNet the cost,and if MetroNet terminates the
Agreement of if the City terminates the Agreement because of a breach and failure to cure by
MetroNet, the City may elect to retain the fiber remaining upon termination;
WHEREAS,the modification of the Agreement will allow the City to evaluate whether the
fiber had any value or if it is a liability it wishes MetroNet to be responsible for along with protecting
MetroNet against losing its fiber if the City chose not to renew the Agreement at one of the early
renewal periods.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that the Pole Attachment Agreement and Underground Locating Letter of Agreement with Metro
Fibernet, LLC, is hereby approved.
ADOPTED THIS 28`''day of January, 2020.
ci��j MAW
Diane R. Voss, City Clerk John A. Haila, Mayor
Introduced by: Beatty-Hansen
Seconded by: Betcher
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Junck, Martin,
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 28t'day of January, 2020.