~Master - Change Order No. 2 with Shank Constructors, Inc.
RESOLUTION NO. 19-216 RESOLUTION APPROVING CHANGE ORDER NO. 2 ON CONTRACT WITH SHANK CONSTRUCTORS, INC. FOR WATER POLLUTION CONTROL FACILITY DIGESTER IMPROVEMENTS PHASE II PROJECT FOR THE CITY OF AMES, IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 2 on contract with Shank Constructors,Inc. of Minneapolis,Minnesota, for the Water Pollution Control Facility Digester Improvements Phase II Project be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 141h day of May, 2019. '!!)14rVy11AL zvv%--Ir Diane . Voss, City Clerk John . Haila, Mayor Introduced by: Corrieri Seconded by: Beatty-Hansen Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Martin,Nelson Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 14`h day of May, 2019. Strand Associates, Inc.' 910 West Wmgra Drive Madison,WI 53715 _ IPI608-251-4643 STRAND ASSOCIATES" May 8, 2019 CHANGE ORDER NO. 2 PROJECT: Digester Improvements Phase II OWNER: City of Ames CONTRACT: 2019-017 CONTRACTOR: Shank Constructors, Inc. Description of Change 2a WCD No. 2—Replace two 90-degree elbows with tees on ADD $7,283.00 sludge piping. 2b WCD No. 3—Replace suction and discharge piping on ADD $42,650.00 diaphragm pumps. Replace existing PVC piping with ductile iron piping at the digester sludge overflow piping. 2c CPR No. 4—Relocate waste gas burner and associated ADD $0.00 piping to east of the digester complex. Delete the new road and grading west of the secondary digester. TOTAL VALUE OF THIS CHANGE ORDER: ADD $49,933.00 Contract Price Adjustment Original Contract Price $2,165,200.00 Previous Change Order Adjustments $23,063.00 Adjustment in Contract Price this Change Order $49,933.00 Current Contract Price including this Change Order $2,238,196.00 Contract Milestone I Completion Date Adjustment Original Contract Milestone 1 Completion Date May 31, 2019 Contract Milestone 1 Completion Date Adjustments due to previous Change Orders 0 Days Contract Milestone 1 Completion Date Adjustments due to this Change Order 17 Days Current Milestone 1 Contract Completion Date including all Change Orders June 17,2019 Contract Milestone 2 Completion Date Adjustment Original Contract Milestone 2 Completion Date August 15, 2019 Contract Milestone 2 Completion Date Adjustments due to previous Change Orders 0 Days Contract Milestone 2 Completion Date Adjustments due to this Change Order 26 Days Current Milestone 2 Contract Completion Date including all Change Orders September 10, 2019 SLA.(IRS.\MAD\4400-44W4429=3\Congruc ion\Change Ordm\CO 2Um s CO No 2 dwx www.strand.com I - Strand Associates, Inc: City of Ames—Shank Constructors, Inc. Contract 2019-017, Change Order No. 2 Page 2 May 8, 2019 Contract Substantial Completion Date Adjustment Original Contract Substantial Completion Date October 31, 2019 Contract Substantial Completion Date Adjustments due to previous Change Orders 0 Days Contract Substantial Completion Date Adjustments due to this Change