Loading...
HomeMy WebLinkAbout~Master - Agreement with J-Corp for Engineering Design for the Tripp Street Extension RESOLUTION NO. 19-387 RESOLUTION APPROVING AN AGREEMENT WITH J-CORP FOR ENGINEERING DESIGN FOR THE TRIPP STREET EXTENSION FOR THE CITY OF AMES,IOWA WHEREAS,the City of Ames was working with J-Corp to advance a partnering Agreement for development of the former Ames Middle School site at 321 State Avenue,and as part of working towards this agreement, J-Corp retained FOX Engineering to design plans for the potential subdivision layout and infrastructure elements; and, WHEREAS, in early 2018, it was decided that an agreement would not be pursued any further and the City of Ames Engineering staff was then asked to develop plans and specifications for the extension of Tripp Street through the site; and, WHEREAS, following completion of the Tripp Street paving project, FOX Engineering requested a meeting with City staff to discuss similarities between the City's Tripp Street design and the FOX design for the overall subdivision and infrastructure; and, WHEREAS, the roadway alignment followed existing storm sewer and the vertical profile of the City plans matched those of FOX,with elements such as pedestrian ramp design matched;and, WHEREAS, both plans also included a pond and storm sewer at the lower east side of the project, while the pond in the City plans was for providing roadway fill for the project rather than specifically utilized for stormwater management,it was identical to the stormwater design designed by FOX; and, WHEREAS,other elements such as the western part of the storm sewer system and the water main design did not directly match FOX plans, it was pointed out that these elements needed to be designed along with the engineering effort for those components that were a match between the two designs; and, WHEREAS,FOX has submitted timesheets showing its staff s efforts for project components such as preliminary plat,preliminary design,stormwater management,survey and construction plans, which totals $57,339.05; and, WHEREAS, since FOX's client on this project was J-Corp,not the City,an Agreement has been drafted which provides for payment to J-Corp,which will subsequently transfer these funds to FOX, and in turn the City would own the work product and have it available for use on additional elements and phases. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that the Agreement with J-Corp and the payment of$57,339.05 from unobligated General Obligation Bond funds to J-Corp, is hereby approved, according to the terms of the agreement, J-Corp will transfer these funds to FOX Engineering. ADOPTED THIS 23rd day of July, 2019. Diane. Voss, City Clerk John A. Haila, Mayor Introduced by: Gartin Seconded by: Betcher Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Martin Voting nay: None Absent: Nelson Resolution declared adopted and signed by the Mayor this 23rd day of July, 2019.