HomeMy WebLinkAbout~Master - Change Order No. 5 for 2016/17 Storm Water Erosion Control Program (S. Skunk River-Carr Park to Homewood Golf Course) - Contract A RESOLUTION NO. 19-534
RESOLUTION APPROVING CHANGE ORDER NO. 5
ON CONTRACT WITH
ON-TRACK CONSTRUCTION LLC
FOR 2016/17 STORM WATER EROSION CONTROL PROGRAM
(S. SKUNK RIVER-CARR PARK TO HOMEWOOD GOLF COURSE) - CONTRACT A
FOR THE CITY OF AMES, IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper on the
above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Change Order No. 5 on contract with On-Track Construction LLC, of Nevada, Iowa, for the
2016/17 Storm Water Erosion Control Program (S. Skunk River-Carr Park to Homewood Golf
Course) - Contract A, be approved and adopted as attached hereto and made a part hereof by this
reference.
ADOPTED THIS 81h day of October, 2019.
Diane . Voss, City Clerk John A. Haila, Mayor
Introduced by: Beatty-Hansen
Seconded by: Corrieri
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Martin,Nelson
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 81h day of October, 2019.
I
Q TY CIF AMES PUBU C VCRKS - ENG NEER NG DI VI SI CN Date 1-Oct-19
CITY of CONTRACT CHANGE ORDER# 5 P.O.# 55157
irr` Ames Balancing ACCT# VARIOUS
375-8633-489
PROJECT:
2016/17 Storm Water Erosion Control Program, S. Skunk River Contract A
CONTRACTOR CHANGE ORDERS APPROVED TO DATE.
1 $1,000.00 11 PREVIOUS APPROVED
On-Track Construction, LLC 2 ($16,261.50) 12 CHANGE ORDERS
���- -- (Name) -----_-��- 3 $7,700.00 13 6$ 21.13
880 Lake Shore Drive 4 $8,182.63 14 ORIGINAL CONTRACT
�A�2�� _ 5 15 $793.415.00
Nevada, IA 50201 6 16 CURRENT ADJUSTMENT
-��- -� (City,stagy.zp) --- - 7 17 -$66.269.92
8 18 CUMULATIVE CHANGE
____ ---- - ----------_ 9 19 ORDER AMOUNT
10 20 $99,414.05
Requires City Council Approval ADJVSTED CONTRACT
$727,766.21
The contract Is hereby modified and amended as foliows:
ITEM DESCRIPTION UNrT PRICE QUANTITY TOTAL
6 COMPACTION TESTING LS $7,575,00 1.00 $7,575 00
7 TRENCH COMPACTION TESTING LS $1,515.00 1.00 $1,515.00
8-A1 STORM SEWER,TRENCHED RCP, 24"DIAM LF $88.00 6.00 $528.00
10 STORM SEWER,TRENCHED RCP, 36"DIAM LF $200.00 12.00 $2,400.00
10-A2 STORM SEWER, TRENCHED RCP, 36"DIAM LF $133.50 9.00 S1,201.50
21-A1 SUBDRAIN 8" PERFORATED HDPE LF $33.50 3,50 $117.25
21-A2 SUBDRAIN 8"PERFORATED HDPE LF $34.00 2.50 $85.00
22 SUBDRAIN 12"PERFORATED HDPE LF $54.00 5.00 $270.00)
27 REMOVAL OF SHARED USE PATH SY $6.00 700.78 $4.204.68
28 PROTECTION OF SHARED USE PATH SY $8.00 319.00 ($2,552 00
319.00
29-A2 SHARED USE PATH 6"NON-REINFORCED PC SY $61.00 61.66 $3,761.26
31 SEEDBED PREPARATION AC $1.000.00 3.70 $3,700.00
31-A1 SEEDBED PREPARATION AC $1.000.00 0.32 S320 00
31-A2 SEEDBED PREPARATION AC $1,000.00 0.14 $140.00
32 HYDRAULIC SEEDING: TEMPORARY SEEDIN AC $4,300.00 3.70 ($15,910.00
32-A1 HYDRAULIC SEEDING TEMPORARY SEEDIN AC $4.300.00 0.32 ($1,376.00
32-A2 HYDRAULIC SEEDING:TEMPORARY SEEDIN AC $4.300.00 0.14 $602.00
34 COMPOST BLANKETS 1.5"DEPTH) SY $0.15 3,775,00 $566.25
35 FILTER SOCKS 12" LF $5.00 3 00 $15.00
35-A1 FILTER SOCKS 12" LF $5.00 215.00 ($1,075.00)
35-A2 FILTER SOCKS 12" LF $5.00 55.00 $275.00
37 FILTER SOCKS REMOVAL LF $2.00 203.00 $406.00
37-A1 FILTER SOCKS REMOVAL LF $2.00 215.00 $430.00
37-A2 FILTER SOCKS REMOVAL LF $2.00 55.00 $110 00
38 WATTLES 9" LF $5.00 351.00 $1,755.00
46 SILT FENCE LF $5.00 200.00 $1,000 00
48 EROSION CONTROL MULCHING, HYDROMUL AC $3,600.00 3 70 $14,060 00
48-A1 EROSION CONTROL MULCHING, HYDROMUL AC $3,800.00 0.32 ($1,216.00
48-A2 EROSION CONTROL MULCHING, HYDROMUL AC $3,800.00 0.14 $532.00
49 TURF REINFORCEMENT MATS DeKoWe 700 SY $6.00 1,185.00 $7,110.00
50 SURFACE ROUGHENING SY $0.30 10.890.00 ($3,267 00
51 INLET PROTECTION DEVICE EA $255.00 1.00 $255.00
52 INLET PROTECTION DEVICE, MAINTENANCE EA $105.00 1.00 $105.00
It is mutually agreed that the contract price is increased/decreased by: Total: j( 66,269.92
payable/deductible immediately upon completion of the work called for in this order. As a result of this change order
the time for completion of the above-mentioned contract is hereby extended by an additional 0 days.
This change order is incorporated into and governed by the above mentioned contract.
Accepted for Cont or Recommended for ATppprov i by the City of Ames
C,
Cont, POw.er Dale WrLapal r Deb
For the City of Ames:
PYW Works Dksctar Deb .C#t*F-Wller Date
j Pape 1 of ��