Order 61 Days Current Substantial Contract Completion Date including all Change Orders December 31, 2019 Contract Final Completion Date Adjustment Original Contract Final Completion Date December 31, 2019 Contract Final Completion Date Adjustments due to previous Change Orders 0 Days Contract Final Completion Date Adjustments due to this Change Order 57 Days Current Final Contract Completion Date including all Change Orders February 26, 2020 This document shall become a supplement to the Contract and all provisions will apply hereto. MMENDED S 8' r ENGINEER—Strand oc ates, Inc.f Date A7;V x E S /3 1 NTRA OR—Shank Constructors, Inc. Dfite APPRO 4-1I� OWNER—City of Ames Date SLA tII\S U1ADW400•-4499\4429\003\Conwuction\Change OrdersTO 2Uma CO No.2 doca www.strand.com STRAND ASSOCIATES' Work Change Directive Directive No.: 02 Contract No.: 2019-017 Owner: City of Ames IA By: Travis Anderson Contractor: Shank Constructors, Inc. Date: 05/08/2019 Description of Work Cost Cost Deduction Addition Replace two 90 deg elbows with tees on sludge transfer line. $7,283.00 Total Remarks: Change in Contract Price by: ❑ Supplemental Unit Price ❑ Unit Price ® Lump Sum Requested by: Strand Associates Inc. 05/08/2019 Date Recommended by. ,�ih.,—, s�y/t"'I Travis Anderson, Strand Associates, Inc.® (Engineer) Date Accepted by: 1p Marc Hanscom, Shank Constructors, Inc. (Contractor) Date Approved by: t Ames (owner) Date THIS FORM IS NOT A SUBSTITUTE FOR A PROPERLY PREPARED AND EXECUTED CHANGE ORDER- YWa1 VAADV400--447.A4420'J63tiCantru Vkdw Chw W D•oam 'No 2 CD No 2 d c Anderson, Travis From: Neil Weiss <nweiss@city.ames.ia.us> Sent: Wednesday, March 6, 2019 S:36 PM To: Anderson, Travis Cc: Marc@shankconstructors.com Subject: Re: Additional Piping Attachments: Digester Basement Tee's.jpeg, Sludge Transfer- TeeJpeg rlarc- Could you please provide cost for the following items? 1. We would like to add replacement of the two tee's highlighted in the attached picture (Sheet 24). 2. We would like to replace the (2) 90 degree elbows on the sludge transfer line with tee's. The current elbow is shown in the attached photo. Thanks Neil Weiss, P.E. Environmental Engineer Ames Water & Pollution Control Department 515.239.5150 maim 515.370.4431 cell) 515.239.5251 fa.t -----Neil Weiss/COA wrote: ----- To: "Anderson Travis" <Travis.Anderson@strand.com> From: Neil Weiss/COA Date: 03/04/2019 04:07PM Cc: Marc(a@shankconstructors.com Subject: Additional Piping All, Here is a summary of the additional piping that we would like to get a cost proposal for. 1. Sheet 28 Section 4: We would like to replace the piping circled in red below associated with each of the PSP's. The vertical pipe on the discharge side has a sample port that we would like to include with the new piping. I have included a photo in the attachments that shows the sample port. 1 CrVP)� u ra (EL wea w w �( �.91! (d.9+ Y!S 296 (Q 93-25z 03 w =71 r scti u °H °V CN 9•PRS 239 (a 9s rsr + +/2'rA o'oa 776" � w w d ]79 )17 70 SECT]ON�� Replace Tee and 90 Replace(2)90's and vertical piping. 