Loading...
HomeMy WebLinkAbout~Master - Change Order No. 5 for 2016/17 Storm Water Erosion Control Program (S. Skunk River-Carr Park to Homewood Golf Course) - Contract A RESOLUTION NO. 19-534 RESOLUTION APPROVING CHANGE ORDER NO. 5 ON CONTRACT WITH ON-TRACK CONSTRUCTION LLC FOR 2016/17 STORM WATER EROSION CONTROL PROGRAM (S. SKUNK RIVER-CARR PARK TO HOMEWOOD GOLF COURSE) - CONTRACT A FOR THE CITY OF AMES, IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 5 on contract with On-Track Construction LLC, of Nevada, Iowa, for the 2016/17 Storm Water Erosion Control Program (S. Skunk River-Carr Park to Homewood Golf Course) - Contract A, be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 81h day of October, 2019. Diane . Voss, City Clerk John A. Haila, Mayor Introduced by: Beatty-Hansen Seconded by: Corrieri Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Martin,Nelson Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 81h day of October, 2019. I Q TY CIF AMES PUBU C VCRKS - ENG NEER NG DI VI SI CN Date 1-Oct-19 CITY of CONTRACT CHANGE ORDER# 5 P.O.# 55157 irr` Ames Balancing ACCT# VARIOUS 375-8633-489 PROJECT: 2016/17 Storm Water Erosion Control Program, S. Skunk River Contract A CONTRACTOR CHANGE ORDERS APPROVED TO DATE. 1 $1,000.00 11 PREVIOUS APPROVED On-Track Construction, LLC 2 ($16,261.50) 12 CHANGE ORDERS ���- -- (Name) -----_-��- 3 $7,700.00 13 6$ 21.13 880 Lake Shore Drive 4 $8,182.63 14 ORIGINAL CONTRACT �A�2�� _ 5 15 $793.415.00 Nevada, IA 50201 6 16 CURRENT ADJUSTMENT -��- -� (City,stagy.zp) --- - 7 17 -$66.269.92 8 18 CUMULATIVE CHANGE ____ ---- - ----------_ 9 19 ORDER AMOUNT 10 20 $99,414.05 Requires City Council Approval ADJVSTED CONTRACT $727,766.21 The contract Is hereby modified and amended as foliows: ITEM DESCRIPTION UNrT PRICE QUANTITY TOTAL 6 COMPACTION TESTING LS $7,575,00 1.00 $7,575 00 7 TRENCH COMPACTION TESTING LS $1,515.00 1.00 $1,515.00 8-A1 STORM SEWER,TRENCHED RCP, 24"DIAM LF $88.00 6.00 $528.00 10 STORM SEWER,TRENCHED RCP, 36"DIAM LF $200.00 12.00 $2,400.00 10-A2 STORM SEWER, TRENCHED RCP, 36"DIAM LF $133.50 9.00 S1,201.50 21-A1 SUBDRAIN 8" PERFORATED HDPE LF $33.50 3,50 $117.25 21-A2 SUBDRAIN 8"PERFORATED HDPE LF $34.00 2.50 $85.00 22 SUBDRAIN 12"PERFORATED HDPE LF $54.00 5.00 $270.00) 27 REMOVAL OF SHARED USE PATH SY $6.00 700.78 $4.204.68 28 PROTECTION OF SHARED USE PATH SY $8.00 319.00 ($2,552 00 319.00 29-A2 SHARED USE PATH 6"NON-REINFORCED PC SY $61.00 61.66 $3,761.26 31 SEEDBED PREPARATION AC $1.000.00 3.70 $3,700.00 31-A1 SEEDBED PREPARATION AC $1.000.00 0.32 S320 00 31-A2 SEEDBED PREPARATION AC $1,000.00 0.14 $140.00 32 HYDRAULIC SEEDING: TEMPORARY SEEDIN AC $4,300.00 3.70 ($15,910.00 32-A1 HYDRAULIC SEEDING TEMPORARY SEEDIN AC $4.300.00 0.32 ($1,376.00 32-A2 HYDRAULIC SEEDING:TEMPORARY SEEDIN AC $4.300.00 0.14 $602.00 34 COMPOST BLANKETS 1.5"DEPTH) SY $0.15 3,775,00 $566.25 35 FILTER SOCKS 12" LF $5.00 3 00 $15.00 35-A1 FILTER SOCKS 12" LF $5.00 215.00 ($1,075.00) 35-A2 FILTER SOCKS 12" LF $5.00 55.00 $275.00 37 FILTER SOCKS REMOVAL LF $2.00 203.00 $406.00 37-A1 FILTER SOCKS REMOVAL LF $2.00 215.00 $430.00 37-A2 FILTER SOCKS REMOVAL LF $2.00 55.00 $110 00 38 WATTLES 9" LF $5.00 351.00 $1,755.00 46 SILT FENCE LF $5.00 200.00 $1,000 00 48 EROSION CONTROL MULCHING, HYDROMUL AC $3,600.00 3 70 $14,060 00 48-A1 EROSION CONTROL MULCHING, HYDROMUL AC $3,800.00 0.32 ($1,216.00 48-A2 EROSION CONTROL MULCHING, HYDROMUL AC $3,800.00 0.14 $532.00 49 TURF REINFORCEMENT MATS DeKoWe 700 SY $6.00 1,185.00 $7,110.00 50 SURFACE ROUGHENING SY $0.30 10.890.00 ($3,267 00 51 INLET PROTECTION DEVICE EA $255.00 1.00 $255.00 52 INLET PROTECTION DEVICE, MAINTENANCE EA $105.00 1.00 $105.00 It is mutually agreed that the contract price is increased/decreased by: Total: j( 66,269.92 payable/deductible immediately upon completion of the work called for in this order. As a result of this change order the time for completion of the above-mentioned contract is hereby extended by an additional 0 days. This change order is incorporated into and governed by the above mentioned contract. Accepted for Cont or Recommended for ATppprov i by the City of Ames C, Cont, POw.er Dale WrLapal r Deb For the City of Ames: PYW Works Dksctar Deb .C#t*F-Wller Date j Pape 1 of �� CC:Project Engineer, PW Mgmt.Asst., Finance, Contractor 1 0/31201 9 1 1 0:05 AM