HomeMy WebLinkAbout~Master - Awarding Contract for Engineering Services for the Design of the Water Treatment Plant Dehumidification Project RESOLUTION NO. 19-331
RESOLUTION AWARDING CONTRACT FOR ENGINEERING SERVICES TO
KFI ENGINEERS FOR THE DESIGN OF THE WATER TREATMENT PLANT
DEHUMIDIFICATION PROJECT
FOR THE CITY OF AMES,IOWA
WHEREAS,the new water treatment plant started operation in 2017 and staff identified three
areas were dehumidification is necessary,but was not installed during the initial construction; and,
WHEREAS, dehumidification is important to extend the useful life of electrical and
mechanical equipment installed in areas that would otherwise have extremely high humidity; and,
WHEREAS,in March 2019,a request for proposals(RFP)was issued for design engineering
services for the Water Treatment Plant Dehumidification Project and four proposals were received;
however, one of the proposals was determined to be incomplete and unresponsive; and,
WHEREAS,the qualifications of the other three firms who submitted responsive proposals
were found to be very similar; and,
WHEREAS, HDR, Inc., was the original HVAC design engineer for the new Treatment
Plant, so it is easy to identify why their proposed fee would be so much lower than the other firms;
and,
WHEREAS, unfortunately,there are issues with the newly constructed HVAC system that
seem to staff to be taking an inordinately long time for the engineer to resolve and staff believes that
these issues need to be resolved before additional design work is awarded to HDR, Inc.; and,
WHEREAS,KFI Engineer's proposed scope and fee as submitted included design,bidding,
and construction phase services, and staff has asked KFI Engineer to remove the bidding and
construction phase services from the scope for now; and,
WHEREAS, after a design has been finalized, staff will negotiate an amendment to include
bidding and construction related services; and,
WHEREAS, the FY 2018/19 Capital Improvements Plan Budget includes $400,000 for
design and construction of dehumidification as part of the Water Plant Facility Improvements
Project.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that the award of contract for Engineering Services to KFI Engineers of St. Paul, Minnesota, for
design of the Water Treatment Plant Dehumidification project in an amount not to exceed$66,500
is hereby approved,and furthermore once the design services are completed,the staff will negotiate
a change order with this firm to perform some, or all, of the construction-related services.
ADOPTED THIS 9t'day of July, 2019.
Dia e-R. Voss, City Clerk John A. Haila, Mayor
Introduced by: Gartin
Seconded by: Corrieri
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin,Nelson
Voting nay: None Absent: Martin
Resolution declared adopted and signed by the Mayor this 9'day of July, 2019.