2. Sheet 28 Section 3: Please see the attachment. In order to replace PVC with ductile, we will need to replace the remainder of the PVC called out for in the pictures. Neil Weiss, P.E. Environmental Engineer Ames Water & Pollution Control Department 515.239.5150 main] 515.370.4431 cell) 515.239.5251 flax [attachment "Piping Replacement - PSP Sample Port.jpeg" removed by Neil Weiss/COA] [attachment "PVC Piping Sheet 28 Section 3.docx" removed by Neil Weiss/COA] 2 �i BIG, DS EL 85.91 8" OF EL- 85.91 PR PRICING REQUEST CONTRACTOR: PROJECT: Shank Constructors. Inc. Ames WWTP Digester Improvements 3501 85th Ave. N. Ames Iowa Brooklyn Park, MN 55443 SCI Project#1286 OWNER: City Of Ames IA SCI CPR NO.: 4 DATE: 03/22/19 DESCRIPTION OF WORK: Sludge Transfer 8" Tees SUB SHANK COST DESCRIPTION CONTRACTOR CONSTRUCTORS TOTAL Direct Cost Cost of Work Total Direct Cost $0 6,239.08 $6,239 Contractor's Fees Markup on Subcontractor-5% $0 Markup on SCI - 15% $936 Total Direct Cost & Fees $7,175 Supplement Costs Bonds & Insurances - 1.5% $108 GRAND TOTAL $7,283 The cost of this change order includes only those direct costs which can be identified at this time. There are no red-line drawings of the changes, impact or ripple costs and no delay costs included in this proposal. Should it be determined at a later date that we are experiencing impact costs because of multiple changes, delays or other causes beyond our control, we will submit those costs at that time and expect to be paid for those costs. Direct Job Time Extension: We are unable to ascertain the time extension needed. Once the engineer has approved this change we will contact the supplier to obtain the time required. Pricing is valid for 30 days, subject to review thereafter. CPR 04 - 8 Inch DI Tees Sludge Transfer Printed: 3/29/2019 SHANK CONSTRUCTORS, INC_. Ames WWTP Digester Improvement CPR Itemized Breakdown CPR 04 - 8"Sludge Transfer Ductile Tees Material Labor Size Description Qty. Unit Total Unit Hours 8" DI Flanged Tee 4 429.00 1,716.00 4.22 16.9 8" Blind Flange w/1" invert Tap 2 188.00 376.00 1.90 3.8 8" Bolt & Gasket Set 3 16.00 48.00 0.30 0.9 Demo - 8" DI Tee 2 = 4.00 8.0 Transportation to Site 1 300.00 Consumable Tools 1 $219.43 30.00 Safety 1 50.00 Cleanup 1 2.00 2.0 Non-Productive Su ervision\New La out\Redesi n 1 1.50 1.5 Change Docum., Drw s, Schedule &As-Built Costs 1 1.50 1.5 TOTALS 2,520.00 34.6 Labor Rate $107.55 Labor Total 3,719.08 Sales Tax - 0% TOTAL MATERIAL & LABOR 6,239.08 CPR 04 -8 Inch DI Tees Sludge Transfer Page 3 Printed: 3/29/2019 ei'lAM STRAND ASSOCIATES' Work Change Directive Directive No.: 03 Contract No.: 2019-017 Owner: City of Ames IA By: Travis Anderson Contractor: Shank Constructors Inc Date: 05/08/2019 Description of Work Cost Cost Deduction Addition Replace suction and discharge piping on 5 diaphragm pumps and replace $42,650.00 PVC piping with glass lined ductile iron piping as shown in the attachments. Total $42,650.00 Remarks: Change in Contract Price by: ❑ Supplemental Unit Price ❑ Unit Price ® Lump Sum Requested by: Strand Associates, Inc. 05/08/2019 Date Recommended by: l011.