Loading...
HomeMy WebLinkAbout~Master - Change Order No. 1 for the 2016/17 Storm Water Erosion Contol Program - Contract B RESOLUTION NO. 19-414 RESOLUTION APPROVING CHANGE ORDER NO. 1 ON CONTRACT WITH GREENTECH OF IOWA, LLC, FOR THE 2016/17 STORM WATER EROSION CONTROL PROGRAM (S. SKUNK RIVER- CARR PARK TO HOMEWOOD GOLF COURS) - CONTRACT B FOR THE CITY OF AMES,IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 1 on contract with GreenTech of Iowa, LLC., of Grimes, Iowa, for the 2016/17 Storm Water Erosion Control Program (S. Skunk River - Carr Park to Homewood Golf Course) - Contract B be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 13' day of August, 2019. Diane . Voss, City Clerk John A. Haila, Mayor Introduced by: Nelson Seconded by: Gartin Voting aye: Betcher, Corrieri, Gartin, Martin,Nelson Voting nay: None Absent: Beatty-Hansen Resolution declared adopted and signed by the Mayor this 13'day of August, 2019. a TY OF AWES KM C YOM - ENG NEER NG DI VI SI ON Date 25Jun-19 CONTRACT CHANGE ORDER N 0 P.Os 55156 �; Ames Balancing ACCTs 377-8633.489 PROJECT: 2016117 Storm Water Erosion Control Proaram-Contract B(S.Skunk River-Carr Park to Homewood Golf Course CONTRACTOR CHANGE ORDERS APPROVED TO DATE: 1 11 PREVIOUS APPROVED Green Tech of Iowa __ 2 12 CHANGE ORDERS W(Name) 3 13 PO Box 350 _ 4 14 ORIcMw COVIRAcr (��) y 5 15 $82,637.50 Grimes,IA 50111 6 16 cu--I AojusTeswr ——-- —(C(H,suro.nP) —�� — 7 17 -525,256.50 8 18 CU i ATIVE CHANGE 9 19 ORDER AMOUNT 10 20 $25,256.50 Requires City Manager Approval ADArsrED CONrRACT $57' 00 The contract is hereby modified and amended as follows: ITEM DESCRIPTION UNIT PRICE QUANTITY TOTAL 2 ISEEDBED PREPARATION AC $2,500.00 3.10 $7.750.00 3 HYDRAULIC SEEDING:PERMANENT SEEDIN AC $8,500.00 0.70 $5,950.00 4 HYDRAULIC SEEDING PERMANENT SEEDIN AC $2,250.00 0.07 $157.50 5 SWPPP MANAGEMENT LS $4,250.00 1.00 !&4.250 OC; 6 COMPOST BLANKETS 1.5-DEPTH SY $125.00 100.00 'E'2.500 00) 7 FILTER SOCKS 12' LF $3.50 100.00 (5350.00) 8 FILTER SOCKS REMOVAL LF $1 00 100.00 $100.00 9 WATTLES 9" LF $3.00 100.00 (S300.00 10 EROSION CONTROL MULCHING,HYDROMUL AC $2,000.00 0.50 !$?000.0() 11 TURF REINFORCEMENT MATS DeKoWe 700 SY $6.50 544.00 $3 536.00 12 SURFACE ROUGHENING SY $%00 100.00 ($1,000.00 13 INLET PROTECTION DEVICE(TYPE) EA $200,00 1.00 ($200.00 14 INLET PROTECTION DEVICE,MAINTENANCE EA $150.00 1.00 $150.00 15 CONSTRUCTION SURVEY LS $5,000.00 1 00 f$5,000.00 16 SHORT-TERM ESTABLISHMENT AND MAINTE TRIPS $1 500.00 12.00 $18,000.00) It Is mutually agreed that the contract price is incra reased by. Total: payable/deductible immediately upon completion of the work called for in this order.As a result of this change order, the time for completion of the above-mentioned contract is hereby extended by an additional 0 days. This change order is incorporated hVo and governed by the above mentioned contract. Accopled for Conlrador: Rem Coy of Ames Corerectorgr Dole Mn.%,ME.Q— DMe a F(the Gty of AMC 140*2 DkOdkV OW Cry Mensew Dole Pape lot 1 CC.Project Engineer,PW Mgmt.Asst,Finance.Contractor 6/25/2019 1 1 1:32 AM