HomeMy WebLinkAbout~Master - Change Order No. 1 for 2017/18 Shared Use Path Maintenance Program #2 (Stange Road) RESOLUTION NO. 19-530
RESOLUTION APPROVING CHANGE ORDER NO. 1
ON CONTRACT WITH
MANATT'S INC.,
FOR 2017/18 SHARED USE PATH MAINTENANCE PROGRAM #2 (STANGE ROAD)
FOR THE CITY OF AMES, IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper on the
above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Change Order No. 1 on contract with Manatt's Inc.,of Ames,Iowa,for the 2017/18 Shared Use
Path Maintenance Program#2(Stange Road)be approved and adopted as attached hereto and made
a part hereof by this reference.
ADOPTED THIS 8`h day of October, 2019.
Diane . Voss, City Clerk John A. Haila, Mayor
Introduced by: Beatty-Hansen
Seconded by: Corrieri
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Martin, Nelson
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 81h day of October, 2019.
CITY OF AMES PUBLIC WORKS - OPERATIONS DIVISION Date 18-SOP-19
�� CITV OF; Ames, ACCT# 030-8811
CONTRACT CHANGE ORDER# 1 (balancing) P.O.#
_ -439-75.11
PROTECT:
2017-18 Shared Use Path Maintenance (Stange Road
CONTRACTOR CHANGE ORDERS APPROVED TO DATE
1 11 PREVIOUS APPROVED
Manatts, Inc 2 12 CHANGE ORDERS
----------------------------------------------------------------
(Name) 3 13
2120E 13th St 4 14 ORIGINAL CONTRACT
-------- --- - -- - - -(Address] - - -- ----- - - 5 15 $129,901.79
Ames, IA 50010 6 16 CURRENT ADJUSTMENT
----------------------- ---------------------------------------
(City.State,Zip) 7 17 -$48,493.89
8 18 CUMULATIVE CHANGE
9 19 ORDER AMOUNT
10 20 $48,493.89
Requires City Manager Approval ADJUSTED CON TRACT
581,407.90
The contract Is horot)y modiflod and amonded as follows:
ITEM I DESCRIPTION UNIT PRICE QUANTITY TOTAL
P2. Topsoil, 4"Depth, On-Site CY $60.00 20.00 ($1,200.00)
Excavate Unsuitable Sub grade, 8"Depth CY $105.00 209.10 $21,955.50)
Sub grade Preparation, 8" Depth SY $5.00 (1,191.30) ($5,956.50)
Sub grade Treatment, Geo rid SY $4.25 209.10 $88868
Special Backtill, 4"Depth, Crushed Concrete SY $10.50 (209.10) ($2,195 55)
7.1 JHMA Base, 3/4" Mix, 3 1/2" Depth TN $85.00 188.00 $15,980 00)
7.2 HMA Surface, 1/2"Mix, 1 1/2" Depth TN $95.00 44.82 $4,257.90
7.3 Asphalt Binder, PG 58-28S, Standard Traffic TN $560.00 9.45) ($5,292 00)
7.4 Removal of Sidewalk/Driveway SY $17.00 874.20 $14.861.40)
7.5 Sidewalk, PCC,4" SY $118.00 37.90 $4,472.20
7.6 Sidewalk, PCC,6" SY $128.00 10,30 ($1,318 40)
7 7 1 Detectable Warning SF $30.00 35.00 $1,050.00
7.8 ADD: Remove/Replace 30"Curb and Gutter LF $48.00 127.00 $6.096.00
79 ADD. 5" HMA Base Patching SF $6.00 1,470.00 $8,820.00
9.1 Erosion Control Wattles LF $2.64 1,089.00 $2,874.96)
9.2 Root Barrier EA $322.00 8.50 ($2,737.00)
9 3 ADD Seeding LS $2,070.00 1.00 $2,070.00
It is mutually agreed that the contract price Is increased/decrease y. Total: ( 4 ,493.89
payable/deductible immediately upon completion of the work called for in this order. As a result of this change order,
the time for completion of the above-mentioned contract is hereby extended by an additional 0 days.
This change order is incorporated into and governed by the above mentioned contract.
z
tad I C acto Reco ended f Approval by the City of Ames:
9 7
ContractorlOw r Date Operations Manager D to
For the City of Ames:
sic
P tic Works Director Date city Patfager ate
Page t of t
CC: Project Engineer, PW Mgmt. Asst., Finance, Contractor 9/19/2019 1 7:33 AM