` 12019 Travis Anderson, Strand Associates, Inc.® (Engineer) Date Accepted by: Marc Hansco Shank nstru Inc. (Contractor) Date Approved by: Rty of mes (owner) r s' ) , c Date —THIS FORM IS NOT A SUBSTITUTE FOR A PROPERLY PREPARED AND EXECUTED CHANGE ORDER-- lrw S V AAM44W-"94M" WO.AC xrAix7bm\V ak Ctivw Drwl e*4o 3NWCD No 3.doc■ PR PRICING REQUEST CONTRACTOR: PROJECT: Shank Constructors, Inc. Ames WWTP Digester Improvements 3501 85th Ave. N. Ames Iowa Brooklyn Park, MN 55443 SCI Project#1286 OWNER: City Of Ames IA SCI CPR NO.: 3 (Revised 2) DATE: 05/08/19 DESCRIPTION OF WORK: Diaphram Sludge Pump Fittings & Sheet 14 Section 3 PVC Replacement Note. Existing SS sample nipples and valves will be reused SUB SHANK COSTDF$CRIMON conrRncI'OR CONSFROCTORS TOTAL Direct Cost Cost of Work Exterior Solutions $300 Fresh Blast $450 Total Direct Cost $750 35,854.05 $36,604 Contractor's Fees Markup on Subcontractor-5% $38 Markup on SCI - 15% $5,378 Total Direct Cost & Fees $42,020 Supplement Costs Bonds& Insurances - 1.5% $630 GRAND TOTAL $42,650 The cost of this change order includes only those direct costs which can be identified at this time. There are no red-line drawings of the changes, impact or ripple costs and no delay costs included in this proposal. Should it be determined at a later date that we are experiencing impact costs because of multiple changes, delays or other causes beyond our control, we will submit those costs at that time and expect to be paid for those costs. Direct Job Time Extension: We are unable to ascertain the time extension needed. Once the engineer has approved this change we will contact the supplier to obtain the time required. Pricing is valid for 30 days, subject to review thereafter. CPR 03 (revised 2) - Diaphram Sludge Pump Fittings & Sheet 14 Section 3 PVC Replacement.xlsx Printed: 5/8/2019 SHANK CONSTRUCTORS, INC. Ames VVMP Digester Improvement CPR Itemized Breakdown CPR 03 Material Labor Size Description Qty. Unit Total Unit Hours 4" DI Flanged Tee 5 193.00 965.00 3.06 15.3 4" DI Flanged 90 (Updated) 5 179.00 895.00 2.13 10.7 4"x6" DI Flanged Base 90 5 454.00 2,270.00 2.80 14.0 6" DI Flanged 90 (Updated) 5 282.00 1,410.00 2.74 13.7 8" DI Flanged Spool Pie 1 303.00 303.00 3.46 3.5 8" DI Flanged Pipe Riser 1 972.00 972.00 6.50 6.5 8" DI Flanged Tee (Updated) 1 684.00 684.00 4.22 4.2 8" DI Flanged 90 for ventgooseneck) (Updated) 2 459.00 918.00 3.37 6.7 8" Victaulic Split Flange 1 206.00 206.00 0.30 0.3 4" Gaskets & Bolts 15 11.00 165.00 0.20 3.0 6" Gaskets & Bolts 10 14.00 140.00 0.25 2.5 8" Gaskets & Bolts 5 16.00 80.00 0.30 1.5 8" EBBA Flange Adapter 2 171.93 343.86 1.00 2.0 6" DI Flanged Pipe Riser w/3/4" Tap (Updated) 5 442.00 2,210.00 4.09 20.5 12" Sano Tube per ft (Deleted) 5/8" Threaded Rod per ft (Deleted) 5.40 - 