RESOLUTION APPROVING CHANGE ORDER NO. 1
ON CONTRACT WITH
GENERAL ELECTRIC STEAM SERVICES, INC.,
FOR FIELD ENGINEERING SERVICES FOR
UNIT #7 TURBINE GENERATOR OVERHAUL
FOR THE CITY OF AMES,IOWA
WHEREAS, it has been determined that a Change Order is necessary and proper on the
above Contract.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Change Order No. I on contract with General Electric Steam Services, Inc., of Omaha,
Nebraska, for the field engineering services for Unit#7 Turbine Generator Overhaul be approved
and adopted as attached hereto and made a part hereof by this reference.
ADOPTED THIS 24`h day of September, 2019.
y
Diane . Voss, City Clerk John A. Haila, Mayor
Introduced by: Gartin
Seconded by: Corrieri
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Martin,Nelson
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 24t1i day of September, 2019.
CITY OF CHANGE ORDER NO. 1
Ames
CONTRACT / BID NO:
PURCHASE ORDER NO: 1 56974
September 19, 2019
Project: Field Engineering Services for Unit 7 Turbine Generator
Overhaul Project
Contractor Name: General Electric International Change Orders Ap roved to Date:
Address: 11640 Arbor Street 1 3
City, State,&Zip Code: Omaha, NE 68144 2 4
The contract is modified as follows upon execution of this Change Order. The changes included in this
change order are made in order to carry out the original intent of the contract. The changes included in
this change order are to be accomplished in accordance with the terms, stipulations, and conditions of
the original contract as though included herein.
DESCRIPTION COST
This change order is for the additional work to be performed by General Electric
International, Inc. for the Unit 7 turbine/generator major overhaul. The generator AVR
and exciter require GE maintenance due to GE proprietary information in which the
current contractor HPI does not have access to. The turbine bearing work is required as
a result of as-found conditions of the bearings during disassembly of the unit.
In general, work to include the following (extent of work detailed in Quotes BJH091719
and BJH091819): $49.986.22
Generator AVR and Generator AVR Testing
- Rebabbit of Turbine Bearing #1
Rebabbit of Turbine Bearing #3
Rebabbit of Turbine Bearing #4
Contract Price:
Original contract rice: $200.000.00
Change orders approved to date: $0.00
Amount of this change order: $49,986.22
Adjusted contract price including this change order: $249,986.22
Reco nde b Accepted by Contractor: Acce ed f City f e�:
nald Kom Signature John A. Haila. Vayor
Director of Electric Services 9't� 4o.rnhLw- t i'n r City of Ames. Iowa
City of Ames. Iowa Printed Name & Title
T1
��,2 l�_ / I1'_9'q
I `1
Date Date to