Loading...
HomeMy WebLinkAbout~Master - Change Order No. 5 for Engineering and Relates Services to Convert the City's Steam Electric Plant's Ash Impoundment to Comply with EPA Regulations RESOLUTION NO. 19-473 RESOLUTION APPROVING CHANGE ORDER NO. 5 ON CONTRACT WITH SCS ENGINEERS FOR THE ENGINEERING AND RELATED SERVICES NECESSARY TO PROVIDE SERVICES NECESSARY TO CONVERT THE CITY'S STEAM ELECTRIC PLANT'S ASH IMPOUNDMENT TO COMPLY WITH EPA REGULATIONS FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 5 on contract with SCS Engineers of Clive, Iowa, for the engineering and related services necessary to provide services necessary to convert the City's Steam Electric Plant's Ash Impoundment to comply with EPA Regulations and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 10`h day of September, 2019. cr Diane . Voss, City Clerk John A. Haila, Mayor Introduced by: Corrieri Seconded by: Gartin Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Martin,Nelson Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 10' day of September, 2019. CITY CHANGE ORDER NO. 5 A I I I e S CONTRACT / BID NO: 2018-055 PURCHASE ORDER NO: 54905 September 10, 2019 LProject:--' Engineering Services for Compliance with Select Provisions of U.S. EPA's Coal Combustion Residuals (CCR) Standard Contractor Name: SCS Engineers Change Orders Approved to Date: Address: 8450 Hickman Road Suite 20 1 $4,415.00 3 1 $10,820.00 City,State,&Zip Code: Clive, IA 50325 2 $122.780.00 4 1 $39.880.00 The contract is modified as follows upon execution of this Change Order. The changes included in this change order are made in order to carry out the original intent of the contract. The changes included in this change order are to be accomplished in accordance with the terms. stipulations. and conditions of the original contract as though included herein. DESCRIPTION AMOUNT SCS Engineers to perform additional work pertaining to the City of Ames Steam Electric Plant's ash site necessary for compliance with the Coal Combustion Residuals (CCR) standard. This change order is to provide design and engineering services along with permit acquisition and bidding support necessary to comply with U.S. EPA's Coal Combustion Residuals (CCR) Standard by closing-in-place a portion of the City's Steam Electric Plant's ash impoundment, and by reconstructing the remainder of the impoundment to support the power plant's future ash handling needs. The scope of services to be provided by SCS Engineers includes the following. 1) Compilation of process water and soils data in order to make informed design and engineering decisions. 2) Design and develop site dewatering plans necessary to allow the construction activities to create the features of the site. 3) Develop design and engineering plans to acquire the necessary permits, and for the construction of the closure and redevelopment features of the site. 4) Prepare a Closure Plan and the permit application(s) and assist the City in obtaining the necessary state and local permits to approve the dewatering of the ash impoundment and to perform the construction closure and reconstruction of the ash impoundment. 5) Develop the technical (design and engineering) plans and specifications necessary to create the invitation-to-bid (ITB) package for the project scope of work. 6) Support the City during the bidding process by: 1) providing a list of bidders to perform the work. 2) attend pre-bid meetings to help answer questions from potential bidders. 3) provide the City with answers to technical questions that may arise during the bid period, and 4) review bids and provide input to City staff regarding such bids. 7) Attend meetings including: 1) an engineering kick-off meeting. 2) a meeting with Iowa DNR regarding permitting. 3) a 60% design review meeting, 4) a 95% design review meeting, and 5) other meetings as necessary. The above scope of services are outlined and described in a proposal from SCS Engineers dated September 4, 2019. The scope of services will be performed and invoiced on a time and material basis with a total project cost estimated at $196,180, TOTAL $196.180 Contract Price: Original contract rice: _ $30,710.00 Change orders approved to date: J $177.895.00 Amount of this change order: $196,180.00 Adjusted contract price including this change order: $404,785.00 Accept by ity of Ames: cepted by Contractor: Accted b City of Ames: _C> 11411 '4 Do a Kom. Director Signa ure John Haila. Mayor City of Ames Electric Services 1 �'� J i , ! ;/' S(, V/1 City of Ames S Printed name & itle ry� 1� I �L�13 J Date f Date Date