5/8" Plated Nut (Updated) 20 1.81 36.20 0.10 2.0 12" 3ft Round Concrete Base Pour & Rebar(Deleted) - Epoxy(Deleted) 50.00 - Grout Base 5 5.00 25.00 0.40 2.0 Demo - 4" DI Flanged Tee 5 - 1.50 7.5 4" Ductile Flanged 90 5 - 1.50 7.5 6" DI Flanged Base fitting(updated to sa vage existing anchors) 5 - 3.00 15.0 6" DI Flanged Riser 5 - 1.75 8.8 6" DI Flanged 90 5 - 1.75 8.8 Concrete Base (Deleted) - 8" PVC Tee 1 - 3.00 3.0 8" PVC Riser 1 - 4.00 4.0 8" Spool 1 - 2.00 2.0 Transportation to Site 1 750.00 Consumable Tools 1 $1,375.82 162.00 Safety 1 jUpdated 4.0 Cleanup 1 Updated 8.0 Non-Productive Supervision\New La out\Redesign 1 Updated 27.0 ,Change Docum., Drw s, Schedule & As-Built Costs 1 13.0 TOTALS 12,535.06 216.8 Labor Rate $107.55 Labor Total 23,318.99 Sales Tax - 0% TOTAL MATERIAL & LABOR 35,854.05 CPR 03(revised 2)- Diaphram Sludge Pump Fittingsl ER�t 14 Section 3 PVC Replacement.APrinted: 5/8/2019 C&B will test 10 randomly selected samples 1790 18a7 CHANGE ORDER PRICING/05/0812019 1810 S EA 04"FLG TEE GLS;Pr $193.00 $%5 00 18-v S EA 04•FLG 90 GLS/PC $179.00 $895.00 1810 5 EA 0644'FLG BASE 90 (,LS/PC $453.90 S2.269.00 1847 5 EA 06'FLG 90 GLS/PC $281-50 $1.407.50 1850 1 EA 08'FLG TEE GLS/PC $683.50 $683.50 1860 2 EA 08'FLG 90 GLS/PC 1459.7S S919.50 1870 1 EA 08-VIC ST 341 FLG(M,NO B/N) /PC $20S 65 $20S.6S 1880 5 EA 06'x 3'4 114"FLG x FLG GLS/PC $342.42 S1.712.10 IBM 1 TOTAL WEIGHT FOR ABOVE DIP 1890 1 EA APPROX FREIGHT CHARGE;ONE SHIPMENT' #VALUF1 $450.00 1-QLV 1 TOTAL ALL STEMS LISTED ABOVE #N;A $9,507.25 ( +ME)for Each Pipe Tap(Drill +Tap+Repair Glass Lining)) Page 1 SHOP DRAWINGS • PIPING • FITTINGS • MISCELLANEOUS SPECIALTIES Marc Hanscom From: Neil Weiss <nweiss@city.ames.ia.us> Sent: Monday, March 4, 2019 4:07 PM To: Anderson Travis Cc: Marc Hanscom Subject: Additional Piping Attachments: Piping Replacement - PSP Sample Port.jpeg; PVC Piping Sheet 28 Section 3.docx All, Here is a summary of the additional piping that we would like to get a cost proposal for. 1. Sheet 28 Section 4: We would like to replace the piping circled in red below associated with each of the PSP's. The vertical pipe on the discharge side has a sample port that we would like to include with the new piping. I have included a photo in the attachments that shows the sample port. e or r oz r w C+ 'Y MS EEL 93 25t •tt N 05 6'SCV _.", "!60 R sC.f]t , 1//,q CALLS r nos 4 Pn a M 00! - ! i (may.- 'Ii'L'S �.y.• \rl QEL l:G" 7 id as- O i • J SECTIQNr--.----, Y . �e Replace Tee and 90 Replace(2)90's and vertical piping. 2. Sheet 28 Section 3: Please see the attachment. In order to replace PVC with ductile we wi ll 111 need to replace the remainder of the PVC called out for in the pictures. Neil Weiss, P.E. Environmental Engineer Ames Water & Pollution Control Department 515.239.5150 main] 515.370.4431 cell) 515.239.5251 fax 1 ' j• �^ w r _ or f s t Au ` J � 01, • r t� - ,rg gotilk — • IBM Sheet 28 Section 3:The horizontal PVC line is called out to be replaced as shown in