Loading...
HomeMy WebLinkAbout~Master - Change Order No. 2 for the Repair of RDF Storage Bin RESOLUTION NO. 19-140 RESOLUTION APPROVING CHANGE ORDER NO. 2 ON CONTRACT WITH SARGENT & LUNDY, LLC, FOR ADDITIONAL ENGINEERING SERVICES FOR THE REPAIR OF RDF STORAGE BIN FOR THE CITY OF AMES, IOWA WHEREAS, it has been determined that a Change Order is necessary and proper on the above Contract. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 2 on contract with Sargent & Lundy, LLC, of Chicago, Illinois, for the additional engineering services for the repair of RDF Storage Bin be approved and adopted as attached hereto and made a part hereof by this reference. ADOPTED THIS 91h day of April, 2019. Diane . Voss, City Clerk John . Haila, Mayor Introduced by: Corrieri Seconded by: Gartin Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Martin, Nelson Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 9`h day of April, 2019. CITY OF CHANGE ORDER NO.IL A I I I e S CONTRACT / BID NO: 2018-005 PURCHASE ORDER NO: 54838 April 9, 2019 Project. T Engineering Services for the Repair of the RDF Storage Bin Contractor Name: Sargent & Lundy LLC Change Orders Ap roved to Date: Address: 55 East Monroe Street 1 $19,900 3 City,State, &Zip Code: Chicago, IL 60603-5780 2 4 The contract is modified as follows upon execution of this Change Order. The changes included in this change order are made in order to carry out the original intent of the contract. The changes included in this change order are to be accomplished in accordance with the terms. stipulations, and conditions of the original contract as though included herein. DESCRIPTION NTE AMOUNT Change order to Sargent & Lundy to provide additional engineering services necessary to rebid and repair the RDF Storage Bin as described in a letter dated March 15, 2019. from Sargent & Lundy. These additional engineering services include 1) Revisions to the plans and specifications due to beneficial design $15 600 changes affecting the repair scope of work discovered or initiated by staff and Sargent & Lundy during the initial bid period. Additionally, bidders asked questions or made suggestions during the initial bid period that also resulted in beneficial changes to the design and the scope of work for the repair. 2) Updating the engineer's cost estimate to reflect the changes in the $3.800 scope of work. 3) Allowance for two meetings at the power plant site to support the $6.400 rebid of the project The first meeting is for the pre-bid meeting with (including potential bidders. The second meeting is for the kick-off meeting expenses) with the selected contractor. 4) The preparation of as-built drawings for the project. $7.900 TOTAL (not-to-exceed): $33.700 r Contract Price: Original contract rice: $52,096.00 Change orders approved to date: $19,900.00 Amount of this change order: $33,700.00 Adjusted contract price including this change order: $105,696.00 Re mmende : Accepted b Contractor: cce ted for C' of A!n s: D nald Kom, Director Signature John A. Haila, Mayor City of Ames Electric Services Christopher Woods-Vice President City of Ames, Iowa Printed name &title /dj q5T At;a'- /2 April 5, 2019 17oi J If Date Date Date