RESOLUTION APPROVING A PROFESSIONAL SERVICE AGREEMENT WITH
SHIVE HATTERY INC., FOR DESIGN SERVICES FOR THE IOWA STATE
UNIVERSITY RESEARCH PARK PHASE IV IMPROVEMENTS PROJECT
FOR THE CITY OF AMES
WHEREAS, in the summer of 2018, work began on the development of an Iowa State
University(ISU) Research Park lot located at 3525 South Riverside Drive for John Deere; and,
WHEREAS, the next phase of ISU Research Park Improvements (Phase IV) includes the
development of the surrounding area and public improvements, which include the paving of
approximately 1,570 feet of South Riverside Drive, 1,860 feet of Collaboration Place,the extension
of sanitary sewer and water main, and the installation of electric service improvements and street
lighting; and,
WHEREAS, the funding for these improvements will be provided in part through an
Economic Development Administration (EDA) grant that was awarded in September 2018 and in
addition to the EDA grant funds,a Revitalize Iowa's Sound Economy(RISE)grant was also awarded
in January 2019; and,
WHEREAS, because the EDA grant is federally funded, City staff followed the federal aid
approved process for consultant selection; and,
WHEREAS,a Request for Qualifications(RFQ)was sent out in June 2018 for two separate
projects; utility improvements and street improvements and due to the delays in the grant
applications and awards,the utility improvements project was no longer feasible as a separate project
therefore, only the five consulting firms who responded to the street improvements project were
evaluated; and,
WHEREAS,Shive Hattery,Inc.,was scored by the RFQ evaluation team and found to be the
most qualified firm to develop the plans for this improvement project and staff has worked with
Shive Hattery to draft a Professional Service Agreement(PSA); and,
WHEREAS, the Professional Service Agreement has been modified to include additional
federal requirements and has been reviewed and approved by the City's legal department and the
EDA with an amount not exceed the total cost of$291,920; and,
WHEREAS, the construction inspection services are not included in this PSA and another
RFQ will be created and issued for those services; and,
WHEREAS,the project will be primarily funded with a federal EDA grant and a state RISE
grant;however,these grants will provide approximately 90%of the estimated project costs with the
remaining funding being provided with tax increment financing(TIF)abated GO bonds and City of
Ames Electric funds; and,
WHEREAS,of the$493,939 available for engineering and administration,$291,920 will be
allocated for the design PSA with Shive Hattery and the remaining$202,019 is available for a future
PSA for construction inspection services with a firm yet to be determined.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that the Professional Service Agreement with Shive Hattery Inc.,for the design of the ISU Research
Park Phase IV Improvements Project in an amount not to exceed $291,920, is hereby approved.
ADOPTED THIS 9t' day of April, 2019.
Alf - /' A )&"-
Af
Diane R. Voss, City Clerk John . Haila, Mayor
Introduced by: Corrieri
Seconded by: Gartin
Voting aye: Beatty-Hansen, Betcher, Corrieri, Gartin, Martin, Nelson
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 9t'day of April, 2019.