the photo below. In order to tie back into the vertical piping, the PVC above the last ductile flange should to be replaced with ductile. PVC Piping called out in specs to be replaced with ductile a, v F S The arrows indicate existing PVC that will need to be changed out to ductile. i Cost Proposal Request Digester Improvements Phase lI City of Ames, Iowa STRAND Contract 2019-017 ASSOCIATES' April 8,2019 COST PROPOSAL NO.: 004 TO: Shank Constructors, Inc. ISSUED BY: Travis Anderson DISTRIBUTION Marc Hanscom Shank Constructors, Inc. Neil Weiss City of Ames, Iowa Travis Anderson Strand Associates, Inc.® Please submit an itemized quotation for changes in the Contract Price and Time incidental to proposed modifications to the Contract Documents described herein. NTS: THIS IS NOT A CHANGE ORDER NOR A DIRECTIVE TO PROCEED WITH THE WORK DESCRIBED HEREIN. DESCRIPTIONS AFFECTING THE DRAWINGS Drawing 05-CME1.01 Sheet 8 004-01 Move waste gas burner, equipment pad, and guard posts to location east of Secondary Digester No. 1 as shown on the enclosed drawing in green. Route NG piping and DG piping to new location. Slope DG piping minimum 1/4-inch per foot along piping route with high point at bend to waste gas burner. Elevation of waste gas burner concrete pad shall be approximately 3-inches above existing grade. Coordinate locations of guard posts with Owner. 004-02 Delete work associated with new gravel road near original waste gas burner location. 004-03 Delete work associated with grading the area around original waste gas burner location. SLABS.\MAD440&449%"29`003CarsuuannWcd hopoW RewegACM*Am CPR No.4.&- Onnrwo.v.,Mr r•KYENr _� _ �.. _...__. �r..�' - ©aifi.c fo[..../[oNcerrt r•.nort R[oGrm '�-- - -�--- �amele ONry SOLrf/al/Cd,OFI[r•HFO,r Stw[MtCN R ew 1 MR OMF.4T 00 Nei.QC R fu rM IrrM1,05 - � I Rwtll[D ro effult.MO PVNe Af SNe'Nl. mNrR.ciioe n RlrolnRt ro.o[i[a..,c Mlo — ..4� � � •Fe I rFolo.,0•.,icaeom nnFns ! — e- l-ESS ffaFn a WM 01.M.E.IFpAR rr..er � _� f'-0•CC.[.aWl Mt 1�0.naa mro�a sloar re,AArieN ra W.`�LL�_f] 1SLaK M I •. eu..Wntllt ba r,r.,o�1'-e•e[[w - M Wt w,rot o 1/r/P./er•Vot 1Rc>.rwTloNs 1 �•"�� _r x�uNcuN. ac,•.*EN no I 1 i e w-twat-oF.Frc o,-•>f-.f•MO i MPAWY�;AFWER R1b"ARI Mr-;TER NA ' e. [u FOL11.,Gf. SEDw4 i MD R[W a<[xinelo IgIG, , CILCIIKK 1F1MCC3.MK OrIQ YI[ d ICAr1AC3 ME YNblwco COMleKlwl 9Wt [0.00 L * - corr[v wrN a[N[en I ws.anr[tlof A 1 CONonr[ E 6 ua( nMD%NS,Mq On[ROE,OC SROM[.'r SOU MO 1N.4.rqf ,.Oe 1 CC A COwti Ac MID R e[7rONS, !w1 C CIGW OUTF�-- E d fU�N2 MO]llel4F(/L(l,IIUC,l1R 1eG110Nf .'SCY 1 l'116 ff u 1.[=unroll[A n 0M.FMe. n ie, oC y [¢eo i:-.\ t E. E d eaa I -12.EOLV%0r aN 1,4 Ll¢i iWt R 10.+y /eR.N 0•W N ro 1NMQt ,—I SS On wi LP, "M Dana COMA. [M.nt� -- 10•Fy t a.U ee. it¢.e1�7 • RI[R ro sRCYIGTM s[crroN u a o roe Fw.c \ ��[¢mu.a• w.,• , I I t2t ♦[�iCO F,M M%M•1!f/Oe fKi[y. _ -..�....... V-•.\ e•ST + I J y .•rFf Nt Q i 00•fY __ M/SCM tam I a 4DIOWAV � - n „+ cc ' .CAU0[fr e.000 9 ` FAST.,a •p1)ie.i fl ft"OE ntWmN-,oi[• I wN. " ,1 �t10�0R I �[Ta.u •�. I FJ 1.800-292.8989I D i NO.2 e f o V= u c < — t y o _,- 4. ,r f — 111T �- saw a Enr�t•r —-- -„—- / S W —r So [¢ey) O O C ; E¢eei•s� I msnec a' [mnw,:'w'v.A.,I, > N f•0• —' I IplpKpplC f CwKACR lilt W[CN Oi reAV[NOR TO 11 rFrNfipN I1RIlc. Ol [IONS[[Al1NC)/•'LONwIR MIOU10 [enwR'S1N MO.N[SS MfE.:, `\' (FFI)Rho) N,• .. OO rllO.b[ICR TO 15 LeNTpN fIRMe At M [Mf1MC IOLt wt KOUYI[D/0[1rAq Y[>P WRFW ro encEwrtn IANf raft 1we.V[1-1,0 NeID DOFN 1/I••Fe NMa.q NRDwe.CONIMCIwI Ww KwfY E M[. l,o M 1/.'COriOIR rrgr \ u•Ar f¢ wuroF.•rc[urFTw a Omr1c ouiFa LAW rut ro.noarm uwrt F000EN[k COIKCrpN NO•.010[Mt l,[C[f1MfT \ rtwcTa sUFrA Ct TORW171q N10 mmNo roe rRwlmoN ro NOR. �np l WS OU F JOeI Mo. 1/4'NWnfO[ ARIr .Dort n 1f rww elro e.f rwlw.o _._A— MF Acfftt rtDO.Yt[K reUlO�q MO3rOwF[OT TO an1M0 wRlRll GS WC-4 CO R f IAGr10N FIM CAS NArGII[k:[NIIMNC \ relrwl MMaWNwl �fW I'Si IIeOe rofiaOU CMl WNWr / �EL-IYIiV w M roll.OrN[II wa fIwv[N[.F FMw.wrN+x "OO DOY O W W eil.(F.wonrol COIRtf ro Nn urU.CAa��ts. S•a / Full f•OIL � O[w,�wA<I110M1�IMl[¢o«!�fMa nr. $Al = Mall rOaCl[11 2L-p(l:;.t Oi N[F Fefl[OAS/UIFQ 1[[RT S.,CLL-rQt MCIK[M fe V-2 i0 1[w (S f,OQ) D—W f1M Mq to M-!-01" ... Q oosl.c aOMo Irifr ro■¢.v,(m. mNNorriw, I f"m,E e6rMUllwl NIOW[ feOrMe SLO.-M Oe Ml awriocAL IIeI1R MD Cw.r1EM N w.IwE a PIUTCR[leSrNG.'.V[V—SE—> M„w.b. Aw a .e--0 MO.n/rM.,aR flgM o STRAND Ml1•r[1rF1 N ROwnFD. WMa2 KM/1MT0,1W[t R SAM Poll clASf �� pJ�' �� reoKx r1oF.at caNlx[ Nt - e ss a oM1nN .r-e•, worse c AM o LDCA a .ALL � - wooe Doslrw sw[oas [a WIs. iltc" Mo[o. i urY[Nr weMll rNw s*Tcei al^FirN w r%rwa w i ASSOC I A T E S' wo[erRn F OewroN C—sm fu M,o'-0•R.O.n/DM1O[w llM.at f4.ppl1 KM/WIGM sm t K RM PoF CUR i. 1' �T)&4GRETE SLAB REPLACEMENT oMva f.w c Al o l,CAl �� s 06CME1.01 From: Anderson,Travis Sent: Monday,May6,20199.38AM To: Austin,Samantha Subject: FW:Waste gas burner From:John Lewis Whn@shankconstructors.com> Sent:Monday,April 15,20191:24 PM To:Anderson,Travis<fravds.Anderson@strsnd.com>;Neil Weiss<nweiss@dty.amesJa.us> Cc:Marc Hanscom<Marc@shankconstructor%xom>;Randy Hinders<Randy@shankconstructors.com>;Wirtz,Randy dtandy.Wlrtz@strand.comr,Brian Shank<Brian4lishankconstructors.can> Subject:RE:Waste gas burner At this time now that the location has been finalized we are proposing a No Cost change with schedule extension,I am currently working on adjusting the schedule to submit the requested time. Feel free to contact me to discuss. Thanks, Fl oae Anderson,Travis(mailto:TravisAnderson@sband.com] Sent:Monday,April 15,2019 12:19 PM To:Nei Wass;John Lewis ft Marc Hanscom;Randy Finders;Wirtz,Randy;Brian Shank Subject:RE:Waste gas burner John/Marc,any updates on this? From:Anderson,Travis Sent:Monday,April 8,201910:07AM To:'Neil Weiss'<nweiss@dty.ames.ia.us>,,John Lewis dohn@shankconstruetors.com> Cc.Marc Hanscom<Marc@shankconstructors.com>;Randy Hinders<Randv@shankconstructors.com>;Wirtz,Randy<Randy.Wirtz@strand.com>;Brian Shank<Srian@shankconstructors.com> Subject:RE:Waste gas burner See the attached CPR for this lunge.Please provide the cost proposal today or tomorrow so that we can finalize this change as soon as possible. Thanks, Travis From:Neil Weiss<nweiss@dtv.arres.ia.us> Sent:Friday,April 5,2019 3:51 PM To:John Lewis<John@shankconstructors.com> Cc:Anderson,Travis<TravIs.Anderson@Mnd&-9m>;Marc Hanscom<Marc@shankconstructors.com>;Randy Hinders<Randy@shankconstructors.com>,Wirtz,Randy<R4ndy WirtzFastrand.com>;Brian Shank<Bnan@shankconstructors.com> Subject:Re:Waste gas burner Please proceed with the change and we can talk about the price difference next week. Thanks, Neil Weiss,P.E. Env tronmenml Engineer Ames Water&Pollution Corllrol Department 515,239.5150 main]515.370.4431 ceg 515.239.5251 fax -----'John Lewis"4ohn9shankconstructors.com>wrote:----- To:'Anderson,Travis"<Travls.Anderson@strand.eom> From:"John Lewis'4ohn@shankconstrtzctws,c=> Date:04/05/2019 03:29PM Cc:"Marc Hanscom'<Marc@shankconstructors.com>,'Randy Hinders'<Rand y@shankconstructors.cono,"Nell Weiss'<nweisspcky.ames.la.us>,'Wirtz,Randy' <Ra- .W1rtz4Wra-nd.conl'Brian Shanle<BAan@shankconstructors.com> Subject:Re:Waste gas burner Are we to proceed with this change or are we to stop work pending pricing and appmval? At some point Monday well No*be as far as we can go until we have an answer, Feel free to give me a call to discuss. Thanks, John On Apr 5,2019,at 3:D4 PM,Anderson,Travis<Travis.Anderson @strand.com>wrote: Following up from our discussion yesterday,it is acceptable to relocate the waste gas burner to the east side of the digesters as shown xn the attached sketch.There will also be modifications to the new gravel driveway due to the new location. We will send a cost proposal request on Monday with further details. The City would still prefer that the light pole gets moved,but we will likely adjust the location from that shown on the current drawings. Marc/Randy H.-if you have feedback regarding the exact location let us know. I believe we are well away from the electrical lines with the new location,but please confirm Travis Anderson,P.E Strand Associates.Inc't dmiBIODLlarl 608.251.4843 ext 1023 traus.andersonostra<nd.com I www.strard.com P.E.(a,WI) Excellence in Engineering Since 1946. From:Neil Weiss<nwe_issocity.arnes.N.us> Sent:Friday,April 5,2019 2:14 PM To:Anderson,Travis<Tr2wi5.Ander;"strand.corru Subject:Re: Waste gas bumar 1 Anderson, Travis From: Marc Hanscom <Marc@shankconstructors.com> Sent: Monday, May 6, 2019 8:49 AM To: Anderson, Travis Cc: 'Neil Weiss' Subject: CO# 2 Contract Dates Travis, Please include the following contract date changes to CO#2. 1. Milestone 1,June 17 2019 2. Milestone 2, September 10 2019 3. Substantial Completion, December 312019 4. Final Completion, February 26 2019 2020 Thank you Marc Hanscom Shank Com"dom Inc. 3501 85'Avenue North Brooklyn Park,MN 55443 763.488-4008(Office Direct) 763-238.8751(Cell) 763.424-8300(Shank Office) 763424-8303(Fax) 1